Arjun (@LOXMethane) header
Arjun (@LOXMethane) profile picture

@Arjunsssssssd 's alt Space ,Tech & Defence enthusiast

Joined July 2026
Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)Photo by Arjun (@LOXMethane)
2
41
3,468
Arjun retweeted
Replying to @SkyrootA
@SkyrootA has demonstrated India's private orbital launch capabilities , @AgnikulCosmos targets partial reusability by H1 2027, @Astrobase aims for maiden launch of Medium lift launch vehicle by 2028 & reusability by 2030, while @theguildworld targets full reusability by 2028–29.
Replying to @HQuarterma43504
Would you call it delusional if i say that I'm preety satisfied with how space programme turned out and tho I'm worried but not blackpilled about the future of our space programme
4
8
1
45
554
Arjun retweeted
Highly recommended Name : Monster
2
1
2
17
2,353
Arjun retweeted
And the things is that this isn't the case with Electronics only Automobiles, Engineering goods, Machineries, pharma, semiconductors , railways and etc etc All of these are going through capacity build-up & when they all starts to contribute , the numbers will be simply amazing
5
25
460
This is when much of our electronics capacity build-up and expansion is yet to come online or is still in its early stages of production Take PCBs, the biggest contributor to H1 FY2026-27 growth Production is expected to rise from $0.6 billion in FY2024 to $3.8 billion by FY2029
India's electronics exports jumped by 44% to ~$32 billion in the first half of 2026-27. But the heartening story is that non-smartphone electronics exports grew by 56.5% to $13.79 billion, faster than phone exports at 35.8%. manufacturing.economictimes.…
5
40
186
3,612
And the things is that this isn't the case with Electronics only Automobiles, Engineering goods, Machineries, pharma, semiconductors , railways and etc etc All of these are going through capacity build-up & when they all starts to contribute , the numbers will be simply amazing
5
25
460
Arjun retweeted
This is when much of our electronics capacity build-up and expansion is yet to come online or is still in its early stages of production Take PCBs, the biggest contributor to H1 FY2026-27 growth Production is expected to rise from $0.6 billion in FY2024 to $3.8 billion by FY2029
India's electronics exports jumped by 44% to ~$32 billion in the first half of 2026-27. But the heartening story is that non-smartphone electronics exports grew by 56.5% to $13.79 billion, faster than phone exports at 35.8%. manufacturing.economictimes.…
5
40
186
3,612
Arjun retweeted
Serial Experiments Lain
Highly recommended Name : Monster
2
4
1
26
1,449
How do you inspect and maintain a reactor no human can ever enter? @PranosFusion is building tokomaks, where maintenance must be fully remote. @armatrix_IN builds snake-like robotic arms for exactly those tight spaces. Building fusion's supply chain from India 🇮🇳🦾⚛️ Watch 👇
7
46
3
174
3,232
Humanoids by General Autonomy
3
41
598
8,876
Arjun retweeted
Absolutely 10/10. Probably one of the best piece of media I’ve ever watched. I’d been sitting on it for so long, assuming it was just some kind of slice-of-life or romance stuff but I couldn't have been more wrong
9
4
3
35
1,501
Arjun retweeted
Battery cell manufacturing in india : 🟢 Commissioned Capacity - 1) OLA electric : > 6 GWh Commissioned > NMC & LFP > targets 20 GWh by 2028 > Long term target - 100 GWh 2) Exide > 6 GWh Commissioned > NMC & LFP > Addition 6 GWh planned Total - 12 GWh Capacity Commissioned
8
41
1
298
10,933
Battery cell manufacturing in india : 🟢 Commissioned Capacity - 1) OLA electric : > 6 GWh Commissioned > NMC & LFP > targets 20 GWh by 2028 > Long term target - 100 GWh 2) Exide > 6 GWh Commissioned > NMC & LFP > Addition 6 GWh planned Total - 12 GWh Capacity Commissioned
8
41
1
298
10,933
🔴 Announced / MoU / Hold - 1) JSW : > Phase-1 : 10 GWh > Additional 40 GWh expansion in phases *The project was put on hold due to difficulties securing an LFP tech partner. However, JSW has partnered with COEP Pune to develop indigenous Li-ion & sodium-ion cell technology
1
5
17
751
I'll keep updating this thread, so feel free to point out any projects or important developments that I've missed. I may have made some mistakes too, so please correct me wherever necessary.
2
3
18
717
Arjun retweeted
It's happening !!! 🚨 🚨 Jio Platforms Ltd has begun talks with Skyroot Aerospace, the Indian Space Research Organisation and other domestic companies to launch satellites for its planned satellite internet service No more slandering Mota Bhai from now finance.biggo.com/news/d42b3…
ISRO distributes ToT to more vendors like L&T & HAL to scale up production of PSLV , LVM3 and SSLV Meanwhile, we fund startups like Skyroot and Agnikul for capacity expansion and development of medium-to-heavy-lift Rockets And somewhere in between, we hope to crack reusability.
11
28
2
165
5,861
It's happening !!! 🚨 🚨 Jio Platforms Ltd has begun talks with Skyroot Aerospace, the Indian Space Research Organisation and other domestic companies to launch satellites for its planned satellite internet service No more slandering Mota Bhai from now finance.biggo.com/news/d42b3…
ISRO distributes ToT to more vendors like L&T & HAL to scale up production of PSLV , LVM3 and SSLV Meanwhile, we fund startups like Skyroot and Agnikul for capacity expansion and development of medium-to-heavy-lift Rockets And somewhere in between, we hope to crack reusability.
11
28
2
165
5,861
For those calling our manufacturing as screwdriver technology: Designed in India, Made in India 5-axes precision CNC machines with the accuracy of 2 microns! For reference, the thickness of human hair is about 80 microns. (5-axes = x, y, z, rotate, turn) This is the way electronics and semiconductor manufacturing ecosystem is taking shape. India now manufacturing things that go into things that go into things…
528
5,267
287
24,641
927,726
Arjun retweeted
Pegasus hot-firing campaign have begun
And yes, the hot-firing campaign has begun for the Pegasus. Exciting next few weeks 💪 Here’s an oversimplified version of what the hot flow/firing campaign (a series of 140 tests distributed between pressure-fed and pump-fed) entails starting today; Thrust Chamber Assembly Qualification: One of the most critical bits when developing any high thrust class engine is to eliminate combustion instabilities, and that’s what we’re starting with - injector hot flows with ignition fluid. 1. Ignition Trials with start/shut sequences on Injector/Constant Area combustor test articles 2. Constant area combustor firing 3. Capacitively cooled Combustor firing. 4. Calibration test on the full TCA. 5. Ignition Trials and quick start/shut dynamics on full TCA 6. Short burst duration of TCA under pressure-fed mode. 7. Hot firing of TCA for half duty cycle 8. TCA destructive testing for material assessment and reusability studies Turbo Machinery Qualification: 1. Full RPM Turbine Qualification - Cold Flow (Gaseous Nitrogen) 2. Fuel turbopump Qualification - Water 3. Oxidizer turbopump Qualification - Water 4. Oxidizer turbopump Qualification - LOX As for the tests already done, brilliant cold flow and turbomachinery run results. Will share a few updates shortly. Mad results so far. 👀
2
4
47
926