RedGuard (@WeAreRedGuard) header
RedGuard (@WeAreRedGuard) profile picture

Proven blast-resistant buildings, shelters, offices & custom spaces. Protecting crews and saving lives. Like our content? See: https://teapaw.org/t.co/8MUP2t1z5K

Wichita, KS
Joined April 2016
Photo by RedGuard (@WeAreRedGuard)Photo by RedGuard (@WeAreRedGuard)Photo by RedGuard (@WeAreRedGuard)Photo by RedGuard (@WeAreRedGuard)Photo by RedGuard (@WeAreRedGuard)Photo by RedGuard (@WeAreRedGuard)Photo by RedGuard (@WeAreRedGuard)Photo by RedGuard (@WeAreRedGuard)Photo by RedGuard (@WeAreRedGuard)Photo by RedGuard (@WeAreRedGuard)
Repair or replace? An aging blast-resistant building with a sound structural shell may have years of service left. RedGuard helps customers evaluate refurbishment options. bit.ly/4zWmsOR  #AssetManagement
5
Different manufacturers. One service provider. RedGuard inspects, maintains, and repairs customer-owned blast-resistant buildings, regardless of who built them.  bit.ly/4it3Teb  #BlastResistantBuildings
6
Free second opinion on your facility siting study. Checked against current API standards, your present site, your current occupancy. Clear findings. No cost. Most Tested, Most Trusted: bit.ly/4y9hygb
6
The EHS manager signing off on a BRB spec deserves proof, not promises. RedGuard: third-party tested, engineering-validated, most extensive physical blast test program in the industry. Most Tested, Most Trusted: bit.ly/4yDlPte
10
Happy Veterans Day. To every veteran who has served, thank you. We’re grateful for your service and sacrifice today and every day. 🇺🇸 #VeteransDay #RedGuard
5
Temporary buildings support turnaround efficiency ,but siting and exposure matter. Learn where API RP 756 fits into smarter planning: bit.ly/41Zbppm
2
Working through an API 752/753 compliance review? RediSuite: 14 floor plans, 8 PSI/200ms, API compliant off the shelf, third-party tested. Built for that conversation. Most Tested, Most Trusted: bit.ly/47c5nUS
10
Delivery day execution is a planning result. RedGuard's project teams coordinate every detail in advance: routing, crane access, foundation, sequencing. Turnkey, start to finish. Most Tested, Most Trusted: bit.ly/4hB6hjJ
3
Blast-resistant buildings need maintenance, too. RedGuard services doors, HVAC systems, flooring, coatings, and more to help keep buildings in good operating condition. bit.ly/3WatcKw  #IndustrialMaintenance
7
Fixed footprint. Need more capacity. QuadPod: two stories, same blast rating, same ground space, double occupancy. Physically tested. Ready on your timeline. Most Tested, Most Trusted: bit.ly/4AUgFuC
6
Operations grow. VersaBilt from RedGuard grows with them. All-steel frame, custom layout, off-site build, minimal disruption on site. Built for where you're going. Most Tested, Most Trusted: bit.ly/4rSViWs
6
A new operator building was needed. The site wasn't available. RedGuard manufactured the building off-site while a major refinery conversion continued. Read how the modular approach worked for this project. bit.ly/4d6npLF
9
RedGuard manufactured a 2,480-square-foot operator building off-site while work continued on a major renewable diesel refinery conversion. See how modular construction helped solve a unique scheduling challenge. bit.ly/4i3QUkc
8
Third-party tested. 14 floor plans. 8 PSI/200ms. API compliant. Straight from selection to manufacturing. Most Tested, Most Trusted: bit.ly/4i8fikr
10
A BRB performs at the standard it's maintained to. RedGuard's field service team keeps yours there: factory-trained, security-cleared, on-truck with the right parts. Most Tested, Most Trusted: bit.ly/4ybQHQO
11
Custom build or fleet deployment? The right answer depends on your timeline and risk. LeaseFleet: largest fleet in the industry, same engineering standards as permanent builds. Most Tested, Most Trusted. Safety Starts Here: bit.ly/4y71z22
4
A renewable diesel project needed a new operator building, but its future location wasn't yet available. See how RedGuard used off-site modular construction to work around the project's construction sequence. bit.ly/46TUzKW
1
41
Has your BRB manufacturer physically detonated a building to prove it? RedGuard has. 6,000 lbs ANFO. 2020. Third-party verified. SafetySuite is built on that proof. Most Tested, Most Trusted. Safety Starts Here: bit.ly/4yNkYGo
1
18
Renewable diesel facilities need building solutions for initial construction, ongoing operations and future turnarounds. See how RedGuard supports these projects with custom modular buildings designed around actual site requirements.  bit.ly/4gPSNPx
1
14
14 floor plans. 8 PSI/200ms. API compliant. Select it, build it, deploy it. Faster than custom. Smarter than fleet. Most Tested, Most Trusted. #RediSuite #RedGuard Safety Starts Here: bit.ly/4r4rvcR
24