Jacques B. (@JacquesBahou) header
Jacques B. (@JacquesBahou) profile picture

Exploiting the disconnect between secular trends and asset pricing

Dubai
Joined September 2009
Photo by Jacques B. (@JacquesBahou)Photo by Jacques B. (@JacquesBahou)Photo by Jacques B. (@JacquesBahou)Photo by Jacques B. (@JacquesBahou)Photo by Jacques B. (@JacquesBahou)Photo by Jacques B. (@JacquesBahou)Photo by Jacques B. (@JacquesBahou)Photo by Jacques B. (@JacquesBahou)Photo by Jacques B. (@JacquesBahou)Photo by Jacques B. (@JacquesBahou)
Jacques B. retweeted
$IREN the clipped highlighted part caught my attention: Asked Gemini Pro to breakdown the DSX infrastructure: Here is a breakdown of what the infrastructure entails and why it represents a shift in the industry: 1. Full-Stack Vertical IntegrationDSX is designed to unify the entire physical and digital environment of an AI data center. The architecture integrates: Accelerated Compute: The high-density GPU clusters required for training and inference. High-Speed Networking: The complex internal fabric needed so thousands of GPUs can communicate without bottlenecks. Physical Infrastructure: Standardized layouts for advanced power delivery systems and specialized liquid cooling solutions. Software: The operating layer that dynamically orchestrates AI workloads to maximize energy efficiency and intelligence-per-watt. 2. Solving the Power BottleneckThe primary constraint on modern AI expansion is no longer just manufacturing chips; it is the global shortage of utility-scale power, grid interconnection queues, and specialized data center facilities. The DSX architecture is engineered to be deployed in partnership with specialized infrastructure operators who already control large land portfolios and gigawatt-level power contracts. 3. Repeatable "Turnkey" DeploymentBy establishing a de facto standard for how an AI factory should be built from the ground up, DSX removes the guesswork for vendors, integrators, and colocation providers. It allows facilities to be planned and executed as a single, cohesive unit, dramatically accelerating the time it takes to bring gigawatt-scale AI compute online compared to custom-building each facility. In short, DSX represents a structural shift in the AI hardware market: moving away from procuring GPUs in isolation, and toward deploying fully standardized, turnkey AI factories at a massive scale.
This quoted post is unavailable.
4
3
50
9,560
There is no larger long-term strategic move than this — NVIDIA joins forces with $IREN to build the flagship AI factory deployment for the DSX architecture The market will continue to repeatedly reinterpret the deeper intent and long-term objectives behind the partnership between NVIDIA and IREN. On May 7, 2026, IREN’s CEO reposted NVIDIA’s official announcement on X regarding the partnership between the two companies: NVIDIA and IREN Limited today announced a strategic partnership to accelerate the deployment of next-generation AI infrastructure. NVIDIA announcement nvidianews.nvidia.com/news/n… At the same time, IREN also released another announcement on its own website: IREN signs a US$3.4 billion AI cloud services agreement with NVIDIA. IREN announcement iren.gcs-web.com/static-file… The two announcements, each emphasizing different aspects of the cooperation, carry extremely significant implications. First, after careful verification, this is the first time NVIDIA has sought external compute leasing. There are three major turning points in industry development embedded in this move. A reversal of roles: NVIDIA becomes a “major external compute customer” for the first time In the past, NVIDIA’s relationship with infrastructure companies was almost always centered around “selling hardware” or “borrowing hyperscaler data centers for DGX Cloud.” But in this US$3.4 billion agreement with IREN, NVIDIA is, for the first time in its history, leasing third-party compute capacity at large scale and on a long-term basis as a customer, for use by its own AI research teams. This kind of “reverse leasing” is unprecedented for NVIDIA in both scale and nature. The selective external exposure of its most core secrets: this point carries the deepest implications For a long time, NVIDIA has insisted on keeping its most critical R&D work — chip design, driver optimization, and large-model training — inside its self-built supercomputers such as Selene and Eos, creating a closed loop of “building the shovels and mining with them itself.” But this time, outsourcing a 60MW research workload to an external data center is highly significant. It signals that compute-chip R&D is beginning to transition toward external collaboration. The first opening of stack management: introducing Mirantis to manage NVIDIA’s internal R&D clusters Previously, NVIDIA’s internal cluster management was handled entirely by its own engineering teams. But under this agreement, NVIDIA is for the first time allowing third-party management, bringing in Mirantis to participate in cluster orchestration and operations. This also signals a transformation in NVIDIA’s latest compute architecture R&D approach — beginning to “strengthen external collaboration” for lower-level operational work such as server cooling, restarts, and Kubernetes configuration. As the ability of individual GPU chips to increase computing performance gradually approaches physical and engineering limits, the next phase of AI compute advancement is shifting from “single-chip performance competition” to “system-level scalability competition.” This is NVIDIA’s direction of transformation. The primary paths for the next stage of AI compute improvement include: GPU clustering, high-speed interconnects, rack-scale computing, and data-center-level coordination. This requires GPU manufacturers (NVIDIA), data center designers/builders/operators (IREN), and supercluster operating systems (Mirantis) to jointly collaborate on development. What they are developing is precisely the NVIDIA DSX architecture referenced in the NVIDIA-IREN partnership announcement. And IREN’s hyperscale SW site in Texas is becoming the flagship deployment location for NVIDIA’s DSX architecture. This is absolutely not a simple narrative of NVIDIA investing in a company and becoming a shareholder. For the world’s leading company that holds the core secrets of AI compute chip R&D, this is not a trivial matter. From NVIDIA’s perspective, there appear to be many potential partners, such as CoreWeave, Nebius, Oracle, Microsoft Azure, Amazon Web Services, and Crusoe, and NVIDIA has already invested in or partnered with these firms before. But why did it choose IREN for this most important transformation? Because IREN possesses too many things that are uniquely its own: Multiple GW-scale single sites with secured long-term power supply Grid interaction capabilities Vertical integration Ultra-long-term site planning and abundant land supply Green energy Acting as its own design-and-build general contractor Long-term accumulation of data center operational experience Advanced design and technical capabilities Compared with the companies above that NVIDIA has already partnered with, even if IREN temporarily lacked software capabilities, NVIDIA was still willing to wait until IREN acquired a software company before announcing this deep cooperation. Moreover, Mirantis has long been one of the three software companies that have collaborated with NVIDIA for many years. It is highly possible that NVIDIA itself played the role of connector behind IREN’s acquisition. NVIDIA is transforming toward system-level compute scaling and building an AI factory template. In the future, the products it sells may no longer simply be GPU chips, but complete racks, clusters, or even entire AI factories. That inevitably requires standardized data centers in order to guarantee performance, compatibility, scalability, and token efficiency. What NVIDIA needs are facilities with massive long-term secured power supply, land, GW-scale campuses, HPC DNA, rapid construction capability, neutrality, automated scheduling capability, workload routing, GPU virtualization, fault recovery, and cluster operating systems capable of distributed training management. At present, IREN is the only company that possesses all of these elements simultaneously. What they are trying to build is the industrial standard for the next phase of the AI industry. The greatest companies do not merely participate in industries — they define the standards. From this perspective, there is no larger strategic theme than this one. Selling compute capacity to hyperscalers, partnering with Anthropic, or developing new sovereign AI businesses are all important, but none compare with this. The deeper meaning of last week’s announcement will require time for the market to fully interpret and understand. I believe I have already analyzed this trend relatively clearly. This move by NVIDIA and IREN, once executed successfully, could once again widen the gap between the NVIDIA ecosystem and Google just as Google had begun catching up — and it carries major implications for the entire AI industry.
32
85
26
425
83,690
100 gigawatts under contract. 10 gigawatts of capacity left through 2030. Pricing up double digits. Competitor literally stopped taking orders. And they generated more free cash flow in 90 days than the prior 365. This market is the tightest it's been in decades and nobody's talking about it.
25
32
4
686
121,707
Jacques B. retweeted
ImmunityBio ANKTIVA is very ambitious. Cancer, HIV, long COVID... multiple possibilities. Strong leadership, already some approvals in the USA and Saudi Arabia. We could be at the beginning of a health revolution bigger than Ozempic's for weight loss $IBRX
4
11
1
126
6,998
Jacques B. retweeted
New interview with $bkkt board member @mikealfred (22:00 to 30:00) $bkkt is trading for less than the value of their assets plus they have quite a few announcements coming up in the near future 🔥youtu.be/kbE6e_CHisg?si=EQCK…
2
4
1
22
7,197
Well well well... our friend Reginald Smith is a it again. 🤔 While the other recent analyst has gotten it right and have rerated $IREN's CSP business correctly, the @jpmorgan analyst is not budging off his low ball price target and underweight stance on IREN. For the most part Reggie's modelling isn't too bad. However, he's made some extremely bad assumptions. Reggie is only valuing $IREN's CSP business at $2.7bil, and assumes that colocation is a downside risk for IREN rather than upside. Colocation would not be a downside risk, at the very least it would be neutral, as it would provide stable revenue for a known duration of time. If IREN were to have 1GW of colocation at his conservative $1.75mil/MW/year, that would be $1.75bil in ARR for the next 10 years based on his 10 year contract assumptions. If that is the case, would that not be valued at $17.5bil alone, with an extremely conservative 10x multiple considering other REITs such as DLR and EQIX trade at over 20x multiples? 🤔 The $17.5bil colocation for 1 GW alone would still be significantly higher than the current $IREN MC, so how would that be a downside risk from the current MC? We also know that IREN has very likely rejected some colocation deals already because it can't generate the type of revenues that self CSP and an IaaS deal, such as $NBIS signed, can deliver. Even with 1 GW signed away to colocation, $IREN still has 1.91 GW contracted and energized by EOY 2027. If leaving out SW2's 600 MW, then there is still 1.31 GW to work with by H1 2026. Lets assume the BTC mining stays as is, with only Horizon 1&2 and PG assigned for any CSP type related revenue. We still have Reggie's $2.3bil value for BTC mining. The part where Reggie gets it wrong the most is valuing $IREN current's CSP plans in PG, giving it the paltry $2.7bil valuation. This would only be in a world where there is extremely low demand for GPU compute and IREN can't sell the GPU hours. Reggie is bucking the industry trends and forecasts. Reggie's GPU per MW at 450 isn't too bad, it's closer to my own projections of 432/MW for liquid-cooled GB 300s, but way off the 532/MW for air-cooled B200/B300s. He's forgetting that of the 23k GPUs that IREN has planned for PG, that only 1.2k are the liquid-cooled GB 300s, around 5.2% of that fleet. So that GPU/MW should really be closer to 525 GPU/MW. If IREN's planned fleet for PG is only 1.2% for liquid-cooled GB 300s, then how can he assign a $400mil (50 MW x $8mil/MW) capex for the all 50 MW of the DCs? All of the air-cooled GPUs can slot right into the existing DCs with almost capex spend. Even if we assume a 10% liquid-cooled to house those GPUs, that is only a $40mil capex spend for DCs, how can he arbitrarily assign $400mil for that cost? I will even accept his fairly reasonable $8mil/MW liquid-cooled cost, but IREN can do that for less at PG. But to assign it to the entire site when we know that 98.8% of it's air-cooled is just wrong. Are we getting tired from too many rounds in the boxing ring Reggie? And getting lazy on the math? 🤷‍♂️ iren.gcs-web.com/static-file… I have stated from very early on that $IREN's 70-80kW rack density doing air-cooled will be what rakes in money for the life of the air-cooled GPU fleet. By his own estimation, the refresh cycle for GPUs is around 4 years. For the 4 years those B200/B300s will absolutely be printing if the current and project demand from $ORCL is real. $IREN has guided a very conservative $500mil ARR for the 23k GPU fleet at PG, which works about around $2.48/hour (23k x 365 x 24 x $2.48). That is could be a bit high for utilization rate, but very conservative in terms of $/GPU hour (especially for GB 300s), so let's call it wash. If $IREN is able to generate $500mil in ARR, how can this only be assigned a $2.7bil value? Probably because he's throwing in, at minimum, another $360mil into the capex spend at PG. C'mon Reggie, know the fleet and assets of IREN before you publish something so foolish? 🤷‍♂️ Reggie likes SOTP, so let's add it up for him, since long term boxing and mathing isn't a good 1 2 combo: BTC mining: $2.3bil according to him, we'll just take it. Colocation of 1 GW: $17.5bil, his # and conservative 10x CSP 50 MW at PG: $5bil, using IREN guided ARR, 10x If that is the case, wouldn't $IREN's rough fair value be around a $24.8bil MC? This is also not including other MWs that can be monetized by H1 2026, such as Horizon 1 and 2, and the other 400 MWs at SW1. This is also based on conservative guidance of $IREN's CSP ARR. Did Reggie and his overlords at JPM really wanted to dip buy IREN call so badly that they would publish an amateur hour piece that isn't even to the standards of an unpaid internet rando, with a 9 to 5 job such as myself? 🤷‍♂️
Replying to @TheKamaHsutra
🚨Much Improved $IREN napkin math for CSP!!🚨 The above post was already quite long and I didn't want to really dive deeper into the math in the same post. The math above still works, but it's very napkin in nature, and doesn't take into more real world scenarios and costs. I think the math of $IREN's CSP business warranted it's own separate post. To calculate the CSP business is more nuanced than BTC mining, but with $IREN having supplied most of the important numbers, and we can fill in the rest with some research, we can model out their CSP business much better. I would still call it napkin math because I can't account for everything in the calculations, but it's a much improved version from the original post. The first thing we need to do is find all of the cost and revenue and break it down to an empirical unit such as $/MW. Costs GPUs: From the IREN PRs, we can figure out the unit cost of each of the models they paid for via the PRs. iren.gcs-web.com/static-file… iren.gcs-web.com/static-file… iren.gcs-web.com/static-file… B200 = $193mil/4200 GPUs = $46k/GPU B300 = $72mil/1200 GPUs = $60k/GPU GB300 = $96mil/1200 GPUs = $80k/GPU The good thing about the pricing announced is that this pricing includes all of the ancillary equipment for the servers. So there should be very little extra equipment cost for the servers, if any at all. Cooling and redundancy will be calculated through the DC buildout cost. Data Centers: Air-cooled DCs - zero (negligible) cost, going into existing DC floor space that only require minor tweaking. Liquid-cooled Dc - $7mil/MW, $IREN has guided between $6-7mil/MW, we will use the higher of the 2 values. Interest Payments: This will be added to each scenario based on 9% (highest single digit) interest on 24 or 36 month payments based on leased amount. Since I have done 3 year schedule, I have used 36 month lease for $193mil and $96mil respectively. Please note I put interest on the full principle amount to be more conservative, and not assume a FMV model with any residual value that could be exempt from the interest. From Grok: Approx. $28mil interest on $193mil, and $13.9mil on $96mil. Electrical Cost: Assuming $0.05/kWh at BC sites Total energy consumption = 1000 kW × 8760 hours x $0.05 kWh = $438k PUE adjustments to electrical cost Adjusted for 1.2 PUE = $525.6k Adjusted for 1.1 PUE = $481.8k Data Center Operational Personnel cost: According to ChatGPT, a budget of $50k to $150k/MW should be budgeted for maintenance and support of a DC. We will median of $100k/MW, since $IREN tends to be efficient side of operations from their track record. Revenue The revenue calculations are far simpler for than the costs. The revenues are simply: Number of GPUs x Hours x GPU hour rate x Fleet utilization For example, at $3 per hour and 80% fleet: 1000 GPUs x 365 days x 24 hours x $3 GPU/hour x 0.8 = $21.024mil/year Profits = Revenues - Costs I have compiled as much as of the cost as think of and as accurately as I can find. If anyone finds anything else, please feel free to add. We now have all the pieces to do a napkin model of the CSP profitability. The only thing left to do is to break it down to $/MW to get a better sense of how CSP compares against colocation and BTC mining. I will model out the B200 using air-cooling and GB300 using liquid cooling, both on 3 year paybacks. I'm only doing these 2 since, the framework is being provided that anyone can do various scenarios based on this framework. In this $IREN presentation slide, we can see that all the B200s and B300s will air-cooled, while the GB300s will be liquid cooled. Modeling out the B200s is easier than the B300s because there is good pricing info available. From my research, the CSPs are charging around $3/hour on 3 year reservations. Lambda has the following pricing listed on their site, and I would say they are a very good comp for $IREN. For GB300s there is no pricing yet, even GB200 pricing is completely opaque at this time, so we can only use assumptions. In order to calculate revenue and costs per MW, we have to determine how many GPUs can be deployed per IT load MW. PUE cost should not be included here, since it's part of the DC build capex and added on top separately. I have used the assistance of ChatGPT 5 and Grok 4 for the estimations, to adjust for all of the equipment that will be used in addition to the GPUs, such as CPU, RAM, networking gear, storage, and anything else I have not accounted for. ChatGPT came out with slightly more conservative numbers so I'll go with those for the model. For the air-cooled HGX B200, it came out with a 15.4kW total draw. If a 50 MW deployment, 3325 racks x 15.04kW = 50 MW 3325 racks x 8 GPUs per rack = 26600 GPUs for 50 MW. 1 MW = 532 GPUs chatgpt.com/s/t_68ba5299b804… Using the existing air cooled for B200 and B300 deployments a no brainer, with literally zero capex, if you can actually do 80kW air cooled racks. If looking at the Lambda pricing, the 3 year reserved price for B200s is $3. $IREN's breakeven price on a 3 year schedule, assuming 100% utilization is $2.13, while 80% utilization is still only $2.66. These would be hard to beat numbers for competitors. $IREN knew all of this even before I started beating the drum on it. The air-cooled B200s can be extremely profitable, if they undercut and went with a $2.75 reserved price for 3 years, and got close to 100% utilization, that would be net profit of almost $2.9mil/MW, on top of paying back for the GPUs. The air-cooled Blackwells are the lynch pin to this flywheel, until the liquid-cooled GPUs catches up with all the liquid-cooled DCs paid for in 3 years. For the liquid-cooled NVL72 GB300, it came out with a 165kW total draw. For the 10 MW at PG, 60.6 racks x 165kW = 9.999 MW Rounding down to 60 racks x 72 GPUs per rack = 4320 GPUs for 10 MW. 1 MW = 432 GPUs chatgpt.com/s/t_68ba512d7310… There is no pricing available for the GB300s at this time, the GB200 pricing is also very hard to find and opaque. Based on the napkin model, $IREN would need a break even price of $4.27 at full utilization to breakeven. Based on why hear about GB200s being easily over $5, would not be worried that the GB300s cannot get something at least over $5 on 3 year reservations. Do bear in mind that the 3 year payback also includes the cost of the DCs, that means this infrastructure will far outlive the life of the GPUs (in theory). If these DCs can go for 5 to 6 years without any major retrofitting or become obsolete, IREN would be very profitable, even if they had to get new GPUs after 3 years. The IREN guided liquid-cooled DC cost of $7/MW is extremely aggressive, and a number that many simply cannot match. It's the power of vertical integration, they are doing it without layers. The build cost a sizable amount of profits if the difference for same quality and functional DC is 2mil to 3mil/MW. Should we be skeptical of $IREN's ability to keep this guided number for DC builds? If they can actually do this number, it's really going to disrupt other DC builders. youtube.com/watch?v=nn9GSuFF… The numbers have to be compelling for $IREN to go into colocation. As of now, CSP is the most compelling to Dan Roberts, and there has not been a colocation offer as of yet that is compelling enough. Hopefully, that will change in the future, so IREN can monetize more MW faster. If the demand is there for AI compute, there is no question that the fully vertically integrated CSP route provides the most outsized returns. There are only a few that can truly do it, and aside from the true hyperscalers, I think $IREN is one of the select few, if not the only other one. What is even crazier to suggest is that $IREN might be able to provide compute at a lower price per MW than the hyperscalers. Even if the hyperscalers had lower cost of capital, it cannot make up for the difference in DC building costs, a cost of difference of $3mil to $4mil/MW cannot be compensated for by a 400 to 500 basis point difference in borrowing cost. If IREN can truly build lower cost compute than a hyperscaler, what would stop a hyperscaler using IREN as an IaaS ? 🤔 My assumptions and napkin math can be completely off. However, these are still compelling numbers to look at. The best client for IREN may just be irencloud after all. 🤔
34
51
11
345
99,915
$CIFR Cipher Mining signs $3B, 10-year AI hosting deal with Fluidstack backed by Google • 168 MW critical IT load at Barber Lake, TX; potential to expand to 500 MW • $3B contracted revenue over 10 years; extensions could raise value to $7B • Google backstops $1.4B of obligations, secures ~5.4% equity stake • Expected NOI margins of 80–85%, project costs $9–11M per MW • Marks strategic shift from crypto mining toward AI infrastructure with 2.4 GW pipeline
14
41
17
296
52,641
Because the topics I will discuss in today’s $IREN's space are so complex, I am uploading my research beforehand. If it helps, copy and paste sections of my post into ChatGPT and ask it to elaborate. Executive Summary IREN’s strategy hinges on the fact that GPUs are fast-depreciating while megawatts of data center capacity are enduring and scarce, and both under FMV leasing and colocation, IREN does not own the GPUs but instead monetizes the MWs. Through FMV leases, IREN secures 0% down financing, acceptance-based rent, and capped residual buyouts, making its economics functionally equivalent to colocation cash flows: reliable, recurring, per-MW income. The difference is that under FMV IREN nets roughly $3m/MW per year, compared to about $1.85m/MW in recent colocation contracts, with $3m/MW serving as a floor return and the residual cap creating upside if GPUs retain value. Because IREN builds data centers at $650k–$3m/MW versus ~$10m/MW for peers, these returns translate into sub-1-year paybacks compared to 6–7 years for traditional colo landlords, while preserving the long-term appreciation of MWs rather than giving it away in fixed long-term leases. Dell, through Dell Financial Services, is the most likely financier for IREN. Dell is able to finance $3–5B of GPUs by 2026 by securitizing lease receivables, while benefitting from server sales, financing spread, and lock-in of a strategic CSP customer. In effect, IREN has created a CSP-colo hybrid, or Colocation 2.0, where it acts as a GPU tenant under FMV but a MW landlord in infrastructure, securing predictable cash flows with downside protection and optional upside, and positioning itself to scale at hyperscale pace while capturing the revaluation of its most valuable asset: data center megawatts. FMV Leasing vs. Traditional Loans for IREN With a traditional loan, IREN finances 100% of the GPU cost, owns the hardware from day one, and repays principal plus interest over the loan term. The company captures all of the residual upside if the GPUs hold value, but it also absorbs all of the downside risk if resale markets collapse. Cash outflows begin as soon as the loan is funded, often months before clusters are energized, which means interest expense accrues during commissioning. On the balance sheet, the loan shows up as debt and the GPUs as assets, which are depreciated annually. Investors value this structure by capitalizing the debt and looking at EBITDA before depreciation and amortization. By contrast, with a fair market value (FMV) lease, the lessor buys the GPUs and IREN pays rent on the “depreciating slice” of the hardware—say 70–80%—while the residual is left to the end of the term. IREN can return the GPUs, extend the lease, or buy them at fair market value, often with a residual cap set at 20–25% of the purchase price. The structure is typically acceptance-based, so rent doesn’t start until the racks are energized and generating revenue. FMV leases can also be structured as non-recourse SPVs (see, e.g., coindesk.com/business/2022/1…), protecting the parent from left-tail risks, and can include rights to refresh or substitute GPUs mid-term. Accounting treatment is lease-based rather than asset-based, so the payments reduce EBITDA directly rather than flowing through depreciation. 0% Down: Liquidity-Light Model and the GPU Flywheel The most powerful feature of FMV leasing for IREN is the ability to finance GPUs with 0% down. In practice, this means the lessor funds the entire hardware purchase upfront, while IREN commits only to scheduled rent payments that begin once GPUs are energized. Unlike a traditional loan, which would demand a 20–30% equity contribution on a $5 billion fleet—locking up $1–1.5 billion of scarce liquidity—FMV frees IREN from making heavy upfront capital outlays. This transforms the economics from a capital-hungry balance sheet model into a capital-light operating model. That difference is not incremental; it is transformative. With FMV, IREN can commission massive GPU fleets without raising dilutive equity or overleveraging with expensive corporate debt. Every dollar of equity preserved can be recycled into building power and data center capacity, which are the true bottlenecks. Meanwhile, the financing of the silicon itself is shouldered by the lessor. This structure maximizes IREN’s ability to lean into its vertical integration advantage: because it owns the sites, controls the power, and handles deployment, it can scale far faster than competitors who must raise equity or negotiate shared-risk colocation deals. This liquidity-light model feeds directly into the GPU flywheel. As soon as GPUs are online, contracted compute revenue covers lease obligations, proving coverage ratios. That proof unlocks cheaper ABS financing and larger tranches of lease capacity, which in turn allows IREN to order more GPUs without new equity. More GPUs mean more contracted workloads, which means stronger revenue visibility, which makes the next wave of financing even easier. Without the drag of down payments, this cycle accelerates with minimal friction, compounding IREN’s growth. In short, 0% down FMV financing is the fuel of the flywheel. It ensures that IREN can expand fleets at hyperscale pace without constantly pausing to raise billions in fresh equity. This capital efficiency is what allows IREN to seriously contend with CoreWeave, despite having a smaller balance sheet today. It is also what makes the model resilient—if AI growth slows, lease returns cap downside; if demand surges, IREN can lean into the flywheel and expand capacity faster than equity-reliant rivals. Economics and Residual Risk The economics favor FMV in other ways as well. On a $100k GPU financed over three years at 9%, a loan requires roughly $118k in total payments (principal plus interest), after which IREN owns the hardware outright. An FMV lease that amortizes 80% of cost requires about $95k in payments, with an optional capped buyout at 20% of cost ($20k). If IREN returns the GPUs, it has spent just $95k and bears no residual risk. If it buys them at cap, the total outlay is ~$115k, still below the $118k loan despite having carried less upfront risk. At scale, this matters: on a $5 billion FMV fleet, IREN would pay about $1.81 billion in annual rent against $2.41 billion in revenue (assuming $2.75/hr and full utilization), leaving $600 million in lease-adjusted EBITDA. Strategically, FMV is all about optionality. If AI demand slows, model efficiency improves, or new architectures make current GPUs obsolete, IREN can return hardware and walk away. If GPUs hold or increase in value, capped buyouts let IREN capture upside without having shouldered residual risk during the riskiest years. Acceptance-based rent shields liquidity during commissioning, non-recourse SPVs firewall parent risk, and residual caps give upside exposure on favorable terms. These elements combine to give IREN flexibility at every critical juncture: commissioning, utilization ramp, and lease expiry. Why Lenders Agree For lenders, the economics are still rational. They bake residual risk into the rent factor, often secure remarketing guarantees through OEM channels, and syndicate or securitize leases into ABS markets to recycle capital. For Dell in particular, the incentives go beyond lease spread: every financed GPU flows through as server sales, locks IREN into the refresh cycle, and strengthens Dell’s channel relationship with Nvidia. This explains why lease rates can clear at loan-like levels even though the lessee receives far greater flexibility. Risk Sharing and Bubble Protection The risk-sharing dimension is also critical. With a loan, IREN owns obsolescence risk outright. With FMV, much of that risk is shifted to the lessor, who has stronger secondary market capabilities and the ability to absorb residual shocks. In an industry where GPUs may depreciate 60–90% in three years if demand falters, this insurance is not theoretical. It protects IREN’s balance sheet from being saddled with billions of depreciated assets in a bubble unwind. Conclusion While loans can be cheaper in a high-conviction scenario where GPUs retain strong residual value, FMV aligns much better with IREN’s growth model. The ability to do 0% down financing, preserve optionality at lease-end, align rent with revenue, and shift obsolescence risk off balance sheet makes FMV a superior instrument for scaling rapidly in an uncertain market. For IREN, whose strategy is built on vertical integration and aggressive expansion, owning the options is more valuable than owning the hardware.
47
49
21
355
85,255
Jacques B. retweeted
$IREN is pleased to announce an expansion of its AI Cloud business. - Purchase of 1.2k air-cooled NVIDIA B300s & 1.2k liquid-cooled NVIDIA GB300s - Expands AI Cloud to approximately 10.9k NVIDIA GPUs - New liquid-cooling installation at Prince George underway - Additional $96m in GPU financing secured - NVIDIA Preferred Partner status Press Release: irisenergy.gcs-web.com/stati…
42
140
36
1,049
156,831
this episode of the @edge_pod is a must-listen for anyone who holds or is interested in holding SBET or any Ethereum treasury vehicle if you don't have time to listen to the whole thing, jump to 29:00 SBET is run by the most giga-brained, skilled team in the business and has an extremely long-term vision and is designed for long-term investors. their goal is to create a vehicle suitable for, but not limited to, institutional investment at the highest levels @joechalom (CEO of SBET) pioneered the ETH and BTC ETFs in his executive role at BlackRock and lays out the value of ETH as productive collateral i'm more bullish on ETH and SBET than ever after listening to this. i doubled my position at $10 when crypto-media was grave-dancing, and i added substantially at $20 if we were somehow to go to $10 again, i will TRIPLE my already expanded position
🎙️ New @edge_pod 🐂 The ETH Opportunity: Why SharpLink Is All-In 0:00 - Intro 7:22 - Joe's career at BlackRock 11:09 - Jason’s role and experience 13:15 - Importance of Ethereum and ETH 19:07 - Why Joe joined SharpLink 21:35 - The Trustware Report 29:02 - The ETH Opportunity 35:17 - SBET's edge over an ETH ETF 37:58 - Urgency to accumulate ETH 39:49 - Why ETH over BTC as treasury asset? 45:28 - DeFi institutional adoption 50:48 - Raising capital to buy more ETH 55:37 - Leveraging institutional relationships 56:57 - Strategic partnership with Consensys 59:38 - Why SharpLink is working with Linea 1:02:58 - Closing 🙏 Thanks to @sharplink Co-CEO @joechalom and @Consensys CSO @0x81B for joining us!
33
20
2
263
39,134
Replying to @Umbisam
From ChatGPT: Yes — this is a pretty big deal for $IREN, and here’s why: 📊 The Numbers •FMR (Fidelity): Added ~8.7M shares in Q2 2025 → that’s a 3277% increase from their prior position. They now hold ~6.5% of IREN’s total outstanding shares. •Hood River Capital: Built a new position of ~5.1M shares. •Jane Street: Boosted holdings by ~5M shares (up 152%). •Situational Awareness LP: Added ~3M shares (up 90%). 🚨 Why It Matters 1.Institutional conviction – You’re seeing multiple sophisticated institutions (FMR, Jane Street, Hood River, Situational Awareness) piling in during the same quarter. That’s strong validation of IREN’s AI/HPC + BTC hybrid thesis. 2.FMR specifically – Fidelity is one of the biggest long-term allocators in the world. Them scaling up from almost nothing to 8.7M shares signals conviction that IREN is not just a miner, but a serious AI/HPC infra play. 3.Jane Street + Hood River – These are smart, opportunistic players. Jane Street in particular is known for exploiting liquidity/arb opportunities. If they’re in, it means they see asymmetric upside or structural mispricing. 4.Situational Awareness LP – Interesting angle: this fund was founded by a former OpenAI employee, and is well-followed by the tech community. Their entry is more than capital — it’s a signal boost in tech circles that could drive further flows. 🧭 The Takeaway •This isn’t just “institutions nibbling.” This is serious, coordinated accumulation. •IREN is increasingly being positioned as a leveraged AI/HPC infrastructure bet, not just a Bitcoin miner. •Flows like this matter — if institutions keep building positions, it can create a self-reinforcing re-rating loop (higher stock → more ATM firepower → more ETH/BTC/AI infra growth → higher stock). 👉 In plain terms: Yes, it’s a big deal. Not just because of the shares added, but because of who is adding them and what it signals about IREN’s shift in perception.
2
5
1
41
4,501
My biggest take away from speaking to @ethereumJoseph on the @MilkRoadDaily podcast yesterday was: We aren't thinking BIG enough about $ETH We really are about to move the entire financial system onto Ethereum - and institutions see it but not just finance, the entire global digital economy, which goes way beyond the existing financial system because of a new paradigm of permissionless and programmable rails we can create so many net new versions of what financial assets are And it will grow the financial system and economy to be much bigger and more efficient than it is today $ETH sits at the centre of it all as it's the economic security for the entire new financial system Here's the even better part, we have people like @ethereumJoseph @fundstrat @SamirTabar @AK_EtherMachine and many others spreading this story across wall street and mainstream They aren't just buying millions of $ETH every day, they are also waking up the world to this revolution We are going into a crazy adoption phase of crypto right now $ETH looks good here
27
53
5
336
41,254
Jacques B. retweeted
🤠Some big ol' personal news: I’m taking my talents to @Consensys & @LineaBuild to help grow our ecosystem of partners and projects around the world! I’ve said it before and I’ll say it again: the most important financial experiment in human history is unfolding right now, and it’s being powered by Ethereum. This is about more than yield or degen speculation. It’s about unlocking access to capital, ownership, identity, and freedom on a global scale. It’s about building a world where a farmer in Nigeria has the same tools as a founder in New York. From my time at @SushiSwap to consulting with @PontemNetwork, @blockytees, and @montana_dao, and others — I’ve seen nearly every corner of this industry. And I’ve never been more bullish on what’s coming next. Ethereum is becoming the base layer for global coordination — and no one has done more to push that forward than @Consensys. From @MetaMask to @infura_io to @LineaBuild, they’ve built the rails we all rely on. Now it’s time to scale what’s possible on those rails. Over the past few weeks, I’ve gotten to know more of the team and our partners — and this crew is GOATed beyond belief. The talent, the vision, the energy…the word "bullish" doesn't even begin to cover it. If you’re building in DeFi, infra, or something the world hasn’t seen yet, let’s talk. Big things ahead 🫡🦊
99
26
3
312
31,483
$IREN Is currently at a run rate of ~$1b in annual revs with an hardware margin > 78% => BTC Mining vertical only partially priced in. AI (huge) optional value, obv, still = $0. Wen will WS wake up ?
17
23
1
244
28,568
Oracle just signed a $30B AI cloud deal. They don’t build their own data centers. They need 3.6GW by 2028. They need scale, speed, and power. $IREN and $CIFR are sitting on the keys. This isn’t speculation anymore — it’s alignment.
$IREN $CIFR $ORCL Oracle Is Hot 🔥 Ever since Oracle had their earnings call mid-June, the company has seen a lot of media coverage, and chatter on fintwit and other platforms. Ever since @IREN_Ltd closed the deal on the Sweetwater site, we have been contemplating who will be the hyperscaler to sign with IREN. Now Horizon is being built, we are doing the same for the Childress site. A few weeks ago, everyone had Oracle as the number 1 choice. A big reason for this was that Larry Ellison said they have a customer who will take "all the capacity they can get, no matter where it is". Just over a week ago, SemiAnalysis wrote a piece about Oracle, and last week Oracle announced a contract with an unnamed client, to deliver $30B of annual revenue starting in 2028. In this post, I want to dive a bit deeper into this story, and find out if Oracle could potentially be a future client of $IREN. Let's start with this post I found on LinkedIn which had some very interesting comments from industry expert @Tech_Journalism and Matt Caldwell from Hyper solutions. So the main questions are: - Who will build the data centers for Oracle? - Who can provide the power? During @Oracle's last earnings call, Larry Ellison said: "Oracle will be the #1 cloud database company. Oracle will be the #1 cloud applications company, and Oracle will be the #1 builder and operator of cloud infrastructure data centers. We will build and operate more cloud infrastructure data centers than all of our cloud infrastructure competitors combined." Now, as far as I know, Oracle doesn't build anything. They just throw money around and lease things. In this situation, SemiAnalysis agrees with me, for a change: "As of today, Oracle doesn’t have datacenter self-build capabilities, a disadvantage relative to other hyperscalers who can combine self-development and leasing, and often use the former for large compute clusters." So, if Oracle says they will build more infrastructure than all of our competitors combined. How much would they actually need others to build for them? Who are Oracle's competitors, and what is their FY25 Capex for AI hardware & Infrastructure? - AWS $85B - Azure $70B - Google $65B - Meta $65B So this year alone, Oracle's competitors combined, will spend $285B on AI. Now these Hyperscalers are builders, and Oracle isn't forecasting to spend this amount on building. If we look at what I call the "Altman Benchmark", we can roughly estimate what AI Capex can bring you: So $100 Billion investment, gives you 5GW of data centers, and 2 million GPUs. Based on $3M per NVL72 GB200 system, we can conclude that the 2 million chips in this "benchmark", toal to roughly $83.33B in GPUs. That leaves $16.67B worth of data centers and other ancillary equipment. Oracle has a FY25 Capex forecast of "just $21.2B". which could imply—if that's just for GPUs—they are planning to invest in roughly 1.27GW this year. For FY26, Oracle has guided for $25B in Capex, and SemiAnalysis has estimated it will be over $30B. No matter the number, it won’t come close to beating the competition - let alone combined. So maybe Larry was being hyperbolic, because literally, it can't be true, at least not for the coming 1-2 years. But what about beyond 2027? Just a week ago, Oracle announced a $30B deal with a "mystery customer" "Oracle ( $ORCL ) signed a cloud services deal with an unnamed client expected to generate over $30 billion in annual revenue starting in fiscal year 2028." Now, on X and LinkedIn, people are wondering if it's @OpenAI again. Since Stargate is not even a real JV yet, and the deal in Abilene consists of Oracle directly with OpenAI, could this new client be just OpenAi again? Does Oracle want to avoid the "customer concentration" worries, and keep the customer's name in the dark for now? I guess we will find out sooner or later. The real question is: who will build the datacenters that is going to bring $30B of annual revenue by FY2028? OpenAI is now paying $10B per year for "Stargate 1" in Abilene: "OpenAI committed to buying all the compute capacity from that campus, these five-year contracts sum up to close to $10B annual expense for OpenAI" According to SemiAnalysis, Stargate 1 is ~880MW of Critical IT load, out of 1200MW of gross Megawatts. That would mean, the $30B client would need roughly 3 times that much, which translates to 3.6GW of power, fully delivered and constructed by 2028. Now let's go back to the earnings call, and look at what CEO Safra Catz said about their Capex: “We don’t order, we don’t build unless we've got orders for our capacity to be built out.” So Oracle has the orders - and at least one that will need 3.6GW 2.5 years from now - but who has the power for this capacity? Catz: “We are still in a position where our supply is not meeting our demand. We actually currently are still waving off customers or scheduling them out into the future so that we have enough supply to meet demand.” Ellison: “The demand is astronomical… People are calling up and asking us, 'Please, can you find us more capacity? We'll take it wherever. If it’s in Malaysia, we’ll take it.” So to sum up: 1. Oracle has a $30B "order" for 2028 (Since July 1st). 2. Oracle only "builds" when they have "orders for their capacity". 3. $30B could indicate 3.6GW of power needed. From SemiAnalysis: This led to the emergence of a new market segment: the AI-first developers. New entrants, often from the cryptomining world, understood that power was becoming the #1 concern and leveraged their existing interconnection agreements to plan large datacenters, away from population centers but with ample power. 4. Oracle already works with AI-first developers (Crusoe), away from population (Abilene) with ample power (West-Texas). 5. OpenAi has no problem with the compute coming from West-Texas, they took all the compute in Abilene for at least 5 years. Here is Michael Pariser from Oracle's OCI team, who recently joined as the Senior Principal Renewable Energy & Utilities, and is based in Houston, Texas: 6. Oracle is looking for ways to unlock MW capacity as quickly as possible, for active and planned infrastructure projects globally. 7. Oracle is still looking for 100% renewable energy to cut their emissions in half by 2030. 8. Oracle is looking to connect with innovative energy developers to supply power for the massive cloud and AI infrastructure buildout underway at OCI. 9. Oracle is looking to hire people with deep US power expertise. So, let's see: - Who is this MegaCampus builder? (it's not a REIT, they don't have the power, it's not Crusoe/Lancium, they don't have enough power). - Who is this Innovative Energy Developer with 100% renewable energy? - Who is this AI-First Developer with 2.75GW power available in US markets by 2028? - Who can help Oracle unlock MWs to reach their required capacity by 2028 to satisfy their signed client? Does this not look like the perfect fit for $IREN's Sweetwater 1+2, supplemented by Childress and maybe @CipherInc's capacity? Is there any way that Oracle can meet their signed capacity, without $IREN and $CIFR? Did Oracle just become my #1 candidate on the list of potential $IREN clients? 👀
1
5
2
38
3,726
Jacques B. retweeted
🚨BREAKING: SHARPLINK GAMING HAS BECOME THE SECOND LARGEST ETHEREUM WHALE, RIGHT BEHIND THE ETHEREUM FOUNDATION (WHICH HOLDS 250,466 ETH). SHARPLINK ($SBET) NOW HOLDS 198,167 $ETH, MAKING IT THE SECOND BIGGEST ETHEREUM HOLDER OVERALL.
60
111
9
767
33,818
$IREN is successfully applying the $TSLA playbook to datacenters🧵
49
69
8
770
124,319