Pinned Tweet
Here is a list of my current projects, hope you will enjoy them:
tldlspaces.com
Read any X Space instead of listening to it: full transcripts, TLDRs, speaker summaries, quotes and fact-checked claims. Private Creator Hubs for subscriber-only Spaces.
gex.logchat.ai
Free dealer gamma exposure dashboard with gamma flip, call/put walls, max pain and highest-OI contracts for the tickers you trade, tracked over time.
logchat.ai
Analyze your app logs for errors and potential issues before they cause problems. Your AI technical support agent.
$iren just had FY27 Q1 results and earnings call, here is the transcript and a summary.
tldlspaces.com/s/iren-fy27-q…
Johnny B. retweeted
Let's break down this latest hit piece by @theinformation, talking about delays at $IREN.
Before I dive into this, it's important to understand that there are 2 "delays" floating on this platform.
First of all, there is the FY27 Q1 CapEx shortfall, for the quarter ending September 30. @Microsoft reported $45.2B in CapEx, compared to its previous guidance of more than $50B, while disclosing that some third-party capacity deliveries originally expected in Q1 had been delayed.
Secondly, there is the CapEx guidance for FY27 Q2, which ends on December 31. Microsoft noted that it expects CapEx to exceed $50B for the quarter, while separately disclosing that some third-party GPU-as-a-Service contracts originally expected in Q2 have been delayed into FY27 H2 (January–June 2027).
The piece by The Information, labeled:
"Exclusive: Microsoft Lowered Data Center Spending Following Delays By Cloud Firm Iren", is strictly speaking about the first topic, the shortfall of ~$5B of CapEx by Microsoft, noting that:
"Microsoft didn’t name the 'third party' behind those delays, but one of them is Iren".
It's important to understand what this means, and how IREN investors should perceive this.
In my opinion, this is not "news", because we are talking about the quarter that has already ended over a month ago.
If we dissect the words from $MSFT's earnings call on October 28, and we believe that IREN was one of the 3rd parties responsible for the delays, as The Information claims, then all this comes down to is a discrepancy between what Microsoft expected on July 29, and what was delivered by IREN after Horizon 1 was accepted on August 13.
Clearly Horizon 1 was delivered and accepted during FY27 Q1, so this lease amount is undoubtedly included in the realized CapEx during that quarter.
So we have to consider what Microsoft expected to record from IREN beyond Horizon 1 in that same quarter.
Logically, this can only be Horizon 2.
And if we go by IREN's own words, the company said on May 7 that H1 was targeted for CY26 Q3, and H2–H4 were targeted by year-end.
So the discussion here is: What is "year-end" for IREN, how should IREN investors have read this, and when did Microsoft expect this to be delivered?
Microsoft held its earnings call more than 2.5 months after IREN announced H2–H4 would be delivered by year-end.
Can we make that deduction here, and claim that Horizon 2 could never have been planned for Q3, because IREN specifically only mentioned H1 to be delivered in CY26 Q3? I think that's debatable, but you may still assume that September is part of the "year-end".
Clearly by August 27, IREN had moved Horizon 2–4 to CY26 Q4, so from IREN to investors, and from IREN to Microsoft, there should have been no surprises anymore that Horizon 2 was not going to be delivered in September.
So we are really only focused on the period between July 29 and August 27.
Could Microsoft have expected Horizon 2 by September when they held their earnings call on July 29, and if so, what happened during the month of August, when IREN specifically put Horizon 2–4 in CY26 Q4?
Well, I think it's incredibly difficult to assume that IREN had told Microsoft by July 29 that they expected Horizon 2 to be ready before the end of September.
First of all, the picture I added is from 7/30, the day after Microsoft said it expected more than $50B in CapEx during FY27 Q1. Clearly, the cooling plant was not ready yet, and lots of construction was still going on.
Secondly, on the day IREN announced that Horizon 1 had been handed over to Microsoft, August 13, IREN received a batch of GPUs for data hall 2.3, which is the last data hall of Horizon 2 (see second picture).
Subsequently, IREN continued to receive GPUs during the next week, with final deliveries in the week of August 20.
Realistically speaking, IREN's GPU procurement team would have been aware of the GPU schedule for that month, and that makes for a strong case that they would not have expected to get everything up and billing, and merged with Horizon 1, before the end of September.
When Microsoft held its earnings call on July 29, and the ENTIRE reason we are now having this discussion about delays from IREN, did they really believe IREN would deliver Horizon 2 before the end of September?
How plausible is that, given that neither the construction progress during July and August nor the GPU delivery schedule indicated that such an event was going to happen?
And clearly IREN made sure that the market knew this, when they clarified on August 27 that they expected to deliver Horizons 2–4 in the December quarter.
So while everyone is zooming in on the past quarter, and pointing out the delays of IREN from the past, how realistic is it that this was actually the case?
And even if it's true that Microsoft did expect Horizon 2 to be delivered by the end of September, then how large is IREN's part in the CapEx miss?
We don't know exactly how Microsoft accounts for IREN's lease and whether it considers the prepayment. But doing a sensitivity analysis, I have the following numbers:
Under the base-case assumptions, Horizon 2 could represent approximately $1.7–2.2 billion, or 34–44%, of a $5 billion shortfall.
That's significant, and in the worst case, that's almost half of the CapEx miss.
But it's important to remember that this hinges entirely on the notion that Microsoft believed IREN would deliver more than Horizon 1 during FY27 Q1.
So we need to consider The Information's source, and then compare that to my research, and you can draw your own conclusions as to who may be right here.
That being said, even if the Horizon 2 delivery was initially expected in FY27 Q1 by Microsoft, the market obviously knew that it didn't happen.
First of all, IREN specifically placed Horizon 2 in the December quarter during their earnings call on August 27. Secondly, there was no subsequent announcement of a Horizon 2 handover and acceptance during the remainder of the quarter ending September 30.
So then we have to take a look at the real implications of this alleged delay, for the contractual relationship between IREN and Microsoft.
In the August 27 10-K, IREN states:
"Horizon 2-4 is targeted for delivery in phases in calendar Q4 2026, with grace periods under the Microsoft Agreement for delivery extending from mid-Q4 of calendar 2026 to the beginning of Q2 of calendar 2027."
We can infer from this that Horizon 2 is within its grace period if it's delivered before "mid-Q4", which we can consider to be November 15.
If Microsoft expected Horizon 2 to be delivered by September 30, then making the grace period for that delivery "mid-Q4" gives it approximately 45 days between the assumed original date and the grace period ending.
Now Horizon 4 has an inferred grace period ending by April 1st, so that would be more than 3 months after IREN's own "EOY 2026" deadline for it.
If Microsoft expected Horizon 2 by September 30, it would have approximately 45 days of grace to meet the "mid-Q4" qualification.
By that same token, would Microsoft then expect Horizon 4 to be delivered 45 days before April 2027?
Why would Horizon 2 receive a shorter grace period than Horizon 4?
This is a very interesting topic, because clearly there is a discrepancy here between what Microsoft knew on July 29 and what has been contractually agreed upon, which matches the grace periods.
Still, I believe that Microsoft would not report something they knew was not going to happen on July 29, despite having contractual agreements saying it should be delivered then.
If Horizon 4 has a similar grace period as Horizon 2, it makes perfect sense that Horizon 2 was agreed upon to be delivered well before September 30.
But that does not overrule the fact that Microsoft was well aware of the status of the project by July 29, when they disclosed their FY27 Q1 CapEx guidance.
Considerations:
-> Did IREN not properly inform Microsoft of the status of Horizon 2 by July 29?
-> Did IREN lean on grace periods, counting on having more time to deliver it within their agreed-upon delivery time with Microsoft, while still being in line with their communication towards the market?
-> Or did Microsoft know about Horizon 2 not making the September quarter, but still guided for it because it was within the original contracted target date?
Taking all things into account, the whole situation doesn't add up.
Either IREN or Microsoft must have known by July 29 that it would be incredibly hard, or near impossible, to get Horizon 2 up and running and merged with Horizon 1 before the end of September.
IREN already indicated to the market that it did not expect to meet a September deadline for Horizon 2 (if there even was any), by explicitly placing Horizon 2 in the December quarter.
Is this a case of miscommunication between IREN and Microsoft in the weeks leading up to their earnings call?
Did Microsoft gloss over all these 3rd party contracts, rounding up their expected CapEx plans for the September quarter, keeping in line with market expectations, and not giving attention to upcoming delays they were already aware of?
IREN is being sacrificed by the market, and targeted by The Information without any kind of nuance considering all I have said above.
As far as we know today, the "delay" is inconsequential, and both parties were well aware of this in August, and more importantly: the market already knew Horizon 2 was placed in the December quarter.
How can anyone confidently make this a real "news" item, if the nuance around this delivery is likely more relevant than the "delay" itself?
Honestly, this whole thing is completely overblown, and given the fact that it just seems to be about finger-pointing at 1 company, while not being able to quantify the delayed amount, I think it's important to scrutinize this calling out of only IREN.
Clearly, this is a great headline for the Blockspaces and SemiAnalysis of this world to run. But if you zoom in, and look at what is really reported, expected, and disclosed, you will find that this is just rehashing old news, in favor of getting clicks and engagement.
Unfortunately, IREN is the AI Cloud scapegoat of 2026, and clearly there are various reasons for that, both founded and unfounded.
But when IREN and Microsoft have internal arrangements that move capacity from one fiscal quarter to another, I think we should not go out here and blame them for delays, when they are well within their contractual (grace) periods.
Now I will go briefly into the other "delay" that is going around, because yes, Microsoft has noted another delay as I said at the beginning of this post.
The FY27 Q2 CapEx guidance also referenced third-party GPU leases that had been pushed into FY27 H2.
I'm well aware of information circulating that Aterio has said that Horizon 4 looks to be delayed, and @Jefferies has cut their price target on IREN for it, but from my latest aerial imagery and satellite footage, I have no reason to believe that H3–H4 as a cluster will miss the year-end deadline.
Unfortunately, my next flyover is probably just after the earnings call, but I will do my best to come back to this when the content comes in.
For now, don't follow the herd and don't just take what The Information tells you as a reason to blame IREN for anything that Microsoft has said.
We don't know a lot of things, and just quoting an unnamed source without any numbers or proof is not how we like to do things around here.
Thank you so much, I am happy it brings you value 🙏
Quick shoutout to @osoloco22 for building gextool.com.
The tool is completely FREE to use.
I like using it alongside regular charting to illuminate market movements from an additional perspective.
It tracks gamma exposure and market maker hedging dynamics for tickers like $NBIS, $RKLB, $PLTR, $AMD, $IREN and $NVDA. (+ many more)
Currently data updates 15 minutes after the market open.
With enough community support, real time data will be added.
Check it out: gextool.com/ticker/nbis
1
86
Johnny B. retweeted
Today I will be educating you with some construction progress at $IREN sites in Texas.
Additionally, I will try to explain why the current strategy is the optimal one, and attempt to clarify some misunderstandings around the company and its trajectory.
IREN's 2GW Sweetwater Hub (Sweetwater 1 and Sweetwater 2) has been included in ERCOT's Batch Zero process as Base Load. Sweetwater 1 (1,400MW) and Sweetwater 2 (600MW) form part of our >5GW global data center development portfolio.
At Sweetwater 1, construction of 300MW of data center capacity continues, with delivery targeted for Q4 2027.
Read more: iren.gcs-web.com/static-file…
Johnny B. retweeted
I would like to introduce TLDL HUB Research. The idea is to analyze EC of interesting companies. Of course first is $iren but more will come later.
Here is the FY2026 $Iren EC transcript with chapters, verified claims, SEC filings and knowledge base.
tldlspaces.com/s/iren-fy26-r…
tldlspaces.com/iren
Johnny B. retweeted
$iren Check out the transcript after this soace ends: tldlspaces.com/s/sunday-nigh…
$IREN Weekly Space - 8/23/2026
Join me and @bitcoinbutcher1 for another Sunday night space @ 9PM ET.
- IREN earnings predictions
- $NVDA price hike / earnings
- $CIFR drawdown
Everything AI infrastructure
Will be recorded
teapaw.org/i/spaces/1jGXgBzlqEvKZ…
Johnny B. retweeted
$iren Another spaces transcript is ready !
Replying to @bitcoinbutcher1
Great space, thank you! Transcript with chapters is here: tldlspaces.com/s/iren-sunday…
Johnny B. retweeted
Transcript of @bitcoinbutcher1 's space is here tldlspaces.com/s/neocloud-co…
I would like to introduce TLDL HUB Research. The idea is to analyze EC of interesting companies. Of course first is $iren but more will come later.
Here is the FY2026 $Iren EC transcript with chapters, verified claims, SEC filings and knowledge base.
tldlspaces.com/s/iren-fy26-r…
tldlspaces.com/iren
$iren Check out the transcript after this soace ends: tldlspaces.com/s/sunday-nigh…
$IREN Weekly Space - 8/23/2026
Join me and @bitcoinbutcher1 for another Sunday night space @ 9PM ET.
- IREN earnings predictions
- $NVDA price hike / earnings
- $CIFR drawdown
Everything AI infrastructure
Will be recorded
teapaw.org/i/spaces/1jGXgBzlqEvKZ…
Horizon 1: delivered.
IREN has delivered Horizon 1 to Microsoft and achieved NVIDIA Exemplar Cloud status on NVIDIA GB300 NVL72.
Read more: iren.gcs-web.com/static-file…
3
441
Transcript of @bitcoinbutcher1 's space is here tldlspaces.com/s/neocloud-co…
$iren Another spaces transcript is ready !
Replying to @bitcoinbutcher1
Great space, thank you! Transcript with chapters is here: tldlspaces.com/s/iren-sunday…
Another great piece by @jiahanjimliu . If you want to listen to it, tldlspaces.com has it as a recording, including summary, chapters, reading mode and etc. Check it out!
tldlspaces.com/s/jim-liu-jia…
Macro Thesis of the AI Buildout
Common justifications of the AI buildout circle around Capex commitments, productivity boom, and either ASI or AGI. However, I want to tie together a broader macro picture; after all, Hyperscalers, frontier labs, Neoclouds derive profits from their end customers which sit in a larger economic system.
Liquidity, Production and Inflation
First, I need to cover historical precedence to illustrate dynamics in liquidity, production and inflation. Without a loss of generality, I will oversimplify to not stretch into tangents.
Prior to industrialization, investment into small items such as farming tools to large items such as canals led to an increase in production. These investments were made using both credit on a personal level and bonds on a government level. If credit was too loose or currency expanded too fast, society would face inflation.
During the industrial revolution, the steam engine and coal powered factories allowed for much larger investments without inflation. First, the multiplier in production was so much greater. Second, the investment was split into labor and machines. Most of currency that went towards machines was concentrated into capitalists and hoarded rather than spent.
During age of financialization and digitalization, outsourcing and computers introduced productivity improvements through cheaper labor and automation. These investments flowed into large enterprises and into finance and tech workers. Both financialization and digitalization required much fewer workers than industrial labor. Thus, the liquidity increase was concentrated in a finance and tech upper-middle class that stored much of their value into stocks, bonds and the real estate of NYC, London, Hong Kong, Tokyo, Bay Area, etc. Inflation concentrated in real estate and stocks does not drive up inflation that much in daily goods.
AI: Liquidity, Production and Inflation
AI is a more extreme revolution compared to industrialization, financialization, and digitalization. The investment cashflow goes to a very concentrated segment of the population, namely the companies driving the AI buildout. Within these companies, there is less human headcount than ever before. In a society addicted to liquidity expansion, this concentration results in less inflation. The liquidity be heavily stored in assets and those who invest in AI will benefit disproportionately more from this liquidity expansion.
Moreover, the productivity increase is compounded on top of industrialization, financialization, and digitalization. AI will be operating factories through sensors and robots, access everything through an efficient financial system, and work directly on top of the digital world that humans have pioneer for decades. AI will be working 24/7/365 with PhD+ IQ. This will result in deflation which allows the government to expand liquidity.
Some people understand this concept a different way: the value of the dollar hasn't gone up despite massive productivity increases. AI provides the environment that stretches the limits of this dynamic.
Overbuilds and Speed of Technological Diffusion
We want to look at the fundamentals underlying the booms and bust due to euphoria and overbuild. Without getting to bogged down in history this time, I'll focus on the dot-com bust.
All the promises of the 1999 dot-com bubble came 15 years late in the form of Google Search, Amazon Web Services, Facebook Social Media, Microsoft Enterprise Software, and Apple iPhones. The bust was a limitation on how fast humans could reorient the physical world and society to fit the digital revolution.
AI has a higher speed of technological deffusion because it skates on top of the digital world. And the digital world reorients much faster than the physical world. General software engineering has grinded to almost a standstill in face of more software getting written than ever before. Digitalization brought shopping online but ad targeting pioneered by Google Ads, Meta AI, and Amazon has completed the revolution. Data Analyst now work with the output of AIs to optimize supply chains. Self driving is on the cusp of full city limit rollouts. We are seeing the first of AI generated images and videos for ads and entertainment. AI adoption in drones will change the military complex.
This higher rate of diffusion will allow the AI buildout to significantly longer than the dot com boom. Additional there are race effects between enterprises and sovereigns to make sustained investments before seeing concrete returns.
Layers of the AI Buildout
I will give intros to major layers of the AI Buildout and include some investments I'm monitoring as high potential. I will link longer form research posts in the comments as I write them.
Inference Layer
Every on X is hyped about open source and open source will generate alot of revenue but there's no way to argue around the revenue numbers that Anthropic and OpenAI are putting out. Anthropic is at 80B ARR (1) and OpenAI is at 42.6B (2).
There's a misconception that open source is cheaper because the model itself is free. However, that is not necessary true as OpenAI has higher efficiencies in inference and compute which allow them to serve ChatGPT-5.6 Luna cheaper and more intelligent than open source (3).
Where open source models achieve significant market share is enterprises incorporating proprietary data. While many AI Platforms announced day 0 Kimi K3 inference (4), @FireworksAI_HQ is the only AI Platform which has specialized post-training for Kimi K3 (5).
For tracking open source provider market share, the closest proxy tracker is OpenRouter. Yes, OpenRouter is only ~1% of global tokens, but once you account for the fact that the vast majority of global token is OpenAI, Anthropic, Hyperscalers, and on-prem, you will see that OpenRouter is a significant share of of non-free open source tokens.
Most importantly, OpenRouter is a all else equal, whose inference service get's chosen because switching between providers is seamlessly on OpenRouter. Because there are so many semi-commoditized providers of open source models, profit will flow to the rest of the layers. For example for DeepSeek V4 Pro, there are 18 providers on OpenRouter (18), and that's not even including the Azure, Oracle, and GCP who serve it directly (8, 9, 10).
Closed source frontier lab revenue will also drive profits to most of the bottom layers except for orchestration layer which is in-house and potentially some ASICs will be in-house.
Orchestration Layer
Obviously hyperscalers and frontier labs excel here, but @FireworksAI_HQ and $CRWV have the best orchestration relative to their market cap.
Fireworks AI leads in cache hit rate among Kimi K3 providers outside of Moonshot AI (6). Cache hit rate is subject to variance in customer requests but is a proxy measurement of intelligent request routing, prefix cache efficiency, and KV cache management.
Outside of the hyperscalers, Coreweave has the best quality and diversification of enterprise customers with customers such as Anthropic, OpenAI, Jane Street, Cloudflare, Mistral, Cohere, Perplexity, Cursor, Cognition, Midjourney, RunwayAI, Crowdstrike, Mecado Libre (11).
Nvidia is has been growing up from CUDA/NCCL into this layer and there is a risk of commoditization within this layer. Nvidia Run:ai which is part of DSX OS, utilizes "advanced orchestration, NVIDIA Run:ai significantly enhances GPU efficiency and workload capacity" (12).
Power, Datacenter, Bare Metal
$IREN has the strongest power portfolio out of the Neoclouds with 5.8 GW of power that is grid firm and 100% powered by renewable energy (13 - AUS and Spain not updated on website are 800MW and 490MW). At this physical layer, IREN is the only Neocloud that is vertically integrated on all it's sites and does not use any colocation providers.
Vertical integration on the physical layer will be an significant advantage as the buildout scales and IREN's workforce builds institutional knowledge through each site. Vertical integration in this layer is investment in a team that learns and improves time to compute. For Neoclouds that depend on colocation, this institutional knowledge builds in each supplier.
Behind the meter will also see large growth. $NUAI is a binary bet on a team with expertise in natural gas in the Permian Basin and a site in TCDC with triple gas pipelines for redundancy (14). $BE is the default option for clean behind the meter power generation.
Silicon Design
$NVDA is the king of not only the AI compute engine (GPUs and ASICs via Groq) but has a moat in AI networking, datacenter design, software layers like CUDA/NCCL and DSX OS, and leader position in the being able to secure the semiconductor supply chain.
HBM has risen from commodities off the back of two developments:
1. Yield challenges in stacking have turned the HBM fabrication process into a moat much like how yield for TSMC is a core moat.
2. HBM is now co-design with GPUs and ASICs.
$SKHY, $MU and Samsung have a triopoly on HBM. CXMT makes DRAM but not HBM.
Many people talk about photonics because the number of connections from photons are replace copper. Fiber has long dominated long distances and moved to smaller and smaller distances. And no it's not the cable where the money is made but rather it's the transceivers. At the smaller distance, exponentially more connections are made which means exponentially more transceivers.
The transceiver is composed of silicon components or co-packaged components. The Photonic Integrated Circuit (PIC) is silicon that manipulates light. InP is the laser while the photodetector is often germanium. $LITE is the leader here.
Silicon Fabrication
There are only three fabs in the world capable of the most advance nodes: TSMC, $INTC, Samsung. TSMC is dominant but $INTC is the most interesting play here.
Intel was dominant in silicon fabs for many years and only fell behind under Brian Krzanich who was a bean counting quarterly performance optimizer who tried to chase every buzzword and diversified Intel into IoT, processors for wearables, 5G modems, FPGAs, storage, memory, cameras, self-driving, drones (15). Yes, Intel Drones (15)!
Intel actually has some of the best IP in both silicon etching, packaging, and backside power delivery. Now with refocusing by Gelsinger and Lip-Bu Tan, Intel is set to potentially surprise in 18A and 14A. Oh and Intel still makes the best CPUs.
Among Fabs is also $TSEM which is the leader in silicon-photonics fabs.
Application
I separate application from inference as it's the harness and business application that utilizes the tokens. There will be many new companies that will be born in this layer as AI matures. A current winner is $META. $META is worth ~1.7T compared to Google's 4.35T but is similar in many aspects:
1. Mastered integrating AI into ad targeting.
2. Muse Spark 1.1 > Gemini.
3. TPU > MTIA.
4. Dominant Network effects in Social Media vs Search/YouTube.
However, AI has some cannibalization risk to Google's core search business while AI synergizes well with social media. Yes Google's search business is still growing because AI increases digital use in general but you can see the difference in that Meta's social media numbers are growing much faster than Google's search numbers.
The big delta in market cap is explained by GCP. However, with META looking to enter as a Cloud Provider, if META's model improves faster than Google's then META compute has a decent chance of growing faster than GCP.
Robotics
$TSLA is in a unique position because it's manufacturing advantage will convert into a data advantage which will allow it to lead in FSD and generalized applications of Optimus. Yes $TSLA stock been inside a volatile consolidation range for 5 years and opportunity cost has been high but when $TSLA breaks out, it's significant. Although $TSLA has a very large market cap already which all else equal means smaller percentage gain, it's important to track $TSLA as it will have an impact to the development of the robotics industry.
If TSLA is for the lidar less applications, then $OUST is for the lidar applications. The team at $OUST is phenomenal and many robotics applications which rely on proprietary data but do not have sheer volume of data for a image based neural net will use lidar.
In Drones, Anduril dominates the high tech, expensive, military drones while $ONDS does very well with tailored deployments for airports, stadiums, etc. Drones will all be autonomous and behind it will be potentially massive military spending. For counter drones, EOS.AX is interesting as a laser based defense to drones.
Risks
Every good investment analysis includes assessment of risks.
The first risk is accelerated depreciation which is closely tied to overcapacity. As long as compute is under-capacity, accelerated deprecation will be unlikely because in a scarce regime, companies have to use what's available. If that's A100s, that's A100s which is exactly what we are seeing today. A100s came out May 2020 and are 6 years old now and with A100s being renewed this year, they will go into year 7.
Overcapacity is something we have to monitor closely as it's a complex function of model and efficiency improvements but from the supply side the current dominating force is limitation in silicon fabs, memory fabs, potentially photonics materials, firm power, blue collar labor to build the datacenters. On the demand side, there is Jevon's paradox on what is potentially the most fungible resource ever: intelligence.
Commoditization can be a serious risk to some layers. For example, AI itself is eating away at the software moats with CUDA no longer being a moat and AI being increasingly being able to optimize much of the orchestration umbrella of request routing, prefix cache hits, KV cache management, batching, model routing, GPU scheduling, auto-scaling, load balancing.
For every strong ROI story like Meta ad targeting, there will be many weak ROI as enterprises like Klarna have failed to replace customer service with AI. Many of these ROI failures will be solved with intelligence in models. For example, although AI has been surprisingly underwhelming in customer service, ChatGPT voice models are become increasingly better. Voice models will require more compute and enterprises failing to integrate AI into customer service are those using the old transcript into small model approach. Now that only addresses quality, not ROI. However, AI compute drastically increasing in efficiency and Jevon's paradox will make using expensive voice models in lower value tasks like customer service become positive ROI. The same risk that drives commoditization helps improve ROI.
Scientific break though is complex and not fully within the scope of this post. However, when you take a look of the entire history of AI, you'll see that compute and algorithm efficiency have continously been made and that's what has enabled the level of intelligence we have today. Efficiency breakthroughs are swallowed up utilization of compute for higher intelligence. This is the Intelligence Corollary of Jevon's Paradox: the more efficient AI compute and algorithms are, more of the resource will be used to unlock the next level of intelligence.
SpaceDCs are a risk to the power layer and Neocloud specifically as it potentially allows X company SpaceX to have an innate advantage. However, anyone who has seen datacenter operations knows that continuous maintenance is crucial and the energy and cost consumption is neither green nor cheap.
Customer concentration is another risk and real. AI will generate wealth for a more concentrated set of companies than ever. That's why I invest in leaders or refungible layers like grid connected power. No whether Open Source or OpenAI/Anthropic become dominant, AI doesn't print powered datacenters and GPUs and $IREN will be able to sell to the winner.
Regulation and politics are a risk. If this happens, certain companies may be able to do regulatory capture of profits and it will be prudent to invest along those companies' supply chain.
Security is another risk but the way to battle AI enable hacks is to use AI. This drives up the demand for AI.
Political backlash is an often mentioned risk in the news these days but fear of losing China will be a more sensible fear. We've already lost much of manufacturing to China. If the West looses intelligence via AI to China, its over.
$iren Another IREN Weekly Space is out, here is the transcript tldlspaces.com/s/iren-weekly…
It contains chapters so you can quickly browse it and listen and read the most interesting parts!
Join me and @bitcoinbutcher1 for another $IREN Space on Sunday night
This time, it will be 10 PM ET
It will be the official teaser for a Horizon 1 announcement, including a "wake up early".
See you there.
will be recorded for Europoors ⏺️
teapaw.org/i/spaces/1dxYllEoePDJX…
Johnny B. retweeted
"there are thousands of people on our sites right now pouring concrete and racking GPUs."
$IREN CEO Dan Roberts speaks the truth.
This OnlyFrans image was captured on Sunday 7/26, and reflects a packed site at 8am.
Horizon 2 has GPUs, and fresh concrete is abundant.
Bullish!
8 years ago Will and I started accumulating powered land because we thought compute would eat the world. Some weeks the market agrees with us more than others.
What we know today: demand for our capacity exceeds everything we can build, 85% of our $4bn+ 2026 target is signed, and there are thousands of people on our sites right now pouring concrete and racking GPUs.
We've been through way worse than this. Back to it.


















