Gavin Ridley retweeted
George Westinghouse would marvel at the incredible advances in nuclear technology that our namesake company has made over the last 75 years. About half of all the world’s nuclear power plants are based on Westinghouse nuclear technology.
Last week, “Bricks George” unveiled our advanced modular AP1000® PWR bricks set. You can see his bricks engineering buddy working below on a new AP1000 unit, just like the ones we are deploying across the world.
Now, we're giving away five Westinghouse bricks sets to people who reshare this post. We'll draw names on Monday from everyone who reposted!
You can build a mini-Westinghouse nuclear reactor at home!
Gavin Ridley retweeted
What do you look for to judge a nuclear power project's potential, current progress, likelihood of success, and overall health?
I'm thinking of writing up a page on this for the website.
I look for things like:
* Hands-on experience with the primary coolant at reactor conditions
* Hands-on experience with highly radioactive material
* Technology readiness of reactor
* Fuel cycle cost: what's the charge enrichment, fuel form, fuel composition, and average discharge burnup?
* Technology readiness of balance of plant
* Degree to which maintenance and inspection is incorporated into the design
* Degree to which the design details are public (more is better, since it implies more peer review and licensing maturity)
* Licensing: how sophisticated are the submittals you've sent into the regulator. Where are you in regulatory space?
* Outlet temperature: helps with thermal efficiency and potential direct process heat applications
* Decay heat removal duration: helps understand overall DBA safety capability
* Supply chain: who's making the fuel and at what cost, who's making the control system, who's making the primary pumps, turbine, etc.
* Fire protection maturity: do they have a drain system that manages potentially radioactive material washed away during a fire?
* Radwaste management: what's their specification for fission gas release during normal operation?
Things I don't care about at all:
* MOUs with potential customers: this goes back to my Universal MOU: if you make cheap power people will buy it. DUH. These more often indicate how lowball of an cost estimate the execs have provided, often without much real justification (i.e. they're cost targets, not real estimates).
Gavin Ridley retweeted
This month, right on the heels of today’s Series C announcement, @basepowerco will operate the largest aggregated distributed energy resource (ADER) fleet in ERCOT. Our fleet of residential, behind-the-meter Base Power Company batteries demonstrates two important things:
Gavin Ridley retweeted
A surprising & little-known results in classical statistics:
Mean (μ) and median (m) are within one std deviation:
|μ−m| ≤ σ
For unimodal densities, bound is even tighter
|μ−m| ≤ 0.7746 σ
This beautiful results first appeared in a 1932 paper by Hotelling & Solomons
1/3
Gavin Ridley retweeted
For the record, in the past 12 months, we changed our fuel supply chain strategy.
We still released our UZrH video because it was cool, but we have since committed to using UO2 fuel and ZrH moderator, instead of homogenous UZrH.
UO2 is off-the-shelf fuel used in PWRs around the country today, whereas UZrH is a more niche fuel whose supply chain, similar to HALEU and TRISO, is far less developed.
We switched because there is simply no other way to do the following:
➡️ Procure fuel fast enough to Achieve criticality for Aalo-X in 2027
➡️Procure enough fuel to meet the multiple GW of demand we are seeing from AI data centers
By using UO2, fuel will not be a blocker for Aalo.
We’ll be announcing more specifics soon.
Fundamentally, we are a speed and economics company, not married to any one technology. Our #1 priority is getting a plant built as fast as possible, one that is economical enough to power data centers, and can rapidly scale to meet demand.
Check out our blog post for more details here:
aalo.com/post/unlocking-hype…
Gavin Ridley retweeted
What is the ideal reactor size to power a 1 GW data center?
Too big, and you don’t have enough redundancy to offer high availability.
Too small, and you take too large of a hit on scale economies.
100 MW reactors could be the optimal longterm, according to this study (attached below).
Aalo is starting with 50 MW plants & 10 MW reactors, as this size can also be economical, while being more venture fundable.
Full study here: mdpi.com/1996-1073/17/20/507…
Gavin Ridley retweeted
Jim Cramer called for Black Monday
The Nasdaq finished +0.01% today
Incredible
Gavin Ridley retweeted
'The fact is that PDEs, in particular those that are nonlinear, are too subtle to fit into a too general scheme. On the contrary, each important PDE seems to be a world in itself.' -- Sergiu Klainerman
Gavin Ridley retweeted
No, Rust exists because people treat C++ as "C with Classes" and continue to abuse it.
If you stick to unique_ptr and shared_ptr and so on, you can write entirely memory-safe code trivially.
It's 2025, so it's time to learn C17 at least...
Gavin Ridley retweeted
The 5 levels of #Linux users:
Level 1 - Ubuntu
Level 2 - Manjaro
Level 3 - Debian
Level 4 - Arch
Level 5 - Ubuntu
I reached Level 5.
And you?




































