Global Road Technology - GRT (@global_roads) header
Global Road Technology - GRT (@global_roads) profile picture

GRT is an International, engineering and technology company that specialists in dust control, soil stabilisation, erosion control and water management.

Southport, QLD 4215
Joined April 2012
Photo by Global Road Technology - GRT (@global_roads)Photo by Global Road Technology - GRT (@global_roads)Photo by Global Road Technology - GRT (@global_roads)Photo by Global Road Technology - GRT (@global_roads)Photo by Global Road Technology - GRT (@global_roads)Photo by Global Road Technology - GRT (@global_roads)Photo by Global Road Technology - GRT (@global_roads)Photo by Global Road Technology - GRT (@global_roads)Photo by Global Road Technology - GRT (@global_roads)Photo by Global Road Technology - GRT (@global_roads)
Health surveillance detects harm. Dust control helps prevent it. Our new guide explains Queensland's Coal Mine Workers' Health Scheme and what it means for employers. globalroadtechnology.com/coa… #DustControl #MineSafety #CoalMining #Queensland #GRT
3
Underground, diesel exhaust and roadway dust share the same air. Safe Work Australia’s national Workplace Exposure Limits list includes a diesel particulate matter (DPM) limit of 0.01 mg/m³, measured as respirable elemental carbon over an 8-hour time-weighted average. The national transition begins on 1 December 2026, but the limit and start date that apply at each site depend on the state and on mining-specific requirements, so check with your regulator. Meeting a DPM limit takes diesel controls: cleaner engines, maintained exhaust filters, fleet management and ventilation. Roadway dust needs its own control at the source. Suppression agents such as GRT: Activate UG are designed to help keep treated roadways settled for longer, reducing the dust load in the same air that carries diesel exhaust. Our new guide explains how the two fit together. Read the full guide: globalroadtechnology.com/dpm… #DustControl #MineSafety #UndergroundMining #DPM #GRT
9
Your site shuts for Christmas. Storm season does not. A Christmas shutdown can leave disturbed earthworks unattended for two to six weeks during storm season. Our new checklist helps civil and renewables teams prepare: plan the shutdown four to six weeks out, stop opening new ground about two weeks before the break, stabilise every exposed surface, empty and check sediment controls, and set up a monitoring roster with clear rainfall triggers. In Queensland, it is an offence under the Environmental Protection Act 1994 to deposit sediment in waters, gutters or stormwater drains, and councils require erosion and sediment controls to be maintained until the site is stabilised. For flat pads, stockpiles and moderate batters that will be reworked in January, sprayed polymer veneers such as GRT: Enviro-Binder are designed to help form a water-shedding crust over the surface. Read the full checklist: globalroadtechnology.com/chr… #ErosionControl #SedimentControl #CivilConstruction #Renewables #SolarFarm #GRT
10
A solar farm is not an urban subdivision. Its erosion plan should not read like one. Our new template sets out the ten sections an erosion and sediment control plan (ESCP) needs on a utility solar project, from site analysis and disturbance staging to monitoring and corrective action. It also covers the solar-specific risks that generic plans can miss: drip-line scour along panel edges, cable trenches that act as channels, and tunnel erosion in dispersive soils. In NSW, the Blue Book (Landcom’s Managing Urban Stormwater: Soils and Construction) is the technical reference, with a full Soil and Water Management Plan expected for projects disturbing more than 2,500 m². For graded array areas awaiting construction, sprayed polymer veneers such as GRT: Enviro-Binder are designed to help protect bare ground between stages. Read the full template: globalroadtechnology.com/sol… #ErosionControl #SedimentControl #SolarFarm #Renewables #EPC #GRT
60
Which unsealed roads should your council treat for dust first? A dust suppression program gives works teams a documented way to decide which unsealed roads get treated, with what, and from which budget. Our new template sets it out in five steps: adopt warrant criteria and a complaint procedure, score each road segment in a prioritisation matrix, match treatments to segments, build the budget on whole-of-life cost, and run a monitored trial on your own gravel before scaling up. According to ARRB’s Best Practice Guide for Unsealed Roads, about 575,000 km of Australia’s roughly 900,000 km road network is unsealed, and local government is responsible for more than three quarters of the network. On priority segments such as bus routes and roads near homes and schools, polymer options like GRT: Haul-Loc are designed to help keep dust down between maintenance cycles. Read the full template: globalroadtechnology.com/cou… #DustControl #DustSuppression #UnsealedRoads #LocalGovernment #RoadMaintenance #GRT
13
There is no single right haul road dust suppressant. There is the one that suits your road. The three main chemistries each fit a different kind of road. Bitumen emulsion cures into a bound, water-shedding seal that suits permanent, stable primary roads, but grading or re-profiling breaks the seal, and re-establishing it needs specialist plant. Lignosulphonate is a low-cost binder that performs well in dry conditions, but it is water-soluble, so heavy rain leaches it out and forces re-application. Polymer suppressants such as GRT: Haul-Loc are dosed through the existing water cart and are designed to help bind fines into the wearing course with each pass, so the road can still be graded and re-treated as part of routine maintenance. The deciding question is not which chemistry wins on paper, but how long the road will exist in its current form, and what maintenance will do to it. Permanent trunk roads can justify a bitumen seal. The semi-permanent network of ramps and dump access roads, which is graded and re-worked often, is where a polymer program tends to fit. For temporary roads, anything that needs heavy set-up makes little sense. Price per litre is the least useful number here. The real comparison is total cost across the road’s life: set-up, re-treatment, watering displaced, grading displaced, and how much it costs to change your mind. Learn more: globalroadtechnology.com/bit… #DustControl #DustSuppression #HaulRoads #HaulRoadMaintenance #MineSafety #Mining #GRT
19
On a haul road, water fixes a problem you can see and creates one you cannot. Overwatering haul roads for dust control cuts tyre traction and increases braking distance. The NSW Resources Regulator reported 20 incidents between January 2017 and February 2018 where overwatering, or water on roads, led to loss of control of a vehicle, which it noted was almost one-third of all loss-of-control incidents reported in that period. In Queensland, the mines inspectorate has gone further. Its safety bulletin on uncontrolled movement found that watering or excessive watering was the primary cause in 46% of such incidents, that 59% took place on ramps, and that watering a clay-surfaced road can reduce its frictional coefficient by 30%. The issue is rarely carelessness. Dust gives instant feedback while a loss of traction does not, and watering often runs on fixed schedules rather than road conditions. The answer is not less dust control, but making each litre of water do more. GRT: Haul-Loc is designed to be dosed through the existing water cart, so polymers help bind fines into the wearing course and each pass lasts longer. SMART Dosing Units keep the concentration right on every fill, and their dosing logs provide a record of how the road was treated. Learn more: globalroadtechnology.com/ove… #DustControl #HaulRoads #MineSafety #GRT
6
Mine Site Rehabilitation Guide for Australian Operations Mine rehabilitation is no longer something left for closure. In Queensland, a progressive rehabilitation and closure plan (PRC plan) under the Environmental Protection Act 1994 must include a schedule that states the proposed post-mining land use, each rehabilitation milestone required to achieve a stable condition for the land, and when each milestone is to be achieved. That puts rehabilitation on the same timeline as mining itself. Progressive rehabilitation means restoring areas as they become available, rather than letting a large disturbed footprint build up until the end of mine life. It also gives operations something closure-only programmes miss: early feedback. Poor germination on the first areas can change species selection for the next, and erosion on an early batter can change how the following landforms are shaped. The practical work starts well before seeding: keeping topsoil and subsoil separate, shaping landforms with drainage in mind, and protecting the surface while vegetation takes hold, as newly seeded ground can be especially vulnerable to rain. GRT: Enviro-Binder can be sprayed over seeded areas and is designed to help protect the seed bed from wash-off while plants establish, and GRT: Nature Plus, a liquid polymer containing phosphorus and nitrogen, is designed to support germination and strike rates. Rehabilitate as you go, and closure becomes the last step of a plan that has been running all along. Read the full article: globalroadtechnology.com/min… #MineRehabilitation #ProgressiveRehabilitation #MiningIndustry #ErosionControl #GlobalRoadTechnology
15
Dust Management Plans for Australian Mining Compliance A Dust Management Plan is only as useful as what happens on site after it is written. The plans that hold up tend to share the same structure. They start with a site-specific inventory of every dust source: drilling, blasting, excavation and loading, haul roads, crushing and screening, stockpiles and tailings. They apply controls to each source in the right order. The NSW Resources Regulator states that controls must follow the hierarchy of controls (elimination, substitution, engineering, administrative and lastly personal protective equipment) and describes PPE as a last line of defence against exposure. They set up monitoring that shows whether those controls are working, from personal exposure sampling to fixed and real-time monitors. And they are reviewed as the operation changes, rather than filed once and forgotten. Where plans tend to fall short is generic templates that do not reflect the real site, controls written into the plan but not fully resourced, and monitoring that misses the worst conditions. This is where engineering controls at the source come in. GRT: Haul-Loc is designed to help bind fines into the haul road wearing course between passes, GRT: Activate is a wetting agent designed to help sprays at crushers and transfer points wet fine dust that plain water struggles to, and SMART Dosing Units are designed to meter each application and keep a record of it, which helps when a plan needs to show its controls were actually applied. A plan that names its sources, follows the hierarchy and checks its own results is a plan you can stand behind. Read the full article: globalroadtechnology.com/dus… #DustManagement #DustControl #MiningSafety #MiningIndustry #GlobalRoadTechnology
14
Mining & Construction Erosion Control Compliance & Solutions Every mining operation and construction project that disturbs soil creates an erosion risk. Once vegetation is cleared, topsoil is stripped or batters are cut, the exposed surface can be displaced by raindrop impact, overland flow and wind, and that sediment ends up in drains, sediment basins and waterways. In Queensland, the Environmental Protection Act 1994 says a person must not unlawfully deposit prescribed water contaminants, including earth (sand, soil, silt or mud), in waters, a roadside gutter or stormwater drainage, and Transport and Main Roads specification MRTS52 (March 2025) sets out erosion and sediment control requirements for transport infrastructure projects. In NSW, the Guidelines for erosion and sediment control on building sites (October 2024) state that the most important part of erosion and sediment control is preventing erosion. Many erosion and sediment control programmes lean heavily on capture measures such as silt fences, check dams and sediment basins. They have their place, but they catch sediment after it has already moved, they need regular maintenance, and they can struggle under concentrated flow. Treating the source changes the order of work: stabilise the exposed surface first, so less sediment is mobilised to begin with. GRT: Enviro-Binder is a polymer soil binder sprayed onto exposed surfaces by water truck or hand spray, so large disturbed areas can be treated without installing blankets or matting by hand. It is designed to bind the surface layer and help protect it from raindrop impact and overland flow between rehabilitation campaigns. Treat the source first, and there is less to capture downstream. Read the full article: globalroadtechnology.com/min… #ErosionControl #SedimentControl #MiningIndustry #CivilConstruction #GlobalRoadTechnology
14
Coal Dust Exposure Limit in QLD and NSW: 1.5 mg/m3 Explained The respirable coal dust exposure limit in Queensland and New South Wales coal mines is 1.5 mg/m3, averaged over an 8-hour shift, set under each state’s mining safety legislation and administered by RSHQ in Queensland and the NSW Resources Regulator. What can catch operations out is that the headline number is not necessarily the number results are judged against. The 1.5 mg/m3 limit assumes an 8-hour shift with time to recover before the next one. On the 12-hour rosters many coal mines run, workers can be exposed to more dust per shift with less recovery time between shifts, so an appropriately qualified person, such as an occupational hygienist, should determine whether the limit needs adjusting. A site sitting just under 1.5 mg/m3 on paper can be over the shift-adjusted figure it is actually assessed against. The limit was lowered to 1.5 mg/m3 in Queensland in 2020 and in New South Wales in 2021. The NSW Resources Regulator notes a recent resurgence in identified cases of coal worker pneumoconiosis, also known as black lung disease. Ventilation and PPE remain essential, but on their own they may not be enough across a full roster. Controlling dust at each source is the most effective place to start: GRT: Activate UG added to the water feeding cutting and bolting sprays helps capture fine coal dust at the face, binding underground roadways helps reduce traffic re-suspending settled dust, GRT: Haul-Loc is designed to help keep wheel-generated fines bound into surface haul roads, and GRT: 12X is designed to help suppress the dust that drilling releases. Each aims to reduce dust in the air rather than only managing a worker’s exposure to it, which matters more on longer rosters, where the effective limit is lower. Read the full article: globalroadtechnology.com/coa… #CoalMining #DustControl #MiningSafety #RespirableDust #GlobalRoadTechnology
29
Dust Extinction Moisture: Turning “Is This Dusty?” Into A Number “Is this coal too dusty?” is often an argument on site. Dust Extinction Moisture, or DEM, turns it into a number. DEM is the moisture content at which coal effectively stops generating significant dust, measured under Australian Standard AS 4156.6 using a rotating drum test. Below that moisture level, dustiness rises; at or above it, dust drops to a low level. It gives an operation a measured target for how much moisture a specific coal needs to travel, transfer and stockpile with minimal dust and, just as useful, the point beyond which extra water adds little. That second part matters more than it sounds, because above the DEM, extra moisture mostly adds cost: you freight water in every wagon, you lower the as-received calorific value a buyer pays for, and over-wet fines can bridge in bins and blind screens. So the target is not maximum wetness; it is a band at or just above DEM. The hard part is holding a moving product inside a narrow window while weather, blending and transit drying all push it around. Which is why the useful question is not how to add more water, but how to make the water you add count for more. The finest particles are hard to wet and tend to slip past plain water droplets, so some of the water drains or evaporates before it reaches the dust. GRT: Activate is a wetting agent designed to lower water’s surface tension, helping each litre wet more of the fines. It is designed to help treated coal reach dust extinction at lower added moisture than water alone: a similar dust result from less water, or a better result from the same water. Lower product moisture and lower water demand, guided by one number you can actually put in a contract. Read the full article: globalroadtechnology.com/dus… #DustControl #CoalHandling #DustSuppression #MiningEfficiency #GlobalRoadTechnology
15
Haul Road Dust Suppression: The Complete Guide If you control dust in only one place on a surface mine, it should be the haul roads. They are one of the largest sources of dust on a surface mine, and the reason is physical: a loaded haul truck grinds its wearing course into finer and finer material with every pass, then its wheels and turbulence throw that material back into the air. Unlike a blast or a stockpile, a haul road keeps regenerating its own dust supply. That is why controlling the haul roads makes the biggest difference to a site’s dust profile, and why they are one of the highest-leverage places to act. Uncontrolled haul road dust is not just an environmental line item either. It is a safety risk, because dust clouds behind trucks reduce visibility on roads carrying heavy payloads, and the respirable fraction reaches operators, spotters and maintenance crews. It is a water problem, because plain water on an unsealed road is a short-lived fix, so carts run and rerun the same circuit and consume large volumes. And it is a maintenance problem, because fines lost to the air are road material lost, so dustier roads degrade faster and demand more grading. The fix is not simply more watering. It is an engineered wearing course, a binding suppressant applied through metered dosing of the water cart, and application coordinated with grading, so the treatment lives inside the road rather than sitting on top of it. GRT: Haul-Loc through SMART Dosing Units binds the fines into the wearing course and holds them there between passes, so the road stays bound instead of needing a fresh soak every time a cart comes round. Get the haul roads right, and it makes a real difference to the rest of the site’s dust control. Read the full article: globalroadtechnology.com/hau… #DustSuppression #HaulRoads #MiningSafety #DustControl #GlobalRoadTechnology
11
Dust Control for Quarries and Aggregate Operations Quarries sit in a tricky spot for dust. They process hard rock, granite, limestone, sandstone, basalt, that is high in crystalline silica, they generate dust at every stage from drilling and blasting to crushing, screening and hauling, and they usually sit much closer to homes, schools and roads than a remote mine. For years, quarry dust was treated as a lower priority than mining. That has changed: the crystalline silica rules now apply across the sector, quarries included, and the respirable crystalline silica exposure limit for quarries is 0.05 mg/m3, the same as the limit that applies to large mines. The regulations do not scale down for a smaller operation. The catch is that many smaller quarries run a couple of haul trucks, one shared water truck, and no dedicated environmental team, so the solutions have to fit that reality. They can. GRT: Haul-Loc dosed through SMART Dosing Units keeps haul road dust down with far less watering, which on a single-truck site frees that truck for other work. GRT7000 stabilisation firms up a wearing course often built from reject material, so it ruts and corrugates less and needs grading less often, freeing the grader for the pit and stockpiles. GRT: Activate goes into the existing spray bars on crushers and screens, designed to be up to 12x more effective than water alone on fine dust, and it moves with a mobile plant when it relocates. GRT: Enviro-Binder veneers stockpiles and exposed boundaries against the wind erosion that drives many community complaints. Quarries are not small mines, but the dust standards are the same, and the solutions can be built to a quarry’s scale. Read the full article: globalroadtechnology.com/dus… #DustControl #Quarrying #SilicaSafety #Aggregates #GlobalRoadTechnology
27
Dust Suppression Cost Per Kilometre: The Real Question “What does dust suppression cost per litre?” is the question that drives most procurement decisions, and it is the wrong one. Water costs little per litre and is still one of the most expensive methods there is, because of what it takes to deliver it. The product on the supplier’s quote is usually the smallest part of the real cost. The bigger costs sit out of view: the water truck itself, the diesel to run it, the operator who drives it, the grader called out to repair the damage the water does, and the gravel that has to be imported to replace what blew away as dust. On an arid site, plain water evaporates quickly, so the truck returns and re-sprays the same stretch again and again, and that truck time is often one of the largest lines in the whole equation. The better question is the total cost per kilometre, per year, to keep a road dust-free and trafficable, counting every one of those components. Answered that way, the picture changes. GRT: Haul-Loc through SMART Dosing Units keeps dust down with far less watering, so the water truck runs far fewer hours for the same result. GRT7000 stabilisation binds the wearing course so the road holds its shape, needs less grading, and loses less gravel. The litres of product are not where the money is. The water truck hours, the grading and the gravel are, and that is where the saving is too. Read the full article: globalroadtechnology.com/dus… #DustSuppression #HaulRoads #MiningCosts #UnsealedRoads #GlobalRoadTechnology
1
4
52
Reduce Rolling Resistance on Mining Haul Roads Haul roads are one of the largest costs on a surface mine, and the haul fleet is typically the biggest diesel consumer. Research from the University of Queensland identifies rolling resistance, the drag between the tyres and the road, as one of the main controllable factors in how much diesel those trucks burn. On a smooth, hard, well-maintained surface it is low, and almost all the engine’s power moves the truck forward. On a corrugated, loose, rutted or water-damaged surface, the tyres sink and flex, and energy that should move the truck is wasted as heat and deformation, paid for in diesel. What drives it up is familiar: corrugation, a loose wearing course that has lost its fines to dust, moisture damage from heavy watering or poor drainage, weak compaction, and the wrong wearing course material. Several of these trace back to water: the water applied for dust control is often the water that softens and destroys the road, which then needs grading, which smooths it briefly before the cycle repeats. This is where the GRT approach helps on two fronts. GRT7000 polymer stabilisation binds the wearing course into a dense, waterproof surface that resists tyre penetration, corrugation and moisture damage, so the road holds a low, steady rolling resistance for far longer between grading. GRT: Haul-Loc through SMART Dosing Units then maintains dust control with far less water, breaking the wet and dry cycle that drives resistance back up. A road treated this way stays near its best rolling resistance instead of swinging between freshly graded and badly degraded. The road surface is a production lever, not a maintenance item. Read the full article: globalroadtechnology.com/red… #HaulRoads #SoilStabilisation #MiningProductivity #FuelEfficiency #GlobalRoadTechnology
15
Dust Control During Drilling and Blasting Drilling and blasting start production at every hard rock mine and quarry, and they are among the most concentrated sources of respirable silica on the whole site. The drill bit fractures rock at high energy and compressed air flushes a plume of fine dust out of the hole, and the risk is not theoretical: a 1992 United States NIOSH alert documented silicosis cases, including deaths, among rock drillers. Drill and blast dust is one of the most neglected areas of site dust management, and the reason is that it is really a two-phase problem. During drilling, the standard control is wet drilling, but plain water struggles against the finest particles, which are hard to wet and tend to slip past plain water droplets, so the respirable fraction stays airborne even when the rig looks visually clean. After drilling, the pattern is covered in cuttings piles, one at every hole, with as many as several hundred holes in a single blast, and these piles of fine, dry, freshly fractured material sit exposed to wind and traffic for hours or days while the blast crew works among them loading holes. That second phase is the near-total gap on most sites. GRT addresses both. GRT: 12X is dosed into the drill rig’s water tank so the activated water actually captures the fine dust at the collar instead of letting it slip past, and it is designed to be up to 12x more effective than water alone on the fine fraction. GRT: DC Binder is then sprayed across the finished pattern, forming a surface crust that locks the cuttings down so they do not lift when the crew walks through or the wind picks up, and the blast simply breaks the crust along with the rock. If you control dust on the haul road, at the crusher and on the stockpile, the blast pattern, where the dust starts, should not be the one place you leave uncontrolled. Read the full article: globalroadtechnology.com/dus… #DustControl #SilicaSafety #DrillAndBlast #MiningSafety #GlobalRoadTechnology
44
Reduce Wet Weather Mine Road Closures Fast When it rains on a mine site, production stops. The haul road network turns impassable, loaded trucks cannot safely run on a saturated, rutted surface, light vehicles bog, the grader crew is called out, and the whole operation waits, sometimes hours, sometimes days, while the road dries and is rebuilt. Most sites accept this as a cost of doing business and budget for a fixed number of wet weather stand-down days every year. The question rarely asked, because the answer used to be no, is whether those days can be prevented. The reason an untreated road fails after rain is simple: it absorbs water. The wearing course is permeable, so rain soaks in, the surface softens and loses bearing capacity, trucks rut it, clay-rich material turns slippery, and if water reaches the base layers the whole pavement has to be rebuilt from the bottom up. If the surface were waterproof, shedding rainfall instead of absorbing it, none of that would happen. That is what GRT7000 polymer stabilisation does: it binds the wearing course into a dense, waterproof layer so rain runs off along the camber into the drains, exactly as it would from a sealed road. The pavement stays dry and firm through the rain, and because water never penetrated, there is no saturated base to dry out and no ruts to grade. An untreated road can take hours, or after a major event days, to inspect, grade, dry and recompact before traffic resumes. A stabilised road is ready far sooner, because the water never penetrated and there is nothing to dry out or regrade. And this matters more each year: CSIRO notes that as the climate changes, extreme weather events are growing in frequency and will bring productivity, safety and environmental challenges for mines, so the number of wet weather events a road has to withstand is set to rise. The wet weather stand-down is not an immovable line in the mine plan. It is an engineering problem with a solution. Read the full article: globalroadtechnology.com/red… #SoilStabilisation #HaulRoads #MiningProductivity #AllWeatherRoads #GlobalRoadTechnology
28
Conveyor Transfer Point and Crusher Dust Suppression A processing plant is a series of transfers, from the ROM pad to the primary crusher, crusher to conveyor, conveyor to conveyor, through screens and on to the stockpile, and every point where material drops or changes direction throws off a dust plume. The finest respirable fraction, the particles that cause silicosis and other lung disease, is generated at every one of them. The industry has invested heavily in mechanical control: engineered chutes, enclosures, skirt boards and extraction. These are essential and they contain the bulk of the material, but they share one limit, they cannot seal perfectly, and the particles that slip through the gaps are disproportionately the finest and most hazardous ones. That is the gap chemical activation fills. Most plants already run water sprays at the crusher feeds, discharge points and transfer chutes, but plain water struggles against the finest particles are hard to wet and tend to slip past plain water droplets and the turbulent air blows them clear of the spray before contact. GRT: Activate and GRT: 12X are dosed into the existing spray water to change how it behaves, lowering its surface tension so it wets fine dust that plain water struggles to and modifying its charge so droplets attract fine particles rather than relying on chance collision. GRT: 12X is designed to be up to 12x more effective than water alone on the fine fraction. It works through the spray infrastructure already installed, needs no new nozzles or pumps, does not increase water use, and is designed not to affect product quality. Your mechanical controls contain the material and your plain water wets the coarse fraction. The question is what is capturing the respirable fraction that causes disease. Read the full article: globalroadtechnology.com/con… #DustControl #DustSuppression #MineralProcessing #MiningSafety #GlobalRoadTechnology
17
Independent Study Finds Good Evidence GRT: Activate UG Reduces Dust Most dust suppression claims come from the supplier. This one does not. At a major underground coal operation in Queensland's Bowen Basin, the mine's own occupational hygiene team ran an independent effectiveness study of GRT: Activate UG over ten weeks, using their own methodology, their own sampling and their own statistical analysis. GRT provided the product; the mine's team did the science. The problem they were testing is a real one underground: at the continuous miner face, coal dust is hydrophobic, so the finest respirable dust that causes black lung and silicosis tends to bounce off plain water spray and stay airborne. GRT: Activate UG is a super-activated wetting agent added to the water already feeding the machine's sprays, designed to overcome that barrier so the water actually captures the fine dust. The study used a rigorous on and off protocol across six worker positions around the continuous miner, measuring dust per metre cut to control for production rate. Its conclusion, in the team's own words, was that there is good evidence the product is effective in reducing airborne dust when applied through the head sprays, with a large effect size and a meaningful reduction, and it recommended continued use. It also worked at an ultra-low dilution, and because it goes into the existing spray system, it needs no hardware change and no ventilation change. An independently tested control that makes the water already at the face work harder is the kind of evidence underground operations look for. Read the full article: globalroadtechnology.com/ind… #DustControl #UndergroundMining #CoalMining #MiningSafety #GlobalRoadTechnology
19