$NUAI Phase 1 Signed is Worth $10 Today
Inspired by my friend @SmallCapSnipa publishing the Northland sell side analysis, I found it appropriate to keep it simple and stick to the same format.
Warning: this analysis is for Phase 1 only, and does not include Phase 2 or Phase 3 at TCDC that will at a minimum power 1.2 GW or 6x Phase 1.
Now let's talk through some assumptions before you read the output I produced attached.
1) Rent - $riot executed for $130/kw/Month with $ant but my base case is $140 due to $NUAI being responsible for development and construction of the modular data centers versus just the powered pads and a later LOI date in September as power became harder to find in 2027
2) PUE - Northland is far too conservative as the $riot deal is 1.1. The initial LOI asked for 756 MW IT but landed on 910 MW IT because $ant opted for a simpler modular build and will be able to adjust power down during peak temperatures but will pay for the max capacity. My base case is 1.35 for now.
3) NOI / Ownership - 99% NNN and 95% for Vistra 5% share.
4) Multiple - Northland uses at 10 cap or 10x multiple but I find that cash return too high and believe 11x is more appropriate as a 9.1% cap rate is almost 4% higher than the 5.35% average of the 10 year and 20 year treasury. That's a very wide credit spread and the multiple should likely be 11.5x or 12.0x.
5) Build Cost - Same $6m assumption with 80% debt assumed.
6) DS0 - Used fully diluted shares of 160m from earnings to be conservative
7) Discount - Northland uses 11% for 2 years for a 2028 delivery but that's far too conservative as I believe delivery will be Q4 2027 given the modular build. That said, I upped the discount to 20% for one year for time value of money and execution risk.
Ted Warner just telegraphed Phase 1 delivery and most likely Phase 2 at the Cantor panel to mitigate regulatory risk upon approval of the company's air permit by starting construction as soon as possible.
I've never been more bullish on a setup because management is keeping it super simple which will result in accelerated institutional adoption as the deal structure can be digested in 5 minutes. See $riot performance following their deal versus peers.
Load up. Final call.
NFA DYOR
Harry Hodl retweeted
A few quick thoughts on the $NUAI earnings call:
As expected, one tenant, under exclusivity, and management says there is "full agreement on what the economics are going to look like." If it's anything like Riot's, which they confirmed was the case on the call, then we're in for some pretty stellar economics.
First modules September 2027, ready for service Q4 2027, in line with expectations for power from Vistra.
I was pleased to hear that the JV developer was removed at the tenant's request. The tenant wants to deal with NUAI directly, and NUAI keeps the economics a developer would have taken. That's a big shift from some sort of 50-50 economics split with Stream. We keep you keep 95% of the pie, with the other 5% going to a partner who is now motivated to deliver more power for a Phase 3 at TCDC. That's pretty huge!
Also, Macquarie's lease deadline is no longer an issue. Macquarie waived its repayment right for the missed Oct 8 deadline, and the PIPE paid off $60M of loans. About $20M of debt is left, fully cash-backed. Of course, this hurt investors to raise at the high $2s. A self-inflicted and unexpected wound.
This one was interesting: some of the $118M tied up in the Luminant LC could come back. The CFO said that once the lease is signed there are options to restructure the LC and release restricted cash. If ~$35M comes back, most of the near-term dilution goes away.
There is a lot of FUD on X around Phase 2. It's clearly moving, and fast! Mgmt expects the air permit by year-end as TCEQ is processing permits again and turbines arrive Q4'27-Q1'28. That last part tells me everything I need to know.
The stock has been responding very favourable in light of this commentary. Even the unfortunate news around Jensen couldn't hold $NUAI back.
Steady as she goes.
NFA
$NUAI has released its Third Quarter 2026 Business Update.
Highlights include:
✓ 207 MW of firm, contracted power
✓ Power availability expected in Q3 2027
✓ Initial ready-for-service targeted for Q4 2027
✓ In advanced negotiations on the Phase 1 lease documentation under a non-binding LOI covering TCDC Phases 1 and 2
✓ Site preparation underway
✓ Strengthened liquidity to support TCDC development
✓ Proposed Phase 1 modular build: preliminary cost estimate below half that of a comparable traditional build
“Responsible development has guided our approach from day one. That means designing power arrangements to avoid additional transmission costs for ratepayers, using water responsibly and giving local communities a voice. We want Texans to have a seat at the table and local residents and businesses to share in the opportunities TCDC creates,” said Charlie Nelson, Chairman and CEO of New Era.
Management will host a business update call and webcast on Thursday, November 12 at 8:00 a.m. ET to discuss the Company’s recent business developments and operational progress.
Register here: edge.media-server.com/mmc/p/…
investors.newerainfra.ai/new…
Harry Hodl retweeted
i’m giving one of you a fucking ROLEX
like + repost + follow me
one random winner picked 48 hours from this tweet. no purchase necessary
Harry Hodl retweeted
For those wondering what this means, this is one of the few sites in the US with 207 MW of live energy that is fully approved by the large load interconnection process.
As a result, $NUAI is poised to sign a long term off-take agreement with a hyperscaler or Neo Cloud in very short order.
This 207MW was originally committed to $CIFR and then to a hyperscaler. Both failed and NUAI prevailed. That is a testament to the quality of this management team. In doing so, NUAI now has the upper hand to negotiate a hell of a deal in what is the hottest datacenter market in history.
And it doesn’t stop there. With another 550 MW of on-site generation capacity already contracted, NUAI’s TCDC site will quickly become a mega project that values the company at ~$5-7bn (or greater) vs yesterday’s ~$0.6bn market cap.
Good day to be an $NUAI shareholder. Congrats to all.
Harry Hodl retweeted
$NUAI has entered into a 20-year PPA with a Vistra affiliate for up to 207 MW of firm, contracted power for Phase 1 of Texas Critical Data Center (TCDC).
The agreement provides New Era with power expected to be available in Q3 2027 from Vistra’s adjacent 1,180 MW Odessa generation facility.
New Era and Vistra have also entered into a development framework agreement that establishes a pathway for advancing future power development at TCDC and other New Era projects.
globenewswire.com/news-relea…
Harry Hodl retweeted
Let’s take a second and remind ourselves that $cifr @rftylerpage currently have 700 MW signed via Barber Lake, Black Pearl and Stingray.
I previously mentioned 477 MW available at Odessa, Ulysses, and Reveille with another 1.1 GW today via Colchis and Stingray. I’m assuming that Stingray got dialed down to 100 MW from 200 MW requested and I have questions on whether the $nuai will take possession of the same PPA previously held by $cifr for 207 MW.
Let’s assume to be safe Tyler has Ulysses, Reveille, Colchis and Stingray at his disposal for 200+70+1000+100=1,370
Assuming a PUE of 1.37, that’s 1 GW of IT load.
Given the current market conditions of secured power scarcity, Tyler can safely sign those sites for 2.0m per MW NNN.
That results in roughly 2B of stabilized NOI that at a 15x multiple has a EV of $30B and a cost of $12B, meaning there is $18B of equity value to create and the stock trades at just over $6B today.
The existing 700 MW signed conservatively has $10 per share of fully diluted value and even as much as $12.
So you’re basically paying $2B today for the potential of $18B tomorrow in my eyes with a team that is already delivering MW on time.
Act accordingly.
Harry Hodl retweeted
More on AI pacing:
Sarah Friar CFO of OpenAI yesterday on CNBC: “from where I sit today there is so much opportunity to drive growth that I am still highly focused on getting more compute to keep that flywheel going.”
Sachin Katti VP of Compute Strategy at OpenAI @sk7037 yesterday: “The way we will make sure frontier models are safe and aligned is by spending compute. So the counterintuitive point is that we’ll need even more compute to make sure future models are more safe and aligned.”
If you thought “pacing” was negative for AI infrastructure demand, think again. Almost as bullish as open-weight AI taking share but not quite.
Harry Hodl retweeted
A few people asked over the weekend what the calls to slow the pace of frontier AI mean for the buildout. Some thoughts:
Even if models never improved from here, just rolling out what they can already do would take more compute than the world can build for years. The debate about how fast AI should be allowed to improve is a fair one to have. It's about future generations of models.
Existing demand is the part I think people are misreading. Anthropic CEO Dario Amodei said in May they'd planned for 10x growth and were running at an 80x pace in the first quarter, and that's why they've had trouble supplying compute. OpenAI president Greg Brockman said in July they'll be in a compute shortage no matter what, and are choosing which products to scale. Google says it's processing 7x the tokens it did a year ago. Hundreds of millions of people use these models today, and most of them use a small part of what the models can already do. And every time more compute comes online, usage steps up again: limits come off for people already using it, customers who were turned away get on, and new use cases show up that weren't in anyone's plan.
Now supply. The constraint is HBM, the memory that sits inside every major AI chip. Three companies make it and all three are sold out this year. A new memory plant takes years to build. TrendForce has HBM shipments growing 50-60% next year. NVIDIA, the biggest buyer of it, expects its revenue to grow about 70% next year and calls that outlook 'supply-constrained', noting its customers' forecasts point closer to 100%. On our own bottom-up work, the memory constraint lands in about the same place as NVIDIA's growth number.
Then the chips need a building with power connected, which takes longer again. Goldmans reckons only about half the US capacity scheduled over the next two years will actually be built on time.
The risk to demand continues to seem heavily weighted to the upside. The risk to supply continues to seem weighted toward less capacity getting built, not more.
Harry Hodl retweeted
Huge news on $NUAI! Their Texas Critical Data Centers project just landed on the city Planning & Zoning agenda for next Thursday: Preliminary plat of "New Era, Phase 1," 63 acres carved out of the 440 acre campus, city staff recommending approval. It just got more real than ever. Not if but when.
It comes with a site plan: A 400,000 square foot data center building. That's Phase 1. Parking, on-site recycled water, and a private road out to Loop 338. The lot sits directly across the parkway from the power plants. Very industrial area, with no neighborhoods.
Why this matters: before a tenant signs, the land has to be a real lot with a real building plan. This is that step, in public, with an engineering firm's stamp on it. Nobody spends this kind of money on a hypothetical tenant. The plat now, soon the PPA, all leading to even bigger announcements. Will be a huge win for the community. NFA. @KashRamki @litigious_dulce @awilkinson @bitcoinbutcher1 $NUAI
Barclays is putting $SLNH on the AI infrastructure map.
In its latest screen of companies positioned to benefit from the hyperscaler spending boom, Barclays included Soluna Holdings alongside names such as CoreWeave, Nebius, IREN, Galaxy, Applied Digital, Cipher and Hut 8.
Barclays highlighted Soluna’s model of developing data centers around underutilized renewable power, placing the company directly at the intersection of energy, data centers and high-intensity compute.
The timing is notable. Soluna’s Q2 ownership data already showed a sharp increase in institutional participation, and Barclays’ inclusion adds another sign that the company is beginning to appear on the radar of larger investors following the AI infrastructure buildout.
With Kati 2 and Dorothy 3 pushing Soluna deeper into large-scale AI and data-center development, institutional attention could continue to build as the story becomes better understood.
Source: Barclays, via Investing.com
🔎 NEW KATI 2 FINDING $SLNH @SolunaHoldings
Something Changed on Metrobloks’ Kati 2 Page and Microsoft Just Got More Interesting
I went back to Metrobloks’ MFE-A page this week, less than two weeks after I last reviewed it around August 20–21.
The technical configuration has changed.
MFE-A is Metrobloks’ project name for Soluna’s Project Kati 2 in Willacy County, Texas. The full campus remains planned for 350 MW of Critical IT capacity, but the Phase 1 design is now far more specific.
Before — around August 20–21
• 150 kW+ rack density
• Hybrid air + direct-to-chip cooling
• Broader next-generation GPU-ready design
• Conventional UPS / standby-generator redundancy
• 350 MW campus built around larger modular blocks
Now
• 118 MW Phase 1 Critical IT
• 200 kW+ per rack
• 100% direct liquid-to-chip cooling
• VR200 / NVIDIA reference design
• 800 VDC IT architecture
• 4 × 25 MW high-density compute halls
• 18 MW dedicated network core
• BESS providing site-level N+1 resilience for up to one hour
The shift is substantial. Taken together, these specifications move Kati 2 much deeper into the architecture being developed for the Vera Rubin generation: very high rack densities, full liquid cooling, high-voltage DC distribution and large-scale integrated networking.
The 118 MW Phase 1 layout is also revealing. Metrobloks now defines 100 MW of high-density compute across four 25 MW halls, supported by an 18 MW network core. That is a much clearer picture of a tightly integrated AI deployment than the broader modular campus concept I were looking at less than two weeks ago.
The timing is equally important.
By August 13, Soluna said Kati 2 had completed design development, was moving into construction documentation, and was already under an exclusive LOI with a prospective Phase 1 tenant.
Then the public MFE-A configuration becomes materially more specific around GPU generation, power architecture, rack density, cooling, networking and resiliency.
That sequence fits a project moving from broad design development toward the requirements of an actual deployment.
And this is where the update adds a new layer to our earlier 12-part Kati 2 tenant research. (See the cited post below.)
Microsoft was already my leading candidate. The strongest direct bridge remains Ryan Carver, who joined Soluna as Chief Development Officer in July after more than a decade at Microsoft. Immediately before joining Soluna, he led Microsoft’s Fairwater build program in Wisconsin, working across the infrastructure functions required to develop hyperscale AI campuses.
He now leads Soluna’s AI/HPC development organization.
Fairwater is especially relevant because Microsoft is moving that platform into NVIDIA’s Vera Rubin NVL72 generation, alongside the same broader shift toward extreme-density racks, liquid cooling and next-generation power distribution that now appears in Kati 2’s public design.
That creates a notable convergence:
Ryan Carver → Microsoft Fairwater → Soluna
Fairwater → Vera Rubin AI infrastructure
Kati 2 → VR200 / 800 VDC / 200 kW+ / full liquid cooling
This technical layer now sits on top of the wider evidence we have already built: Carver’s Microsoft infrastructure network, the CO+I and energy connections, the Fairwater overlap, Kati 2’s large single-tenant scaling model, and an exclusive tenant process developing alongside the design work.
Google remains an important candidate and is also an early Rubin adopter, with its own strong South Texas energy connections. But when I combine the full research trail with this latest change in MFE-A’s physical architecture, Microsoft moves further ahead as my strongest Kati 2 tenant hypothesis.
The difference now is that the thesis is gaining support from somewhere new.
The design itself.
$SLNH $MSFT A few days ago, I teased some of the Microsoft connections I’d been digging into around Soluna’s Project Kati 2. The response showed that quite a few of you wanted to see the full research.
I’ve also been fairly quiet on X lately, and this is a big reason why. This took a lot more time and focus than I originally expected.
FOLLOWING THE POWER: The Case for Microsoft at Soluna’s Project Kati 2 --> Full 12-part investigation:
perspez.substack.com/p/follo…
I originally thought I could turn all of this into one detailed X post. That stopped making sense once the research kept expanding.
I ended up going through Microsoft Research, EDF, Masdar, Las Majadas, Project Tumbleweed, Fairwater, Ryan Carver, Siemens, Kati 2’s evolution from an 83 MW second phase into a 350+ MW AI campus, and the anonymous tenant now negotiating around its first 100 MW phase.
This has been weeks of digging through filings, research papers, company materials, historical agreements, infrastructure developments and personnel connections. I’ve built it piece by piece, and in the end I decided I’d rather share the full work than squeeze it into a few conclusions on X and strip away the context that makes the thesis interesting.
There was simply too much that would have been left out, so I put everything together as one long-form Substack instead.
12 parts. Weeks of research. One thesis: why so many independent trails around Project Kati 2 keep converging on Microsoft.
Enjoy the deep dive.
Harry Hodl retweeted
Scott Galloway is a perfect example of perhaps the most pernicious people in society: the stupid-smart person.
Educated beyond his intelligence. Smart enough vocabulary to justify his ego and smugness, but too stupid to understand basic realities of communists.
Smart people internalize history and make good decisions. They also know the dangers of hubris. Stupid people don't know enough to even opine on the issues in the first place, so their stupidity isn't a threat. But the stupid-smart person can teach at NYU, he can build a big successful business, he can even give a good TED Talk, but he's not smart enough to see the limits of his own capacities...so he asserts himself in society with an outsized level of confidence. Sadly, he's articulate enough to fool lots of people into elevating his stupid ideas...and that's the problem.
People listen to the stupid-smart guys, like him. Then they're genuinely baffled when there's a Kalashnikov pointed at their head as they're staring at a cinder block wall behind the politburo headquarters. In a functional society, this clown would be a pariah. I have precisely zero empathy for his plight in NYC. He endorsed it. Now he can eat it, good and hard.
Harry Hodl retweeted
AI stocks aren’t just growth or momentum stocks, a Few can double as defense stocks or strategic assets, which support national critical infrastructure
Intelligence assets are mispriced and misunderstood today. During times of war, it will be clear that Intelligence is the oxygen of thriving nations.
Long AI infrastructure.
Harry Hodl retweeted
I want to thank my cohost @accounting_ds and all of our guest speakers this evening as we discussed colocation, $wulf and spoke with Patrick Fleury, CFO of @TeraWulfInc.
I have both part I and part II listed 👇
Please like and share for the sake of distribution. Too valuable of insights from Patrick to be missed.
Harry Hodl retweeted
NUAI: An Asymmetric Pre-Deal Position in AI Infrastructure
Summary
Investors comfortable holding $IREN, $WULF, $CIFR, or $APLD before they announced their first hyperscaler deals should be comfortable holding $NUAI today. The structural setup is materially identical with less execution risk. NUAI is operating the validated playbook those names established in 2025, with Stream Data Centers (Apollo-backed at $40B) and Macquarie already on the cap table, four hyperscalers as the only credible counterparties, and a six-month Macquarie clock functioning as a forcing function for lease execution.
Position Overview
Eighteen months ago, AI infrastructure names like IREN, WULF, APLD, and CIFR traded as speculative microcaps. Each re-rated sharply once a hyperscaler signed. Multiples expanded, floats compressed relative to opportunity, and the market repriced the companies from "miner" to "AI infrastructure platform."
NUAI follows the same template. New Era Energy & Digital has 650 MW secured in Ector County, Texas — the flagship "TCDC" campus — and management has confirmed advanced commercial discussions with one of four hyperscalers: Alphabet, Amazon, Meta, or Microsoft. The joint venture was organized by the hyperscaler, who selected Stream Data Centers as development manager and an institutional capital partner (Northland believes Apollo) to provide equity and arrange approximately 80% project-level debt. Stream contributes hyperscaler relationships and operational execution. NUAI contributes site control. The structure was effectively delivered to the company.
Why the IREN/WULF/APLD Comparison Holds
The standard objection to any "early-stage X" pitch is that every microcap claims to be the next something. Four points distinguish NUAI from generic versions of that pitch:
1. Secured land. 650 MW in Ector County is owned outright, not optioned or under LOI. The recent equity raise eliminated the SharonAI overhang and consolidated full ownership of the TCDC site. Power-ready acreage is the binding constraint of the entire AI buildout and the single hardest piece to fabricate.
2. Institutional capital. Macquarie wrote a $290M project-level facility. Apollo acquired Stream Data Centers for $40B in November 2025 and is the implicit equity partner on TCDC. Both are among the most rigorous diligence shops in private capital, and both are staked.
3. Professional execution stack. Stream as developer/operator; RK Mission Critical for modular fabrication and supply chain; Thunderhead Energy for behind-the-meter power; Ramboll / EYP Mission Critical Facilities for engineering. Charles Nelson joined as President/COO in February 2026. Ted Warner — with nearly two decades of capital markets experience and over $7B in HPC-related financing — joined as CFO in March 2026.
4. Binary counterparty universe. Four hyperscalers, all investment grade, all capex-constrained on power, all publicly committed to multi-year buildouts. Whichever one signs represents top-tier credit on a 15-20 year colocation lease.
Behind-the-Meter Has Become the Industry Default
A year ago, the consensus view across the data center industry held that behind-the-meter (BTM) power solutions were unworkable at hyperscaler scale. Critics argued that hyperscalers required utility-grade reliability, regulatory complexity would prove insurmountable, and BTM would remain a niche workaround rather than a primary power strategy. That view was a real overhang on every developer pursuing BTM as a path to capacity.
The consensus has reversed in twelve months. CIFR, APLD, WULF, and CORZ are all now executing BTM-led power strategies, and hyperscalers — facing multi-year interconnection queues and structural grid constraints — have endorsed BTM as a viable route to GW-scale capacity. Thunderhead Energy's role on the NUAI execution stack should be read in this context. NUAI is executing a strategy the industry has at this point publicly validated, with a power partner whose model is de-risked by parallel deployments at peer companies.
This is a meaningful update to the underwriting. The power-delivery question that was an open risk on every pre-deal AI infrastructure name twelve months ago is now the operating assumption across the cohort.
Stream Data Centers as the Execution Catalyst
In November 2025, Apollo paid $40B for Stream — for a particular set of capabilities that map directly onto why a hyperscaler would select TCDC.
Build-to-performance spec, not build-to-suit. Stream pre-aggregates standardized MEP equipment and configures it on the fly to customer specifications. The company quadrupled its development team during COVID and has been procuring long-lead equipment up to a year ahead of demand. Standardization speeds development time materially in a market characterized by acute power constraints and capacity scarcity.
Configurable cooling that future-proofs the asset. Stream's proprietary cooling design supports air cooling and direct-liquid-cooling on the same footprint, scaling from 10-12 kW per rack to 400+ kW per rack. Customers can defer the air-vs-DLC decision until late in the build without extending the timeline, providing meaningful optionality across NVIDIA's roadmap from Blackwell to Rubin and beyond.
Pre-existing hyperscaler relationship. This element has been broadly overlooked. Because Stream has worked with this hyperscaler before, we can safely assume that a significant amount of work product can be leveraged for TCDC. Management's fall 2026 lease execution target is credible because contracts are likely being adapted, not drafted from scratch.
The distinction is between a startup negotiating with a hyperscaler from a blank page and the hyperscaler's preferred developer adapting an existing form to a new site. Execution risk lives in a different category.
Expected Value Framework
In my opinion, the probability of a deal with the current hyperscaler by August 2026 is 90%+. The hyperscaler organized the JV. They selected Stream. They directed the structuring. Engineering and permitting are progressing without observable friction. Negotiations leverage Stream's existing templates and shared counsel. The Macquarie facility requires lease execution within six months, aligning every party's incentives toward closing.
As for the probability of any deal eventually, I would say 99%+. If the current hyperscaler exits — for which there is no observable reason in a market structurally short on power-ready supply — the structural work is already complete. Site control, partner ecosystem, financing template, and engineering package are not counterparty-specific. Another publicly traded data center company recently demonstrated this dynamic: a hyperscaler counterparty exited, a replacement was secured, and the timeline extended by approximately one month.
Stress-tested at a deeply conservative 50% probability of a deal — well below what the structural setup supports:
50% × 4-5x upside ≈ 2.0-2.5x expected return
50% × 50% drawdown ≈ 0.25x expected loss
Net expected value: approximately 1.75-2.25x
At 90% probability, expected value approaches 3.5-4x. The asymmetry is wide enough that halving the upside and doubling the downside still produces a positive expected value.
Re-Rating Mechanics: Why a Deal Drives 200%+ From Here, Not 10%
A market-microstructure point underlies the upside case.
When mature AI infrastructure names — IREN, WULF, CIFR, APLD at current scale — announce hyperscaler deals, the stock typically moves around 10%. Optionality is already embedded, and announcements function as confirmation rather than revelation.
Smaller, less-followed names behave differently. DGXX has announced materially smaller deals than what NUAI is contemplating and moved 50%+. Expectations are not embedded, the float is small, and the announcement forces a re-rating from speculative microcap to credible AI infrastructure platform (Note that a deal cannot be priced in because many institutions are waiting to buy until after a deal is announced).
NUAI sits closer to the $DGXX end on market cap and visibility but closer to the IREN/WULF/APLD end on asset quality and counterparty caliber. That mismatch is the opportunity. A first hyperscaler deal at TCDC could plausibly drive an immediate 200%+ re-rating — not because steady-state fundamentals support that exact multiple, but because microcaps gap rather than incrementally re-price. Investors do not get to scale into the new range.
Downside is bounded by the existing balance sheet, which is clean post-Macquarie and post-equity raise with no SharonAI overhang. Upside is a non-linear re-rating event.
The Case for Data Center Exposure
A reasonable question, given the breadth of the AI investable universe — semis, photonics, custom silicon, robotics, model labs — is why allocate to data center developers at all.
Data center economics are durable in a way most AI-adjacent verticals are not. Hyperscaler colocation leases run 15-20 years. Counterparties are investment grade. Cash flows are recurring. Once a campus is leased, it produces something close to a bond. EQIX has compounded through every macro cycle of the past fifteen years on this dynamic, and the structural reason is simple: an AWS region does not get turned off because the economy slows. Compute demand is structurally inelastic at the margin, and existing infrastructure is locked into multi-decade obligations.
The asset class is also tractable for non-specialists. Underwriting reduces to power, land, customers, and contract terms. Many other AI-adjacent verticals — photonics, custom silicon, neuromorphic, edge inference — are genuinely interesting and likely lucrative, but the underlying technology evolves quickly enough that most investors cannot reliably assess winners. Data centers fit Buffett's "in pile" — comprehensible, durable, and underwritable on standard metrics.
The constraint is that asymmetric opportunities within the data center space are increasingly scarce. For WULF to 5x from current levels would require multiple gigawatts of new capacity, additional contracts, and substantial revenue growth — achievable but grinding. NUAI requires one announcement with one of four hyperscalers for Phase 1 of TCDC. The bull case condenses to a single press release.
For investors who participated in the 2025 IREN/WULF/HUT/APLD/CIFR cycle, NUAI offers the same trade structure with two improvements: the underlying thesis has been validated by the prior cohort's outcomes, and the macro evidence — exponential capex guides, tightening power constraints, structural undersupply — is materially stronger today than it was eighteen months ago.
Conclusion
NUAI is structurally identical to the IREN, WULF, and APLD trades in early-to-mid 2025, with three improvements. The thesis has been validated by the 2025 cohort's outcomes. The execution stack — Stream / Apollo / Macquarie / Ramboll on day one — is more institutional than what several of those names had at first announcement. And the forcing functions are tighter, with a six-month Macquarie clock combined with a hyperscaler-organized JV on 650 MW of secured Texas power.
The position reduces to a single proposition: one press release reprices the equity by triple digits. Downside is bounded by an institutional cap table and a clean post-raise balance sheet. The expected value math holds at 50% probability and compounds at the 90%+ probability the structural setup supports.
Simply put, this is a remix of the IREN/WULF/APLD trade.
Harry Hodl retweeted
$IREN Sweetwater 1 HD - 3/12/2026
Made possible by OnlyFrans, edited and upscaled by @HArctander
Lots of developments on both tracts:
1. Confirmed 2nd primary substation on the left tract, making the total confirmed 3.
2. Data Center rows are visible on the right of PS1.
3. Visible bulk substation transformer on the most right pad, possibly a transformer on one of the pads at PS1.
4. Mass grading on the left tract, indicating further development of the site towards adjecent parcels on the north and west.
5. Utility substation expansion now connected to the main switch, suspected POI for IREN's energization in Q2.
6. Suspected further build-out of primary substations on the left tract, south of the first two, confirmed by drone footage posted by a subcontractor.
My considerations:
-> IREN is making a site that is a blank slate for mass production of data center shells.
-> The area right of PS1 is showing indications of rows, underground conduits, and this area will soon be ready for data center construction.
-> The fact that there is 1 bulk substation transformer visible on the most right transformer pad, makes me certain that energization is not far out.
-> I expect 750MW of gross power at the 36.5kV level (DC ready), to be flowing by the end of the year (incremental over the course of the year).
-> Based on the concentration of the substations on the left tract (possibly 3 or 4), we could see the entire 1,400MW become operational on these 2 tracts.
-> This further strengthens the believe that this will be a VR200/VR300 site, with a much smaller data center footprint due to a massive jump in rack density.
Now as to "wen deal":
I think @IREN_Ltd is making a site that can still pivot in either direction of Build-to-suit, colocation, or AI Cloud/IaaS.
By doing all the step-down work first, but preparing multiple data center areas down to the 34.5kV level — the ultimate use-case doesn't need to be set in stone yet.
I think this site will have a slow ramp up, but when the use-case is determined, all the moving parts will be in place, and the construction will be "released" as a coil spring into mass data center development, on multiple areas across the site in parallel.
Time to data center = Time to revenue
There are no delays when you do all the pre-work for 1,400MW of data centers, making the eventual construction a simplified copy-paste task at an unprecedented scale and pace.
Sweetwater is the flagship and will be the holy grail of AI infrastructure in 2027/2028.
Patience is a virtue, take the time to learn and know what you own.