EPCOR stands with the Canadian Armed Forces following the tragedy at CFB Wainwright. We extend our sincere condolences to the families, loved ones and colleagues of those who lost their lives and to everyone injured and affected by this incident. In recognition, flags at our EPCOR facilities across Canada will be lowered to half-mast.
#yegtraffic: Starting today at 7 a.m., SB 109 St will be reduced to one lane from 100 Ave to 99 Ave until 9 p.m. for drainage work. The west sidewalk will be closed, with the east sidewalk available to pedestrians. The parking lane will remain closed until Monday at 3 p.m. for restoration work. Please follow signage and allow extra time when travelling through the area.
Attn #yeg motorists: Starting today, Oct 15, there will be traffic disruptions at 34 St south of 118 Ave for 4 months for drainage work. SB and NB lanes along 34 St, south of 118 Ave will be reduced to one lane. #yegtraffic
Our Call Centre will be closed Mon, Oct 12 for Thanksgiving Day. Manage your account online 24/7 at epcor.com/MyAccount. Our Trouble Line (780-412-4500) remains available 24/7 for utility emergencies.
#yegtraffic: Starting Saturday at 6 a.m., the westbound connection from Grierson Hill to McDougall Hill Rd will be closed for drainage work until Sunday at 6 p.m. A signed detour will be in place via the Low Level Bridge and Scona Rd. A second closure will take place Tuesday from 9 a.m. to 3 p.m. for restoration work. Please follow signage and take alternate routes if needed. Thanks for your patience as crews work safely.
#yegtraffic: Starting today at 7 p.m. for four days, lane closures will be in place EB and WB on 137 Ave at Manning Dr for drainage work. NB Manning Dr will have one left-turn lane available, left turns along 137 Ave between 56 St and Manning Dr will not be permitted, and 56 St north of 137 Ave will be closed. Some sidewalk closures will also be in place. Please allow extra travel time and watch for signage.
Good morning, #yeg motorists: Starting today, October 2nd, there will be southbound lane closures on 142 Street, north of 120 Avenue for pole replacement work. At times, southbound traffic flow will be detoured to use the inside northbound lane. This is planned to be completed by Monday, October 5th. #yegtraffic
Our Call Centre will be closed Wed, Sept 30 for National Day for Truth and Reconciliation. Manage your account online 24/7 at epcor.com/MyAccount. Our Trouble line (780-412-4500) remains available 24/7 for utility emergencies.
#yegtraffic: Starting today, a small section of 91 Street northbound will be reduced to a single lane near 30 Avenue for approximately four days while crews complete drainage work. Please consider using alternate routes to avoid any potential delays. Thanks for your patience.
#yegtraffic reminder: Starting today, the west entrance to the High Level Bridge from 97 Avenue will be closed to traffic for approximately two months as drainage work begins. Access to the bridge will be maintained via the east entrance, and once on the bridge, both lanes will again be available to traffic. No closures are planned for the west sidewalk or shared-use path. Please follow posted signage, allow extra travel time or consider alternate routes. Thank you for your patience.
#yegtraffic: Starting today at 6:30 a.m., lane closures will be in place at 109 St and 102 Ave until Sunday at 9 p.m. for drainage work. One lane will be maintained in each direction on 109 St. The north-side crosswalk will be closed, NB left turns to WB 102 Ave will not be permitted, and traffic on 108 St will be detoured. Please follow signage and allow extra time when travelling through the area. Thanks for your patience as crews work safely.
#yegtraffic: Starting Monday, Sept. 21, the west entrance to the High Level Bridge from 97 Ave. will be closed to all traffic for approximately two months for drainage work. Access to the bridge will be maintained via the east entrance, and once on the bridge, both lanes will again be available to traffic. No closures are planned for the west sidewalk or shared-use path. We know traffic disruptions are inconvenient, and we are working with the City to minimize impacts. Please follow posted signage, allow extra travel time or consider alternate routes. Thanks for your patience.
#yegtraffic: Water main repairs on 51 Avenue between 93 and 97 Street have been completed. Westbound lanes are now split to allow two-way access through the area during road restoration work. Lane restrictions will remain in place and traffic patterns may change until restoration is complete. Please drive carefully in the area or consider alternate routes to avoid delays. Updates will be provided.
#yegtraffic: 51 Avenue remains fully closed between 93 and 97 Street for the afternoon commute as crews continue water system repairs. Please use alternate routes to avoid the area. If you're travelling nearby, please drive safely and follow detour signage. Thanks for your cooperation. Updates will be provided.
#yegtraffic: 51 Avenue is fully closed between 93 and 97 Street while crews repair a water service line. Please follow detour signage and use alternate routes. We'll provide updates as they become available. Thanks for your patience.
#yegtraffic: The middle lane of 97 Street southbound from 127 Avenue to Yellowhead Trail is closed for maintenance hole repairs. Please watch for signage, allow extra time when travelling through the area, or consider another route to avoid delays. Thanks for your patience as crews work safely.
#yegtraffic: Starting at 7:30 a.m. today, the WB left-turn lane from Whyte Ave (82 Ave) to SB Calgary Trail will be closed for drainage work. The middle WB lane on Whyte Ave will accommodate through and left-turn traffic. The north-south pedestrian crossing on the east side of the intersection will also be closed. The lane is expected to reopen by 7 a.m. Monday. Please watch for signage and allow extra time when travelling through the area. Thanks for your patience as crews work safely.
Attn. #yeg motorists: Starting this morning, Bellamy Hill (101 St) will be reduced to one lane either direction, with limited right turns southbound onto MacDonald Dr as crews complete repairs. Please consider another route, if you can. #yegtraffic
Our Call Centre will be closed Mon, Sept 7 for Labour Day. Manage your account online 24/7 at epcor.com/MyAccount. Our Trouble line (780-412-4500) remains available 24/7 for utility emergencies.

