11/11
Headlines:
-Pit lane construction started this morning
-Chain link around track installed in many places but more remains to do. Inner perimeter fencing set up. Both need buttoned up.
- track most far along from turns 5, 6, 7 and to 1. Lots of blocks, fencing and tire bundles on site.
- some cabling done but lots to do
- 5 pedestrian bridges. Done or close.
- grandstands installed
- going to be hot!
#indycar
#freedom250
Late morning Monday walkabout of the Washington DC street circuit construction.
#freedom250 #indycar
1/?
Spooky AC-130. Wow. Didn't realize they let these things out in the daylight. See those guns sticking out the side? You don't want to be downrange of those.