In July 2024, DRDO's 'AD Launch Site' for future BMD tests was suspended due to fishermen's concerns regarding temporary restrictions during missile tests.
The new Chief Minister has stated that the project has now been approved and fast-tracked.
As mentioned by @GODOFPARADOXES, the Post Boost Vehicle may be separate from the 3rd stage.
The Agni-V Mk2 (Divyastra) is an advanced, MIRV capable iteration of the Agni-V.
Major improvements include replacement of maraging steel first stage casing with one manufactured using carbon composite filament winding, it is India's largest composite casing for now.
Possible correction:
On counting the QTRMs on available diagrams, the TRM count for the newer iteration of the LCA AF Mk2 radar comes out to 952. However, the document used as the basis of the original post mentioned 968. Make what you will of that.
DSCI retweeted
Felt obliged to post an update regarding this & the accompanied assertions: CVRDE has recently issued RFIs seeking partners for a new 1500 HP engine & transmission. The powerpack, named CV1500A, is confirmed to have a T-type config (longitudinal engine, transverse transmission).
The new tile architecture has been introduced by an AMPL official in this video by @Defencematrix1.
youtu.be/ofKFSKNW1pY?t=212
There are indications that both Su30 and AMCA's radars will have the same power output. If this turns out to be the case, the AMCA radar TRMs will require a higher peak power output (due to lesser TRM count) than that of the Su30 radar (likely 10W).
We now have a TRM count of the AMCA radar: 1528 GaN TRMs. This radar will use LRDE's new tile based architecture. However, the new architecture may debut earlier with the Su30MKI's VIruspaksha radar instead, which is being progressed using both architectures simultaneously.
There is a new version of the LCA AF Mk2 radar antenna. While the profile of the antenna housing likely remains the same, the addition of 14 new QTRMs takes the TRM count to 968, up from 912. This increase may have required the use of GaN TRMs over GaAs.
teapaw.org/DefSysCI/status/185416…
DRDO-LRDE's airborne radars can be categorized based on the architectures being used. The plank architecture (Uttam) supports dipole antennas. The newer, more compact tile architecture (Virupaksha) can house high bandwidth Vivaldi antennas.
New details are discussed as follows:🧵
The second batch of 107 units will likely serve the upcoming order for 97 more Tejas Mk1a aircraft for which HAL has already begun procurement of LRUs in anticipation.
With these orders, the Uttam AESA for LCA Mk1a will become the first Indian airborne radar to be mass produced.
The Uttam radar for Tejas Mk1a is an X-band AESA radar with 912 TR modules.
The first batch of 33 units likely caters to the 2021 order of 83 aircraft (73 Mk1a + 10 trainers). This is because, as per @delhidefence, the first 40 units of the Mk1a will feature the Elta 2052 radar.
HAL will be procuring 140 antenna units of the Tejas Mk1a's Uttam AESA radar from Astra Microwave Pvt Lmt (AMPL) in two batches of 33 and 107 units.
The combined cost of AMPL's quotations for both batch orders is Rs. 2,760 cr ($320 million at present exchange rate).
Attaching screencap of quoted tweet.
Thanks to @BrianE6B for the info:teapaw.org/BrianE6B/status/192188…
The Chinese imagery provider Mizarvision appears to be validating IAF strikes in Pakistan ? - undated images but analytical language suggests damage
13
1,736
This is misinformation.
Users should note that Chinese firm MizarVision, which released post strike imagery of PAF's Pasrur and Chunian radar facilities used by the OP, assessed that the facilities were indeed damaged.
unavailable
There has been some uneducated guesswork going around Mk2 using GaN TRMs, that is false.
The peak transmitted power is ~8.9KW.
Transmit output power (min): 10W (peak) per TRM
Transmit output power (max): 16W (peak) per TRM
All TRMs can not operate at 16W with the 5.5KVA AAPSU.
A look at the technical specification of the AESA-AAAU for LCA AF Mk2: It features 912 TRM with 896 active elements, and 16 receive only elements. 10W GaAs TRMs, similar to the Uttam for Tejas Mk1A.
The new antenna is shorter in height but wider, to fit in the smaller nose frame.
Surveillance radar should be made available by March 2027 for fitment on the DBMRH prototype.
The RFI is open for both Indian and foreign vendors under Make in India.
Single fixed AESA antenna (600×250mm).
The desired specifications for the surveillance radar are mentioned below:






















