Industry leading project and programme management, including best in class operational delivery. Get in touch via 📧 [email protected] ☎️ 0808 188 9009

London, UK
Joined January 2021
Photo by MAC Projects (@MACprojectsHQ)Photo by MAC Projects (@MACprojectsHQ)Photo by MAC Projects (@MACprojectsHQ)Photo by MAC Projects (@MACprojectsHQ)Photo by MAC Projects (@MACprojectsHQ)Photo by MAC Projects (@MACprojectsHQ)Photo by MAC Projects (@MACprojectsHQ)Photo by MAC Projects (@MACprojectsHQ)Photo by MAC Projects (@MACprojectsHQ)Photo by MAC Projects (@MACprojectsHQ)
Over Land and Sea. A Journey of Power to Sanday. A journey from the British Hub of Transformer manufacture in Yorkshire, to an island that feels untouched. Sanday is only 16 miles in length and sets the scene of a challenge to mobilise electrical equipment and lifting plant.
2
13
Working on behalf of Winder Power Transformer Services, assisting them to refurbish and replace critical assets at the Northern Powergrid Substation in Beverley.
1
1
28
MAC Projects successfully completed the lifting operations alongside the Winder Power Engineering Team. The collaborative efforts resulted in another efficient, safe and quality driven project. MAC Projects MAC Heavy Lift Liam McLoughlin
14
Nice to see some blue sky on our recent Substation Project. Credit to our teams delivering week in - week out. Roll on the Spring - Summer where we can showcase some of the interesting projects that we have lined up. ▪️ [email protected] ▪️ 0808 188 9009
1
4
38
Making Light Work of a Heavy Lift. Having successfully conducted lifting operations on all DNO sites, MAC Projects provide solutions and overcome challenges, ensuring that safety and quality remains paramount throughout the project.
1
1
1
78
On a recent Scottish Power Energy Network Project, when a conventional jack & skid wasn’t an option, nor a mobile crane position within the substation, we devised a plan and set in motion the process to enable a Heavy Lift Mobile Crane to be placed on an adjacent street.
1
1
13
With assistance from our equipment suppliers and others within the Project, all work was completed as planned and approved. Making Light Work of this Heavy Lift.  (Liebherr LTM1650)
1
7
Showcasing a Heavy Lift Project and a change of weather in Scotland! Our teams were on hand to deliver an engineered solution for our OEM client. A project that stared well in advance of the delivery and installation.
1
1
1
19
With rail and air considerations, the project was a success given pre start time and efforts from the many stakeholders.
6
MAC Projects: The UK's Leading Specialist in the Removal of Failed and Fire-Damaged Batteries from BESS Sites As Battery Energy Storage Systems (BESS) continue to play a critical role in supporting the UK's transition to renewable energy,
1
1
2
22
the industry faces increasing challenges surrounding battery failures, thermal events, and end-of-life asset management.
7
Supporting Winder Power and helping them to deliver best in class Transformer Services. We are proud to play a part in assisting the operational and site teams deliver value to their customers.
1
1
2
83
Starting off with the Halifax Substation Project. MAC Projects supported the Winder Team with early engagement engineering for crane and vehicle access,
1
7
temporary works and safe systems of work to ensure the component exchanges were as safe and the lifting and logistics processes were as lean as possible. We look forward to showcasing some of the recent projects since the start of the year.
3
Following on from our Temporary Works - Cranes, Plant and Trackway appointment on the Northern AMP scheme, we are delighted to announce that MAC Projects will lead the Temporary Works engineering and supply for UK Power Projects, South UK.
1
1
2
88
The award was won with fantastic feedback of our operational management and project delivery across various power project scheme’s. Photographed, a UKPN operation with support from BALDWINS CRANE HIRE LIMITED,
1
10
Vp plc TPA trackway Guy Butterworth and Sunbelt Rentals UK & Ireland who have collaborated with MAC Projects to achieve this status. We now look forward to doing what we do best, supporting projects at High Level, to a High Standard.
13
MAC Projects were contracted to assist with the logistics, handling and installation of 132kv SF6-Switchgear at the Beaconsfield Road Substation alongside Hitachi Energy | HVSS | Colt Data Centres.
1
1
2
115
Working along with the site PC, our team provided FEED, and operational delivery / installation of the Switchgear, alongside plant, ground protection and overhead crane operatives.
1
11
We look forward to continuing  to deliver our high standards and quality driven installation process for this and other prestigious data centre projects.