"These early ships and boosters are already outdated by improved designs in production or on the test stand, so this booster loss does not change our timeline to reach high volume, fully reusable Starship flights."
Replying to @DJSnM
Yes, the green flame is caused by burning copper from depleting fuel in the regenerative cooling circuit and going oxygen-rich (closer to stoichiometric temperature) in the main combustion chamber.
Slight underperformance of engines on this flight is the reason. The booster is meant to land with tiny residuals, so the solution is to improve engine performance and performance consistency (underway with Raptor V3.2), as well as adjust flight software to do MECO1 about one second earlier to ensure enough propellant for boostback and landing (tiny change).
These early ships and boosters are already outdated by improved designs in production or on the test stand, so this booster loss does not change our timeline to reach high volume, fully reusable Starship flights.
1
142
Reinstate Jensen @TheJensenLetter
"Is anyone ever going to tell the truth about what's happening here?"
🤖 Made with AI
69
Read the Stand with Jensen letter and consider adding your name. #StandwithJensen standwithjensen.com/
101
This applies to Jensen as well. Bring him back!
SpaceX President @Gwynne_Shotwell on if @elonmusk ever left:
" There is no one that can run this company other than Elon."
" He's probably the best CEO in history."
" The company would not collapse, obviously, without Elon, but it would by no means be the same."
"We'd survive, but it would be a different company. It'd be a shame."
95
He's right. No orbital compute for the next two decades, for Amazon.
AWS CEO, Matt Garman, on orbital data centers:
"I think that it is highly unlikely to be economically feasible or practical in the next decade or two."
"I mean, here's the thing, it sounds good. You get free energy and it's up there somewhere. That's great. Number one, launches are still relatively infrequent and expensive."
"We're landing in a data center today, one GPU every 14 seconds. We don't do a launch a day for the world. And that's just us doing one GPU...rack of GPUs, you know, might weigh a ton, so I don't even know if you can stick that on a launch vehicle or how many you can get up there."
Via @alexeheath
$SPCX $AMZN $NVDA
1
2
480
This
The idea that the US midterms will somehow derail the AI data center buildout strikes me as another deeply flawed narrative
A few reasons why:
1. These elections were about an unpopular, seemingly endless war in Iran, soaring energy prices, tariff chaos, ICE confrontations and the broader cost of living squeeze. Hardly a referendum on AI infrastructure
And here’s a useful reminder: Virginia, America’s largest data center market by far, is governed entirely by Democrats. Political affiliation is clearly not the determining factor
2. AI infrastructure investment has become one of the most important engines of US economic growth. We’re talking hundreds of billions in capital spending, construction jobs, manufacturing demand and substantial tax revenues
With elections behind us, the incentives change. Campaign rhetoric is cheap. Governing means delivering investment, jobs and revenues
3. Remember how capitalism works: capital is mobile, and jurisdictions compete for it
If Texas overplays its hand, another state will gladly take the investment. If enough US states make themselves unattractive, other countries will compete for it
The demand for compute doesn’t disappear because some politicians dislike the infrastructure required to supply it
4. A substantial pipeline of projects is already permitted, financed, contracted or under construction. These are multiyear commitments involving utilities, construction companies, equipment suppliers and customers
Changing the political landscape doesn’t magically unwind those commitments
5. There’s also a national strategic dimension. AI compute is increasingly critical infrastructure, and the US is competing with China for technological leadership
Ofc some projects will face delays, additional costs or tougher requirements around electricity, water and local infrastructure. Some probably deserve it. And some projects may relocate
But that’s a very different proposition from a nationwide collapse in AI infrastructure spending
Bottom line: The economic incentives, competitive dynamics and strategic imperatives behind this investment cycle are vastly more powerful than the political noise surrounding the midterms
Data centers will get built. Now that the elections showdown is over, time to get back to work and build
149
Worth reading again. @SpaceX will buy any GPUs that can't be turned on and the probability of data center delays just went higher. SpaceX's path to 20GW of power runs through MN & TN
Replying to @UnstructuredCap
Look, I appreciate this tone.
We can engage this way
We can't engage when you're point is 'he didn't include taxes lol, what a moron!'
Revenue
>> I actually included the assumptions. I didn't explain the logic, but nobody has given assumptions like this publicly before. I'm happy to explain the logic in areas but literally don't have time to explain the logic everywhere. I have been studying this company for 10 years. I can guarantee if we spoke about any individual assumption you'd be like "holy shit he has thought a lot about this"
>> launch. SpaceX has 3 Falcon 9 launch pads. SpaceX should have 4 Starship launch pads operational by ~the end of 2026 (2 in TX and 2 in FL). There's a lot of uncertainty in the launch timeline but this basically comes from ramping towards a similar launch cadence per pad as Falcon 9 has been operating at the last two years
Profitability
>> yes I'm forecasting SpaceX EBITDA margins to be much higher than the hyperscalers. Across connectivity and SI. I view SpaceX as a vastly better operational company than any of the hyperscalers. I know this is provocative. I basically believe SpaceX will be able to turn on a GW datacenter about 2 years faster than any hyperscaler. This speed advantage results in an extremely high EBITDA margin. Starlink is already an extremely high EBITDA margin that's kind of masked by user terminal sales and other up-front costs
Capital Efficiency
>> One of my core assumptions is that hyperscalers are delayed turning online big projects. And Neoclouds deeply struggle. This is a spectrum of just severe delays to outright bankruptcy.
The way this manifests is SpaceX having a larger and larger percent of the inference compute supply. I'm basically modeling the following scenario:
1) a massive increase in inference demand (~3x from now to end of 2027)
2) a large increase in SpaceX's percent market share of the inference compute supply
3) some neoclouds being so delayed that they're forced to sell some hardware at a discount to SpaceX (which starts to show up in 2028)
These things together keep rev/GW high and have CapEx/GW going down slightly (only for SpaceX)
---
In terms of not showing assumptions, do you understand how unusual it is for someone to put out work like this into the public domain?
I have spent a decade studying this company and another decade before that studying the semiconductor + space industries
It would take me at least 10 hours of just talking outloud to explain the assumptions that sit below the level of assumptions here
And 100 hours to put it into a form that would be easy to consume (not just verbal)
156
Remember when compute in space wasn't going to work!?
Our TPUs just phoned home... from space.
ICYMI, on October 1, we sent four TPUs into orbit to test whether our AI hardware could operate in space. The initial goal was to see if our chips could turn on, process a prompt, and transmit a response back to Earth.
This week, we got our answer. ✨
This milestone brings us one step closer to understanding if space-based compute is possible. We’re sending two more TPU-equipped satellites to orbit in 2027 for our next milestone.
Watch this space 👀 and learn more about the first milestone of our long-term moonshot with Project Suncatcher ↓
2
214

















