A permit does not make a data center buildable.
Last week, Nashville voted 27-5 to authorize eminent domain against a proposed 10 MW project that may already have vested rights.
Power, land, fiber and zoning are not enough. Political durability belongs in the underwriting.
2
2
103
Baxtel post: baxtel.com/news/nashville-au…
2
87
A rocket company becoming a data center infrastructure company encapsulates the era we are living in.
baxtel.com/news/spacex-s-fir…
34
Meta’s $600m by 2028 of data center spend by 2028 was made up in the spot.
Truly incredible
Mark Zuckerberg gets caught on mic admitting he completely made up a $ figure when asked how much $META is spending over the next few years
1
232
Eric Bell retweeted
Anthropic CEO Dario Amodei says we are in a paradigm "switch-over region" were small amounts of compute can enable DeepSeek to catch up to US companies with only 50,000 H100s, but the increasing demands of scale will require millions of chips by 2026
Infrastructure Industry: Don't worry about DeepSeek's more efficient models.
Jevons paradox tells us that as AI gets cheaper to run, total data center demand will likely increase - potentially outpacing any efficiency gains.
167
12 GWs!
@oklo will bring the bring on the SMRs to the yard.
switch.com/oklo-and-switch-f…
1
88
Eric Bell retweeted
Global knowledge work is a $20-30T annual economy. AI could boost efficiency by 5-20%+, unlocking $1-6T in value yearly. Achieving this might need $400B-$1T in AI investment—ROI is massive and transformative. Worth it? Absolutely. 🚀
If Iron-air batteries work well, it will be promising for the grid. We need longer term storage. techcrunch.com/2024/05/22/or…
2
168
Data Centers are coming for all available power, and more.
We need to add more generation/transmission capacity asap.
*This is not an April Fools hangover post*
3
111
I couldn’t agree more! Small, smart software can be so effective
Small software companies shouldn't be so concerned with the threat from overfunded startups or huge competitors because they're fundamentally building a different kind of software. Full podcast: lnk.to/david-heinemeier-hans…
1
151
I loved Cron. Now I can't connect my Google Workspace domain calendar to the new Notion Calendar.
I haven't changed any permissions. @NotionHQ, please help
4
318
Found a solution. I love Twitter
teapaw.org/NathanSudds/status/174…
Replying to @NotionHQ @kslifter1
Had this same issue, followed the instructions provided by @NotionHQ and that worked!
Here's a quick video walk through if it's helpful for others running into the 400 admin policy error for Notion Calendar
loom.com/share/c7c746a67a504…
1
2
88
Eric Bell retweeted
I'm trying to think through the energy requirements of an "intelligence explosion" scenario.
Globally, total primary energy consumption is ~170 PWh/year. This is about 2.5 kW/person.
If we had a trillion AGIs and they all only required 1 kWe/AGI to run continual inference on, that would be 1 PWe continous or 8760 PWhe/year (say 22,000 PWh primary/year on current tech).
Some questions:
1. What do we think the energy cost of inference for AGI (however you want to define it) would be? I think much more than 1kWe, but want to know what others think.
2. What is the minimum number of AGIs over what timeframe that counts as an explosion?
3. What are the support energy costs required? Like you obviously need to expend energy to keep the supply chain running to support continuous 1 PWe delivery. You need robot bodies, mining, chip manufacturing, etc.
4. Ultimately, I want to know how fast the energy supply needs to expand to support the minimal intelligence explosion scenario.
It seems unlikely to me that we could 100x our energy supply in a few months or even a few years, but before I draw that conclusion I'd like to hear what others have to say about these numbers.
Microsoft has in effect, acquired OpenAI without acquiring OpenAI.
What a crazy series of events over the weekend.
95
This could be an episode on Silicon Valley! An excerpt from the Walter Isaacson biography:
"The only rental car they could find when they landed was a Toyota Corolla. They were not sure how they would even get inside the data center at night, but one very surprised X staffer, a guy named Alex from Uzbekistan, was still there. He merrily let them in and showed them around.
The facility, which housed rooms of servers for many other companies as well, was very secure, with a retinal scan required for entry into each of the vaults. Alex the Uzbek was able to get them into the X vault, which contained about 5,200 refrigerator-size racks of 30 computers each.
“These things do not look that hard to move,” Elon announced. It was a reality-distorting assertion, since each rack weighed about 2,500 pounds and was eight feet tall.
“You’ll have to hire a contractor to lift the floor panels,” Alex said. “They need to be lifted with suction cups.” Another set of contractors, he said, would then have to go underneath the floor panels and disconnect the electric cables and seismic rods.
Musk turned to his security guard and asked to borrow his pocket knife. Using it, he was able to lift one of the air vents in the floor, which allowed him to pry open the floor panels. He then crawled under the server floor himself, used the knife to jimmy open an electrical cabinet, pulled the server plugs, and waited to see what happened. Nothing exploded. The server was ready to be moved....
....Other workers at the facility watched with a mix of amazement and horror. Musk and his renegade team were rolling servers out without putting them in crates or swaddling them in protective material, then using store-bought straps to secure them in the truck."
#datacenter
cnbc.com/2023/09/11/elon-mus…
147
Tesla's FSD v12 appears to be a game changer. I thought ChatGPT was good, but this is more amazing. And it's not being picked up in the press yet.
For years, Tesla has been building self-driving technology with heuristics. Meaning, Tesla wrote code for every situation. For example, what to do if there is a traffic cone, a stop sign, etc. There are a million driving scenarios to program for.
For FSD v12, Tesla removed most of the heuristic programming (300,000 lines of code) and replaced it with an AI training model by feeding it many real-world videos of real-world drivers. The model taught itself to drive by ingesting many hours of driving. The training model has only 3,000 lines of code.
This is a fundamental change.
* Less developers will be needed for many applications.
* And we'll get faster application development with AI.
* Also, Nvidia will sell more chips and those chips will need lots of data center space.
Below is a graph of Tesla's forecasted computed growth. We are only at the beginning.
Thank you to Chris and Zoë for the excellent conversation. Happy Pod Anniversary! It was good to celebrate with you
buzzsprout.com/2016832/13124…
66