Photo by Andy Pringle / Laughing buddha - CCO YOM (@laughingbudd)Photo by Andy Pringle / Laughing buddha - CCO YOM (@laughingbudd)Photo by Andy Pringle / Laughing buddha - CCO YOM (@laughingbudd)Photo by Andy Pringle / Laughing buddha - CCO YOM (@laughingbudd)Photo by Andy Pringle / Laughing buddha - CCO YOM (@laughingbudd)Photo by Andy Pringle / Laughing buddha - CCO YOM (@laughingbudd)Photo by Andy Pringle / Laughing buddha - CCO YOM (@laughingbudd)Photo by Andy Pringle / Laughing buddha - CCO YOM (@laughingbudd)
Texas has paused grid connections. New York has a moratorium. Over 40 jurisdictions voted on restrictions this month. Everyone frames this as opposition to AI. It isn't. Nobody organised against machine learning. They organised against a very large building arriving next to them
1
2
57
The head of the Texas grid operator wants authority to make data centres cut power before an emergency is even declared. That's what happens when a load gets big enough to be a risk to the system rather than a customer of it.
1
37
Some developers have given up waiting for a grid connection and are building gas plants on site instead. Not as backup, as the primary supply. BloombergNEF puts the extra emissions at 152 million tonnes of CO2.
1
1
27
US data centre power demand has grown 19% a year since 2020. Grid capacity has grown about a tenth as fast. Everything else in this debate is downstream of those two numbers.
2
2
41
Microsoft's Outlook and Teams went down for more than twelve hours last week, across 74 countries. Courts stopped. Banks stopped. Not a cyberattack, just a failure. The lesson isn't about Microsoft. A lot of separate organisations turned out to be one organisation underneath.
1
154
A number I keep coming back to. In Texas, large-load connection requests now total roughly 200 gigawatts. The grid's record peak is about 85.5. You cannot build your way out of a gap that size. The answer has to be using capacity that already exists.
34
Our October: 27,127 sessions, up 271% on September. The lowest latency recorded was 5 ms, a Counter-Strike session in Montevideo on a node 9 km away.
2
1
57
The longest was 8 hours 17 minutes of Marvel Rivals, a player in Leeuwarden, 28 km away. Eight hours of continuous play with no data centre in the path. That's the argument.
62
Four days in Rome and almost nobody opened a conversation with gaming. They opened with cost and latency. Voice AI, robotics, customer service, education. Everyone looking for the same thing: a way off data centres.
1
2
74
Denmark changed its grid rules last month. New data centres now get the lowest priority for connections, behind households, healthcare, industry and renewables. Amsterdam extended its ban.
1
34
Dublin requires new connections to bring their own generation. Europe isn't short of demand for compute. It's short of places to put it.
8
Microsoft capped Xbox Cloud Gaming at 15 hours a month on Ultimate. Reporting suggests the economics turn negative past roughly that point.
1
58
The best-resourced company in gaming can't make centralised streaming pay beyond 15 hours per user. The GPU was never the expensive part. Moving every frame across a continent was.
10
Everyone agrees compute should sit under local control. Canada took an equity stake in Cohere. The UK is pushing AI sovereignty. AWS launched a European Sovereign Cloud. Most assume that means one big building. It doesn't.
1
43
Sovereignty is about where compute physically sits and who controls it. A distributed network of nodes inside a country satisfies that as well as a national campus, without a new grid connection or a decade of planning. Sovereign doesn't have to mean centralised.
29
One thing the announcement doesn't spell out. The same hardware that makes a game stream fast is what real-time AI needs. Voice agents, live avatars, anything a person is waiting on.
4
195
Everyone read last week's data centre results as a political story. That's the wrong read, and it undersells what happened. 41 measures across 10 states. Voters rejected them in all but one. Ohio is a red state and already had 138 local moratoriums before anyone voted.
1
3
127
This was structural, not partisan. Partisan problems reverse at the next election. Structural ones don't.
1
11
The expensive part of cloud gaming was never the GPU. It's hauling every frame from a distant campus to a player. Shorten that distance and the cost base changes. That's the whole design.
47
Reporting suggests Microsoft starts losing money past roughly 15 hours of cloud gaming per user. The best-resourced company in gaming can't make centralised streaming pay beyond 15 hours a month. That's not a Microsoft problem. It's a distance problem.
1
1
98