Happy Thanksgiving from the 520 #tucson
3
14
364
Jeremy Snavely retweeted
I took a picture of Sol earlier today with the Seestar. Maybe one sunspot on the right edge? 🤔
Jeremy Snavely retweeted
Broke out the Seestar for the first time in a long while. Old Sony camera with Tamron 200-500 vs the Seestar. I like both. Waning gibbous.
Pretty much all of Tucson is Bike Boulevard today. Good luck to El Tour riders. #5Dmkii
Jeremy Snavely retweeted
I’ve noticed that NLW from @AIDailyBrief makes bold calls every day without ever sounding cocky. So I (er, my AI) read two months of transcripts to see how he phrases things. Here are 7 moves for holding strong opinions without the absolutes.
Jeremy Snavely retweeted
Boeing 777-200LR
"The Spirit of Atlanta" sticker
Delta Air Lines
ATL 2020-Mar-15
🛫RWY 26L
Wonderful sound! Just heard TUS to PDX flight cross over the house. #avgeek flightradar24.com/ASA652/429…
2
9
376
Jeremy Snavely retweeted
The Endeavour flyover was 14 years ago now!
I saw a retired Shuttle Carrier Aircraft (SCA, a retrofitted 747) up in Palmdale yesterday at Joe Davies Heritage Airpark. The pic on the left is from 9/2012 when Endeavour was touring LA! The SCA in Palmdale did not fly that tour. A 2nd SCA did that trip. That 2nd SCA is on display in Houston. @SpeedSportLife have you seen the SCA in Houston?
I definitely need to get the SCA-Space Shuttle LEGO kit now!!
Jeremy Snavely retweeted
• The supercomputers will use dry cooling with a closed-loop water circulation system rather than evaporative cooling.
• SpaceX projects zero ongoing industrial water consumption.
• The cooling system will be filled initially, with water reused for up to 10 years.
• SpaceX estimates annual water usage equivalent to approximately 20–30 Arizona residential homes.
SpaceX has just unveiled a massive new $50 billion Supercomputing Campus that they want to build in Cochise County, Arizona.
All info:
• Up to 6 GW across the 9 supercomputing buildings
• Construction starts 2027
• Size of each supercomputing building: ~493,000 square feet.
• Total supercomputing building space: 4.44 million square feet, excluding support facilities.
• SSVEC residential customers are projected to see electricity bill reductions of 10–40%.
• Up to 24 GWh of grid-connected battery storage to provide backup power, stabilize the regional electric grid, support local voltage, and absorb fluctuations in electricity demand. Among the largest planned battery installations in the United States.
• Additional solar generation in the region is planned to supply renewable electricity during the day and reduce demand on the local grid.
• No dedicated on-site power plant or fuel storage yard is planned.
• Each supercomputing building will have 10 MW of natural-gas-powered standby generation for critical equipment, operating only during utility outages and periodic testing.
• No gas turbines will be installed at the site.
• SpaceX plans to fund $3.6 billion in grid infrastructure upgrades, transferred to AEPCO at no cost to its members.
• Up to $260 million annually in additional benefits for cooperative members at full buildout, on top of residential bill reductions.
• Up to $200 million annually for cooperative members statewide, in addition to SSVEC benefits.
• The supercomputers will use dry cooling with a closed-loop water circulation system rather than evaporative cooling.
• SpaceX projects zero ongoing industrial water consumption.
• The cooling system will be filled initially, with water reused for up to 10 years.
• SpaceX estimates annual water usage equivalent to approximately 20–30 Arizona residential homes.
• Projected annual water use would be less than 2.5% of a single center-pivot irrigation system's annual consumption.
• Permanent jobs: Approximately 1,000.
• Construction jobs: Approximately 5,500.
• Annual property tax revenue: Up to $103 million in estimated new annual revenue.
• Regional economic benefits: SpaceX says its investment will support public education, infrastructure, essential local services, and economic development.
• Local suppliers: SpaceX is encouraging suppliers to participate in construction and development of the campus.
• Noise mitigation: Equipment will be positioned away from neighboring properties where possible, with setbacks and additional screening to reduce noise.
• Nighttime lighting: Outdoor lighting will remain off unless work is underway, with active lights shielded and directed downward.
• Dark-sky protection: The campus will comply with Cochise County's dark-sky requirements to limit light pollution.
• Nighttime construction: SpaceX says it will seek waivers when nighttime construction lighting is necessary.
• Wildlife protection: The campus is being designed with consideration for the region's sandhill crane wintering habitat.
This campus's purpose is to build one of the world's most advanced AI supercomputing campuses to train SpaceX's superintelligence models and support scientific and engineering breakthroughs.
Learn more: spacex.com/sites/cochise-cou…



























