Replying to @GOtransit
@GOtransit @GOtransitKT @PrabSarkaria @Metrolinx @fordnation How many times must someone have to complain. Approx. 250 people here, maybe more waiting for two 30 buses to UW. It was not safe getting on the bus, and my single deck bus has 15 people standing. This is a disaster.
And of course in Meadowvalw we make the detour for no reason to just tease the 30ish people waiting and not letting anyone on the bus. What a joke.
1
2
133
They’ve radioed another bus in for Meadowvale in 15 minutes because od the amount of standees and people left behind. Another bus! Another driver! More resources waited! A worse rider experience.
When will @GOtransit @Metrolinx @PrabSarkaria learn?
1
2
174
Hi @GOtransit @GOtransitKT @Metrolinx Today onboard route 30A from UW, departing at 2:45, I witnessed something incredibly dangerous. The bus jerked to a stop, and a man in standing room fell crashing down in the aisle incredible hard. He appeared well, but it could’ve been worse
1
2
177
@fordnation @PrabSarkaria @GOtransit @Metrolinx The 30/30A consistently leaves dozens waiting for the next hour’s bus round at WLU, and in Kitchener. This is not adequate. More service is needed, on the Kitchener Line! If this is not possible, further 30A/30s need to run!
1
1
105
Additionally, the buses reach capacity on Friday afternoon/evening runs at WLU, so it is imperative that a 30E section departing from UW and not Bramalea runs, and additional service should support Kitchener! @GOtransit @PrabSarkaria you work for us and are paid by us, do better!
1
133
Hi @GOtransit @GOtransitBus @GOtransitKT looking at the updated bus schedule for this september, I noticed a new route 30E, a direct connection for UW/WLU to Bramalea. What are the specifics of this bus, when does it run and what purpose does it serve? Is it for students?
1
2
232
Doesn’t Bloor GO have four tracks already? Or is the fourth track strictly Milton?
And if Milton gets the RER treatment, wouldn’t it need another track going into Union?
Metrolinx work on Bloor Station also includes a fourth track:
"A new, approximately 2.5-kilometer section of fourth track, will be installed from Lansdowne Avenue to Dupont Street to increase capacity on the Kitchener Line."
gotransit.com/en/the-future-…
1
2
158
Replying to @RM_Transit
@RM_Transit @BramptonTransit @Metrolinx @ONtransport The cross fare program has ended the 501c. The 501c is likely BT’s most critical route and it’s being canceled! 501 frequencies likely will not be enough to take 501c riders! Keep the 501c going to @YorkUniversity!
The line for the 501c is routinely 100m+ long and people are almost always left behind in the evening. People want and need this bus. People squeeze on, nose touching the front door, bus wayyy over capacity.
The 501c shoudn’t be canceled, it should instead be more frequent!
1
1
203
Replying to @CityBrampton
@CityBrampton @BramptonTransit I understand that using Highway 407 costs money. The way people are moved on the 501c should do well to cover the overhead costs.
The fact of the matter is this service should not need to worry about cost. It is a service, not a business.
1
65
How come transit projects and great heavy rail require tons of environmental assessments and time consuming burraucracy whereas highways to nowhere that are objectively useless and destructive can skip all of that? 🤔
A joint application has been filed by the federal and provincial governments to cancel the environmental assessment for the proposed Highway 413. toronto.citynews.ca/2024/03/…
1
234
Replying to @GOtransit
@GOtransit @Metrolinx @GOtransitKT @PrabSarkaria @RM_Transit @ONtransport Look at the line for the 30A bus to Kitchener/Waterloo. 2 buses is *NOT* enough. The driver could be heard radioing control that they needed more capacity. Please begin Kitchener Line service on weekends.
@GOtransit @Metrolinx @GOtransitKT @PrabSarkaria @GOtransitBus @ONtransport Can I have someone acknowledge this issue please? It is a matter of safety now.
2
1
286
@Metrolinx @GOtransit @GOtransitKT @PrabSarkaria @ONtransport There are now safety concerns at this overcrowded platform. Pushing and shoving is taking place, a seperate line is forming and there is chaos. It will
not be long until someone getd hurt. Run the trains to Kitchener.








