Sunny94 (@Sunny94FM) header
Sunny94 (@Sunny94FM) profile picture

Located at 94.1 on the FM dial, Sunny 94 has The Music You Grew Up! Paired with comprehensive news, sports and weather focused on Central Alberta!

4720 Highway 2A, Lacombe, AB
Joined March 2009
Photo by Sunny94 (@Sunny94FM)Photo by Sunny94 (@Sunny94FM)Photo by Sunny94 (@Sunny94FM)Photo by Sunny94 (@Sunny94FM)Photo by Sunny94 (@Sunny94FM)Photo by Sunny94 (@Sunny94FM)Photo by Sunny94 (@Sunny94FM)Photo by Sunny94 (@Sunny94FM)Photo by Sunny94 (@Sunny94FM)Photo by Sunny94 (@Sunny94FM)
Sunny94 retweeted
NB QEII ramp to NB Hwy2A, north of Gasoline Alley - construction work, Nov.23&24, daylight hrs. Drive with caution in the area and follow posted directions. (7:03am) #ABRoads
1
1
1,407
Hwy12 btwn Hwy20 & Range Rd 14, west of Bentley - utility work, Nov. 18 until 11am. Expect lane closure w/ speed reduced to 50km/h. #ABRoads
1
1,772
Reports of an MVC, Hwy 11 Eastbound at Burnt Lake Trail. Traffic slow at that location. #ABRoads
1
147
Sunny94 retweeted
NB QEII approaching Hwy12, SW of Lacombe - guardrail repairs, Nov.4 until 4pm. Expect RHL closure w/ speed reduced to 80km/h. #ABRoads
2
1,749
SLFD is responding MVC on HWY 781 & TWP RD 380. Please avoid the area & yield to emergency vehicles. 🚒🚨 (@511Alberta #ABRoads)
1
1
103
Sunny94 retweeted
Hwy11A at jct QEII, Red Deer - spray patching work on the ramps, Sep.9 until 5:30pm. Expect lane closures in the area. (7:57am) #ABRoads
1
1
3,257
Sunny94 retweeted
Hwy12 btwn Hwy20 & Range Rd 44, west of Bentley - line painting, Sep.9 until 3pm. Expect slow-moving vehicles in the area w/ wet paint on the roadway. (8:12am) #ABRoads
1
2,294
Sunny94 retweeted
WB Hwy53 btwn Ponoka & Hwy20 - line painting, in progress, Sept.4 until 6:30pm. Expect one-lane alternating traffic, follow directions & drive w/ caution. (7:57am) #ABRoads
1
2,394
Sunny94 retweeted
Hwy11A at QEII, in Red Deer - road maintenance operations in progress, Sep.2 until 5pm. Expect lane closure w/ speed reduction near the area. (7:58am) #ABRoads
1
2,232
Sunny94 retweeted
Hwy53 btwn Hwy20 & Hwy22, west of Rimbey - line painting in progress, Sep.2 until 6pm. Expect slow-moving vehicles in the area w/ wet paint on the roadway. #ABRoads
1
2,483
Sunny94 retweeted
Hwy766 btwn Hwy12 & Hwy53, SW of Rimbey - line painting in progress, Sep.2 until 6pm. Expect slow-moving vehicles in the area w/ wet paint on the roadway. #ABRoads
1
2,185
Hwy11A on QEII, all directions, Red Deer - spray patch work in progress. Expect half lane closure on the on and off ramps with speed reduced to 50 km/h #ABRoads
2
2,599
Hwy11A at RR 283, west of Red Deer - message painting. Expect a speed reduction to 50km/h with wet paint on the roadway. (7:41am) #ABRoads
1
2,628
NB QEII approaching Hwy2A off ramp, Innisfail - bridge maintenance, Aug.18 from 8:30am to 4pm. Expect lane closure and a speed reduction in place. #ABRoads
1
3,261
QEII at C&E Trail overpass, NE of Lacombe - bridge repairs, Aug.17 to 21, daily from 8am to 6pm. Expect partial lane closure w/ speed reduced to 50km/h. #ABRoads
3
1
3,052
Hwy808 between jct Hwy595 and Hwy11, east of Red Deer - line painting work, Aug.17 until 1pm. Expect slow-moving vehicles in the area with wet paint on the roadway. (8:15am) #ABRoads
2
2,657
NB QEII approaching Hwy2A off ramp, Innisfail - bridge maintenance. Expect lane closure and a speed reduction in place. (8:56am) #ABRoads
2
2,932
Sunny94 retweeted
Hwy11 & Hwy20, south of Sylvan Lake - pot hole repair, in progress Aug.5. Expect one-lane alternating traffic with speed reduced to 50km/h, follow directions and drive with caution. (8:41am) #ABRoads
1
2,094
Sunny94 retweeted
Hwy595 at Range Rd 262, just east of Red Deer - construction work, Aug.4-Sep.7, daylight hours. Expect one lane alt traffic w/ speed reduced to 50km/h. #ABRoads
1
3,660
Sunny94 retweeted
Hwy20 btwn 47 Ave & 50 Ave, Sylvan Lake - pot hole repair. Expect one-lane alternating traffic, traffic delays, follow direction and drive with caution. (7:42am) #ABRoads
2
2,836