Pinned Tweet
How To Calculate The Total Load Over The RCC Slab?
youtu.be/D7cPXqvccWA?si=WLgC…
In order to provide water from a nearby spring, a triangular flume of an efficient cross-section was provided on a slope of 0.21 percent. Assuming the roughness coefficient of the channel to be n = 0.018. Obtain the depth to flow in meters of the water in the flume if it is..
A 0.30 x 0.30 m. concrete pile is driven into a clayey soil having an unconfined compressive strength of 110 kPa. The pile has a length of 10 m. Unit weight of clay is 18 kN/m3.
A uniform cable weighing 3 lb/ft is suspended between two points A and B, as shown. Determine (a) the maximum and minimum values of the tension in the cable, and (b) the length of the cable.













