ZM C (@Mfaisol_01) profile picture
Joined February 2024
Photo by ZM C (@Mfaisol_01)Photo by ZM C (@Mfaisol_01)Photo by ZM C (@Mfaisol_01)Photo by ZM C (@Mfaisol_01)Photo by ZM C (@Mfaisol_01)Photo by ZM C (@Mfaisol_01)Photo by ZM C (@Mfaisol_01)Photo by ZM C (@Mfaisol_01)Photo by ZM C (@Mfaisol_01)Photo by ZM C (@Mfaisol_01)
ZM C retweeted
To Kuching City, enjoy while it last. Sebelum jd mcm KL City. Hihi
10
129
7
434
23,432
Aku doa satu hari nanti Bola Sepak Malaysia akan kembali sihat
2
156
2
321
15,696
Replying to @RightWngdAngel
This is not an airport, no need to announce your departure.
182
449
21
31,992
275,843
Sabah politics in 4 steps: 1) Blame West Malaysia 2) Demand more power and money 3) Leak it the moment it arrives 4) Blame West Malaysia for the leak Rinse. Repeat. Never meant for the local hands.
SKANDAL BARU MALAYSIA DI SABAH Malaysia dihimpit Skandal baru apabila Laporan Ketua Audit Negara mendedahkan yang Lebuhraya Pan Borneo Fasa 1 di Sabah hanya siap 11.7 peratus padahal Kerajaan sudah membayar 94.6 Peratus kos projek atau RM 10.547 Bilion Projek ini juga turut terlewat selama 5 Tahun. Sepatutnya ia disiapkan pada 2021. Jawatankuasa Kira Kira Wang Negara PAC akan menjalankan siasatan ke atas mereka terlibat dalam projek ini susulan perkara berkenaan Dilaporkan punca Projek ini lewat kerana 1) 19 pakej projek dimulakan sebelum Laporan Penilaian Alam Sekitar 2) 57 Arahan Perubahan Kerja diluluskan tanpa kebenaran Ketua Setiausaha Perbendaharaan dan Lembaga Perolehan Jabatan Kerja Raya melibatkan kos RM 513.99 Juta 3) RM 163.64 Juta dibayar tanpa kontrak kepada kontraktor atau perunding projek 4) Kehilangan 77,299 Fail Pemantauan Projek 5) Kerajaan tidak menuntut semula dana pendahuluan kerajaan untuk kerja utiliti berjumlah RM 41.37 Juta 6) Banyak kontraktor belanja berlebihan kerana pengurusan projek yang lemah dan melanggar banyak peraturan kewangan. Serta masalah pengurusan dalam pembinaan projek menyebabkan kelewatan melampau Disebabkan itu. Kos Projek ini meningkat sebanyak RM 484 Juta dan menyebabkan Lebuhraya ini hanya boleh siap pada 2030. Dari 2016-2026 hanya 4 bahagian projek daripada 35 bahagian Projek disiapkan. Baki 31 projek melibatkan 9 bahagian ialah projek sakit, 13 lewat dari jadual dan 9 mendahului jadual namun belum siap. 35 Bahagian Projek itu adalah sepanjang 706 km keseluruhan. Kos untuk Projek Fasa 1A juga meningkat melebihi had maksimum kerajaan sebanyak RM 987 Juta susulan masalah ini kepada RM 11.323 Bilion dan Kerajaan terpaksa menangguhkan Fasa 2 dan Fasa 3 projek ini PAC memaklumkan masalah ini bukan sahaja melibatkan kontraktor di tapak pembinaan, tetapi juga melibatkan masalah pentadbiran dan pengurusan di peringkat kerajaan. Disebabkan itu Kementerian Kerja Raya, Jabatan Kerja Raya dan JKR Sabah akan turut dipanggil PAC untuk siasatan Menyeluruh
17
640
5
1,822
35,107
TERKINI Kerajaan Persekutuan akan menyelesaikan bayaran Geran Khas Sabah sebanyak RM 900 Juta dalam tahun ini juga P/s Rakyat Sabah saksikan dan perhatikanlah pemimpinmu. Tgk duit ni sampai tak kat korang Semenanjung dah try his best to take care of you. Now is your job Sabah Leaders
40
419
17
1,676
62,386
TERKINI Kementerian Dalam Negeri Arab Saudi menjatuhkan hukuman pancung kepada dua orang yang melakukan perbuatan tidak bermoral di dalam Masjidil Haram Mekah Al Mukarramah
36
1,042
30
6,109
470,812
Indonesia national football team
1,021
6,070
510
43,128
3,404,856
Susah Liga Malaysia ni, pemain kelab sendiri sanggup share taktikal pasukan sendiri ke owner bos lain. What a shame ! Selamatkanlah Liga Malaysia 🤲
16
154
7
766
68,983
GOAL EDO SOUSA!!! Peter Makrillos assist! Selangor 1-0 Sabah #PialaFA202627 #SELSAB
4
10
1
109
4,755
ZM C retweeted
Ex Muslim grifter Absolutely dismantled
73
415
30
3,565
273,340
ZM C retweeted
Your fraud will be exposed very soon Johor DT
Not only did we start the 2026/27 season by winning the Charity Cup, we also got three points in the Malaysia Super League and SET THE NEW WORLD RECORD for the Longest League Unbeaten Streak (109 matches) 💙❤️ More photos at facebook.com/share/1aXYpuDjS… #WeAreAMovement #WhatCanYouDo #TheTMJeffect #SouthernTigers #JewelOfTheSouth
35
168
5
559
21,721
Gabriel Palmero sign dengan JDT, bermakna ada 5 pemain palsu yang didaftarkan as local dalam pasukan JDT. MFL hanya tutup mata atas semua penipuan ini. Tidak adil bagi kelab Liga Malaysia yang lain untuk bersaing. Corrupted.
72
1,203
45
2,769
219,429
BOIKOT : PRINSIP DAN HARGA DIRI Dengan segala masalah dan isu dalam bola sepak Malaysia sekarang, cuba duduk dan fikir sekejap: Sanggupkah kita dipergunakan dan sokongan kita didagangkan atas alasan klasik "untuk negara"?
65
722
40
1,169
106,035
ZM C retweeted
Please report dekat grab biar account dia kena banned.
47
324
13
1,656
225,209
ZM C retweeted
“I have a Diploma in Accounting. I chose to study accounting for 4 years while chasing professional football, so i could have something to fall back to in case Football stops giving me money” — N’Golo Kanté
387
8,871
384
112,422
2,640,255
A little boy sneaks into his older brother’s game and ends up getting his first red card. 😂
81
611
22
16,239
562,323
Allahu Akbar 🚀the verse the Iranians chose in-front of the Saudi delegation at Shaheed Sayed Ali’s funeral is a kill shot 🚀🚀 It was beyond cinematic and will be remembered as a story of great legend.
59
1,271
26
6,279
224,156
Sebab tu dia ada gelaran "Prof", bila dia berkata-kata kita kena dengar dan faham. Betul jugak apa yang dia cakapkan. Bahasa jiwa bangsa. 💯
7
357
17
935
48,026
South Korea president Lee Jae Myung is calling for an investigation into the country’s poor World Cup showing and ensuing resignation of coach Hong Myung-bo. Kalau kat Malaysia: "No komen" "Move on" "It's ok, it's alright, beri lagi peruntukan" straitstimes.com/sport/footb…
36
449
16
905
50,579