AleSimo retweeted
$GMV.V $GMVMF #gold
Headline hit!!!!
Ian Klassen, President & CEO remarked, "MHC26-14 returned one of the highest gold drill intersections reported at the Mexican Hat project to date. All drill holes appear to have intersected significant gold mineralization within the established solids, enabling modelling refinements and an enhancement to the accuracy of the resource model.
tsxgpt.com/stock/TSXV/GMV/GM…
I admit my track record hasn’t been great this year (although a couple of good plays, like FRED and DLP, saved my portfolio), but $GMV.V is now by far my largest holding: US$11m market cap versus US$744.4m after-tax NPV at US$4,000/oz gold.
GMV Minerals Announces Assays from 2026 Diamond Drill Program including: 12.64 gpt Gold over 4.88 m in MHC26-14 $GMV.V tinyurl.com/28b5nly6
1
1
103
AleSimo retweeted
Surge Copper Announces Results of Berg Pre-Feasibility Study with After-Tax NPV8% of C$4.6 billion and 24% IRR $SURG.V tinyurl.com/2aknkdd8
The PHEPA Interim Report is now available.
DG HERA is proud to support the work of @ECDC_EU in strengthening public health emergency preparedness across the #EU, with a particular focus on preparedness planning for medical countermeasures.
👉🔗ecdc.europa.eu/en/publicatio…
AleSimo retweeted
$ATY.v is a big beneficiary of higher copper prices. Copper sales in Q1 were realized at an average price of USD 5.58/lb. Today, the copper price is a dollar higher (USD 6.59/lb). Based on this higher price and assuming annual copper sales from El Roble of 11M pounds, Atico's pre-tax cash flow increases by USD 11M per year = CAD 15.2M, all else equal. That's almost one third of the company's current mcap. After tax, a one dollar increase in copper prices lifts FCF by an amount that constitutes appr. 20% of Atico's mcap, assuming a copper production of 11M pounds per year.
Atico currently operates only one producing asset (El Roble). The second and larger asset (La Plata), which is also a gold/copper project, will be advanced to a construction decision in Q3 2026 and start production in 2028. Atico's current mcap implies almost no value for La Plata. This should change as soon as project financing is secured (the big catalyst!) and construction of the mine starts.
AleSimo retweeted
Atico Mining ($ATY.v) released Q1 results:
- USD 9.87M cash flow from ops before WC movements = USD 39.5M annualized
- USD 8.25M adj. cash flow from ops before WC movements = USD 33M annualized
- USD 6.25M adj. FCF after capex and financing activities = USD 25M annualized
- EV/adj. CFO: 1.5x (fully diluted)
- EV/adj. FCF: 1.9x (fully diluted)
The aforementioned adj. numbers include tax costs based on present earnings instead of deferred taxes). Based on these numbers Atico looks very cheap. The company currently operates only 1 mine (El Roble in Columbia). Remaining mine life based on existing MRE is very short. However, post-MRE drill results have shown higher grades than MRE in mineralization zones that are open at depth and along strike. This, in connection with ongoing exploration activities, should allow a multi-year mine life extension.
Atico’s second asset (La Plata in Ecuador) is a development-stage polymetallic project. All major permits have been obtained. The construction permit is still pending and a construction decision is expected in H2 2026. Project financing still has to be secured (USD 91M acc. to FS). At 4.5k gold, 5.90 copper and 70 silver, La Plata alone will generate an annual FCF that is 1.5x Atico’s current EV.
The balance sheet is still a little stressed with a working capital deficit, but this will improve in the next quarters due to positive cash flows from El Roble. The biggest hurdle is securing project financing for La Plata. If/when this is achieved, Atico should fly. Not without risk.
AleSimo retweeted
Very grateful for all the good interactions I got with the investor community on X. For new followers I will give some examples in below thread what kind of analysis / stock picking that you can get inspiration through following this account. Retweets appreciated. 1/x
$FRED.V might currently be my favorite junior miner setup: trading 20% below its most recent financing (which closed just 20 days ago - a significant de-risking event), insider owns over 50% + PEA is expected by the end H1 2026. Plus I am particularly bullish on Argentina lately
This quoted post is unavailable.
1
4
673
AleSimo retweeted
$ATY.V today announcing significant progress in the permitting for their second project La Plata. On track to be construction ready in Q3 2026. NPV at spot > $247M
This is IN ADDITION to their current PRODUCING asset with 2026 guidance of 9-10k/Oz Au & 11.5k-12.5k lbs Cu.
Fully diluted market cap around $55M 🧐🧐
AleSimo retweeted
$ATY.v received the environmental permit for its La Plata project. This is an important milestone. All major permits are now in place. Only a few auxiliary permits are still necessary. Construction decision is scheduled for Q2/Q3 2026.
When La Plata starts production, $ATY.v will have one of the highest cash flow yields in the entire precious metals sector. At 5k gold, 5 copper and 80 silver, the annual AISC margin will far exceed 100% of the company’s fully diluted mcap even under very conservative cost assumptions. If $ATY.v can avoid larger cost increases until La Plata is up and running, the AISC margin has the potential to reach 200% of fully diluted mcap in the aforementioned Au/Cu/Ag price environment.
AleSimo retweeted
$AGLD.v $AGD.ax Austral Gold - strong quarter 💪
$10M QUARTERLY Operating cashflow with $9.2M increase in net cash since Q3
Increasing guidance to 27k-33k GEO (based on own ore ex $CEL.ax toll processing aggrement)
AISC down q/q, brown and green field exploration.
All this for $120M EV 🧐
Who cares if gold drops back to $4k/oz these juniors are still printing 💰💰
$AGLD.V
- During the quarter, the Company reduced net liabilities from US$27.3 million to US$16.1 million
- Production guidance for the Guanaco mine was increased to 16,000–20,000 GEOs for 2026, up from the previous guidance of 15,000–17,000 GEOs announced in Dec 2025.
3
259
AleSimo retweeted
$ATY.v released Q4 production numbers and 2026 guidance. Things are moving in the right direction with Q4 copper production increasing q/q and a further increase expected in 2026. Higher copper production in 2026 will reduce unit costs (AISC). A further decrease in AISC will come from a y/y rise in gold prices as AISC is calculated on a by-product basis, i.e. net of gold credits. What cash flows can we expect this year? Some numbers:
At $4,800 gold and $5 copper and assuming an AISC level of $2 per pound of copper (net of by-products), the AISC margin in 2026 will be USD 36M = CAD 50M based on a copper production of 12M pounds (mid-point of guidance). That's 70% of $ATY.v's fully diluted mcap, solely coming from El Roble. FCF after deducting corporate G&A, finance costs and taxes should land around USD 20M = CAD 28M. That translates into a P/FCF multiple of only 1.8x (basic) and 2.5x (fully diluted).
Atico's La Plata project will lead to further growth. A construction decision is scheduled for Q2/Q3 this year. La Plata will generate higher cash flows than El Roble due to its lower cost structure and higher gold production. El Roble will probably start producing in 2028, provided there are no delays.
Note: El Roble has a remaining mine life of only 2.5 years acc. to the last technical report. However, I expect that $ATY.v will be able to extend the resource base and, consequently, the mine life via further drilling.














