Airlock Media and Design (@AirlockDesign) header
Airlock Media and Design (@AirlockDesign) profile picture

Airlock came from my love of space history. A former curator of a space museum, it's in my blood. Now I do space-related art with a twist.

Melbourne, FL, United States
Joined April 2020
Photo by Airlock Media and Design (@AirlockDesign)Photo by Airlock Media and Design (@AirlockDesign)Photo by Airlock Media and Design (@AirlockDesign)Photo by Airlock Media and Design (@AirlockDesign)Photo by Airlock Media and Design (@AirlockDesign)Photo by Airlock Media and Design (@AirlockDesign)Photo by Airlock Media and Design (@AirlockDesign)Photo by Airlock Media and Design (@AirlockDesign)Photo by Airlock Media and Design (@AirlockDesign)Photo by Airlock Media and Design (@AirlockDesign)
Airlock Media and Design retweeted
You won't want to miss this Twitter Spaces event tomorrow! Legendary Apollo Flight Director Gerry Griffin and our own NASA Historian Jennifer Ross-Nazzal will be part of the conversation.
Join our Twitter Spaces event TOMORROW at 2 pm CT as NASA experts discuss the #Artemis I milestone that will break the current record held by Apollo 13. Got questions for us? Use the hashtag #askNASA. #Artemis teapaw.org/i/spaces/1yoKMZObjYXGQ
1
22
3
86
Airlock Media and Design retweeted
Check out this slow motion shot of the four RS-25 engines and twin solid rocket boosters as they ignite and light up the night sky - lifting SLS off of Launch Pad 39B and sending @NASA_Orion toward the Moon!
23
283
15
1,776
Airlock Media and Design retweeted
LIVE NOW: The @NASA_Orion spacecraft is performing its first powered lunar flyby. Orion will make its closest approach to the lunar surface during the #Artemis I mission - approximately 80 miles – at 7:57am ET (12:57 UTC). teapaw.org/i/broadcasts/1djGXlykv…
281
2,076
292
7,268
Airlock Media and Design retweeted
While #Artemis I is uncrewed, a manikin named "Commander Moonikin Campos" is among the test devices flying aboard @NASA_Orion. The name honors NASA engineer Arturo Campos, who helped bring the Apollo 13 crew safely home to Earth. nasa.gov/specials/moonikin-c…
115
802
77
4,862
We are going! @NASA_SLS and @NASA_Orion lifted off from Pad 39B at 1:47 am EST for @NASA's #Artemis I mission to the Moon. Follow the mission HERE >> go.nasa.gov/3AjxKQQ
8
175
12
983
Airlock Media and Design retweeted
Trans-lunar injection burn complete! @NASA_Orion is on its way to the Moon! Thanks to ICPS, @NASA_SLS's upper stage, for the push to get us on our way.
27
193
23
1,553
Airlock Media and Design retweeted
LIFTOFF! @NASA_SLS and @NASA_Orion launch on their first flight, the #Artemis I mission. Keep checking back for more launch images 📷➡️flic.kr/s/aHBqjzG1pG
84
1,076
143
6,161
All elements polled are 'go’ to proceed with the terminal count. Countdown clock is resuming at T-10 minutes. No constraints to launch.
79
590
216
2,639
We are now in replenish mode on upper stage for both liquid hydrogen and liquid oxygen. We remain in a hold.
70
235
44
2,051
Upper stage liquid hydrogen is now in 'topping'. The Range Safety Officer is testing the Flight Termination System (FTS). The launch team is determining our new launch time.
85
390
86
2,588
We are in our planned hold at T-10 minutes. Currently, the upper stage liquid hydrogen is 78% filled. Core stage has been topped off – both liquid hydrogen and liquid oxygen are 100% filled. The ethernet switch has been replaced and will be verified.
49
399
70
2,597
The 'red crew' team has successfully remedied the leak, and it has not recurred. Bad ethernet switch is being replaced now.
37
228
63
1,757
Upper stage is now in fast fill at 58% liquid hydrogen filled. Liquid oxygen for both upper and core stage are in stable replenish.
7
73
4
667
Range Safety Officer reported to NASA Test Director a problem with a bad ethernet switch and the Range is currently working to change it out and reverify it. Range reporting that it should take about 70 minutes to do that work.
61
159
91
1,250
Fastfill complete and back in core stage topping.
13
90
8
783
Thank you to our 'red crew' team that has completed their work at the pad. We are now back in replenish for core stage liquid hydrogen. Team is working on resuming flow to the upper stage.
39
271
38
2,439
The ‘red crew’ has left the launch pad.
31
182
26
1,434
The official #Artemis I broadcast has begun!
LIVE NOW: The #Artemis era of exploration begins today with @NASAArtemis I, the first integrated test flight of the rocket and spacecraft that will bring humanity to the Moon. Watch @NASA_SLS and @NASA_Orion embark on their first voyage. teapaw.org/i/broadcasts/1jMKgLaeY…
7
82
3
425
The 'red crew' at @NASAKennedy heading out to the rocket on the mobile launcher at Launch Pad 39B.
49
407
104
2,564
The ‘red crew’ deployed to Launch Pad 39B.
36
112
13
1,023