
#SydneyCrossrail - the biggest leap in rail capacity and connectivity in a century. Enables Metro-style service levels across ALL of Sydney's rail network.
Sydney, Australia
Joined January 2014
- Tweets8.3K
- Following2.2K
- Followers701
- Likes9.3K
Replying to @SydneyWorks
Unfortunately I don't yet know how to turn down the brightness of the underlying map. These 2 images show #Crossrail (green) from Glebe Island (adjacent to Sydney's new #HSR station), Airport Tunnel diversion to become #RiverMetro (purple) + EasternCityLoopLine (pink). More later
In response to the recent #M6 announcement - a waste-of-money vanity project to funnel $toll into #westconnex - I spent 45 minutes yest. arvo drawing up a north-south main road connector/distributor for freight and other dispersed vehicle trips in #Sydney. google.com/maps/d/u/0/edit?m…
Agreed. A missed opportunity. Hopefully the proposal can come back just as good or even better.
A proposal to rebuild the Edgecliff centre, with a 160m residential tower joined to Edgecliff Station, has been rejected by NSW Planning & Woollahra Council. It would have been an excellent transit-oriented development, 5min to Martin Pl. Disappointing.
planningportal.nsw.gov.au/re…
Thanks to “Acceleration @ForDummies”, I can calculamate my journey time schema. And then use a handy tool online to check it’s all working out. Good news; it is. #Syber
1
Aaand my updated #Syber network map, current 5 June 2021. I've extended Line XR1 from #Bradfield, part of the #Aerotropolis to #Wilton #CityCentre. I've also started re-vamping my ancient journey time sheets.
#Syber update Saturday, 5 June 2021. Have reached Nowra (bridge from Bomaderry over the river to Nowra town centre). The Illawarra sub-network of Syber terminates there. I've also extended the CC1 line to Macarthur, and have starting sketching out the new #Wilton #CityCentre.
2
#SYBER update, Friday 4 May 2021: Extended the Illawarra Sector as far as Shellharbour. New station at University of Wollongong. Expensive - long term kinda thing. #NIMBYrails
2
#SYBER Update Monday night, 24 May 2021. Illawarra Coal Coast Rail Bypass complete, as is drawing out the existing squiggly Illawarra Line between Waterfall and Thirroul - meaning I've got my first line extending out beyond the Sydney Basin. Paid far too much attention to detail.
2
2
#SyberSystem Progress Friday night, 21 May 2021:
#SyberSystem Progress update, Friday arvo, 21 May 2021:
Progress update, Saturday night 15 May 2021: Have reached Glenfield in the southwest which means Line CC2 is complete. CC2 means: 'CC' - City Circle (the core/trunk of the subnetwork); '2' - Line 2. CC2 runs from Hornsby to Glenfield via the City Circle. -->
1
Quick progress update as of midday Saturday 15 May 2021: Major modification to planned #SYBER System - swapped parts of Airport Tunnel sub-network and 'Crossrail' sub-network. Now looks like this:
Which do you prefer?
(In terms of Roselands Station location)
#SYBER #CanterburyBankstown #Roselands #Sydney #SydneyMetro #SydneyTrains
2
Progress update Sunday 2 May 2021. Have had to re-construct the entire network due to an earlier misunderstanding regarding station lengths. Turns out 1:1 scale means 1:1 scale. Whoops. No need to double their length. About 80% reconstruction done. -->
.@WeirdAndWry has created an immensely impressive world-wide sim sandbox environment for the truly nerdy. I've finished my first line at long last. I have a depot. But it looks like scheduling it all up will be a learning curve in itself :) Ah well, it's worthwhile I'd say.
Replying to @WeirdAndWry
@WeirdAndWry Just giving you a heads up about a strange bug: an update or two ago, meters were cut in half. This station below should be 162m, not 324m. Just wondering if a fix will come along or whether I need to start again or something like that. 🙂
1
It's getting hard to make out what's what, but the red loop shown in this pic is the City component of the 'Eastern Loop Line' ('EL') which is an automated Metro. The dark silver line is the metro-fied Airport Tunnel becoming the 'River Metro' via Pyrmont and Ryde to Parra.
1
1
Alignment of #RiverMetro to Gladesville (that's where I'm up to). Circled in black is the #AnzacCove #HSR #Sydney Terminus. River Metro continues to Pyrmont and the City. The #NewMainline #WestMetro replacement allows a 1 station transfer to Chats, StL, NS, at 'Roo (blue circle).
1
Dedicated #WestMetro adaptation thread. Still using #nimbyrails by @WeirdAndWry to help illustrate transport improvements in Sydney. When you're spending upwards of $25 BILLION on a railway, you might as well make best use of it and unlock capacity in every rail sector in Sydney.
The screenshot above shows an alternative alignment of #WestMetro (thinking of calling it #Crossrail or maybe #NewMainline). This version chooses interchanging with #SydneyMetro at Barangaroo over stopping at Pyrmont. DW, Pyrmont is served by the #EasternLoopLine, more 2come...
1
.@WeirdAndWry Any plans to introduce BRT? Could operate as trams, but with a different look.
Replying to @WeirdAndWry
@WeirdAndWry Having fun. Easy to get the hang of your builder. Can't wait for more train models and transport modes to be built.










































