AleSimo (@AleSimo19) profile picture

COVID-19 research

Joined March 2021
Photo by AleSimo (@AleSimo19)Photo by AleSimo (@AleSimo19)Photo by AleSimo (@AleSimo19)Photo by AleSimo (@AleSimo19)Photo by AleSimo (@AleSimo19)
$GMV.V $GMVMF #gold Headline hit!!!! Ian Klassen, President & CEO remarked, "MHC26-14 returned one of the highest gold drill intersections reported at the Mexican Hat project to date. All drill holes appear to have intersected significant gold mineralization within the established solids, enabling modelling refinements and an enhancement to the accuracy of the resource model. tsxgpt.com/stock/TSXV/GMV/GM…
4
1
6
267
AleSimo retweeted
The PHEPA Interim Report is now available. DG HERA is proud to support the work of @ECDC_EU in strengthening public health emergency preparedness across the #EU, with a particular focus on preparedness planning for medical countermeasures. 👉🔗ecdc.europa.eu/en/publicatio…
2
9
947
$ATY.v is a big beneficiary of higher copper prices. Copper sales in Q1 were realized at an average price of USD 5.58/lb. Today, the copper price is a dollar higher (USD 6.59/lb). Based on this higher price and assuming annual copper sales from El Roble of 11M pounds, Atico's pre-tax cash flow increases by USD 11M per year = CAD 15.2M, all else equal. That's almost one third of the company's current mcap. After tax, a one dollar increase in copper prices lifts FCF by an amount that constitutes appr. 20% of Atico's mcap, assuming a copper production of 11M pounds per year. Atico currently operates only one producing asset (El Roble). The second and larger asset (La Plata), which is also a gold/copper project, will be advanced to a construction decision in Q3 2026 and start production in 2028. Atico's current mcap implies almost no value for La Plata. This should change as soon as project financing is secured (the big catalyst!) and construction of the mine starts.
6
5
1
21
2,247
Atico Mining ($ATY.v) released Q1 results: - USD 9.87M cash flow from ops before WC movements = USD 39.5M annualized - USD 8.25M adj. cash flow from ops before WC movements = USD 33M annualized - USD 6.25M adj. FCF after capex and financing activities = USD 25M annualized - EV/adj. CFO: 1.5x (fully diluted) - EV/adj. FCF: 1.9x (fully diluted) The aforementioned adj. numbers include tax costs based on present earnings instead of deferred taxes). Based on these numbers Atico looks very cheap. The company currently operates only 1 mine (El Roble in Columbia). Remaining mine life based on existing MRE is very short. However, post-MRE drill results have shown higher grades than MRE in mineralization zones that are open at depth and along strike. This, in connection with ongoing exploration activities, should allow a multi-year mine life extension. Atico’s second asset (La Plata in Ecuador) is a development-stage polymetallic project. All major permits have been obtained. The construction permit is still pending and a construction decision is expected in H2 2026. Project financing still has to be secured (USD 91M acc. to FS). At 4.5k gold, 5.90 copper and 70 silver, La Plata alone will generate an annual FCF that is 1.5x Atico’s current EV. The balance sheet is still a little stressed with a working capital deficit, but this will improve in the next quarters due to positive cash flows from El Roble. The biggest hurdle is securing project financing for La Plata. If/when this is achieved, Atico should fly. Not without risk.
2
2
1
15
1,774
AleSimo retweeted
Very grateful for all the good interactions I got with the investor community on X. For new followers I will give some examples in below thread what kind of analysis / stock picking that you can get inspiration through following this account. Retweets appreciated. 1/x
11
20
103
10,996
AleSimo retweeted
$ATY.V today announcing significant progress in the permitting for their second project La Plata. On track to be construction ready in Q3 2026. NPV at spot > $247M This is IN ADDITION to their current PRODUCING asset with 2026 guidance of 9-10k/Oz Au & 11.5k-12.5k lbs Cu. Fully diluted market cap around $55M 🧐🧐
1
1
1
7
4,882
$ATY.v received the environmental permit for its La Plata project. This is an important milestone. All major permits are now in place. Only a few auxiliary permits are still necessary. Construction decision is scheduled for Q2/Q3 2026. When La Plata starts production, $ATY.v will have one of the highest cash flow yields in the entire precious metals sector. At 5k gold, 5 copper and 80 silver, the annual AISC margin will far exceed 100% of the company’s fully diluted mcap even under very conservative cost assumptions. If $ATY.v can avoid larger cost increases until La Plata is up and running, the AISC margin has the potential to reach 200% of fully diluted mcap in the aforementioned Au/Cu/Ag price environment.
1
4
1
25
3,894
AleSimo retweeted
$AGLD.v $AGD.ax Austral Gold - strong quarter 💪 $10M QUARTERLY Operating cashflow with $9.2M increase in net cash since Q3 Increasing guidance to 27k-33k GEO (based on own ore ex $CEL.ax toll processing aggrement) AISC down q/q, brown and green field exploration. All this for $120M EV 🧐 Who cares if gold drops back to $4k/oz these juniors are still printing 💰💰
5
3
27
13,072
$ATY.v released Q4 production numbers and 2026 guidance. Things are moving in the right direction with Q4 copper production increasing q/q and a further increase expected in 2026. Higher copper production in 2026 will reduce unit costs (AISC). A further decrease in AISC will come from a y/y rise in gold prices as AISC is calculated on a by-product basis, i.e. net of gold credits. What cash flows can we expect this year? Some numbers: At $4,800 gold and $5 copper and assuming an AISC level of $2 per pound of copper (net of by-products), the AISC margin in 2026 will be USD 36M = CAD 50M based on a copper production of 12M pounds (mid-point of guidance). That's 70% of $ATY.v's fully diluted mcap, solely coming from El Roble. FCF after deducting corporate G&A, finance costs and taxes should land around USD 20M = CAD 28M. That translates into a P/FCF multiple of only 1.8x (basic) and 2.5x (fully diluted). Atico's La Plata project will lead to further growth. A construction decision is scheduled for Q2/Q3 this year. La Plata will generate higher cash flows than El Roble due to its lower cost structure and higher gold production. El Roble will probably start producing in 2028, provided there are no delays. Note: El Roble has a remaining mine life of only 2.5 years acc. to the last technical report. However, I expect that $ATY.v will be able to extend the resource base and, consequently, the mine life via further drilling.
3
5
3
24
5,910
AleSimo retweeted
$ATY.v is a nice find. Very high FCF ~ p/FCF~2.5x. High insider ownership. Short LOM but VMS deposit implies high probability of regional exploration success. NPV of second project is > $274M at spot prices! All this for a fully diluted mkt cap of $55M 🧐🧐 Thank you @FredKosters
$ATY.v released Q4 production numbers and 2026 guidance. Things are moving in the right direction with Q4 copper production increasing q/q and a further increase expected in 2026. Higher copper production in 2026 will reduce unit costs (AISC). A further decrease in AISC will come from a y/y rise in gold prices as AISC is calculated on a by-product basis, i.e. net of gold credits. What cash flows can we expect this year? Some numbers: At $4,800 gold and $5 copper and assuming an AISC level of $2 per pound of copper (net of by-products), the AISC margin in 2026 will be USD 36M = CAD 50M based on a copper production of 12M pounds (mid-point of guidance). That's 70% of $ATY.v's fully diluted mcap, solely coming from El Roble. FCF after deducting corporate G&A, finance costs and taxes should land around USD 20M = CAD 28M. That translates into a P/FCF multiple of only 1.8x (basic) and 2.5x (fully diluted). Atico's La Plata project will lead to further growth. A construction decision is scheduled for Q2/Q3 this year. La Plata will generate higher cash flows than El Roble due to its lower cost structure and higher gold production. El Roble will probably start producing in 2028, provided there are no delays. Note: El Roble has a remaining mine life of only 2.5 years acc. to the last technical report. However, I expect that $ATY.v will be able to extend the resource base and, consequently, the mine life via further drilling.
1
2
1
6
3,284
$CLA.ax (Celsius Resources) just released the Definitive Feasibility Study for the MCB project in the Philippines. The numbers on a 100% (gross) basis: - After-tax NPV8: 771M USD = 1.15 billion AUD based on copper and gold prices of 4.30/lb Cu and 3,000/oz Au in the first 9 years and 7/lb Cu and 4,500/oz Au for the remaining life of mine. - After-tax NPV8 at 6/lb Cu and 4,500 Au: 1.2 billion USD = 1.8 billion AUD - Ultra-long mine life of 35.3 years. - Cash costs net of gold credits: 0.41/lb Cu during the first 10 years. - EBITDA of 230M USD = 345M AUD per year in the first 10 years of production based on copper and gold prices of 4.30/lb Cu and 3,000/oz Au in the first 9 years and 7/lb Cu and 4,500/oz Au in year 10. - Average annual production of 54.2M lbs Cu and 31.9koz Au during the first 10 years. - First copper and gold expected in Q2/Q3 2028. DFS looks very good. NPV8 of 1.15 and 1.8 billion AUD in the aforementioned 2 scenarios is equal to 14x and 22x current mcap (fully diluted). At an annual EBITDA level of 345M AUD in years 1-10 $CLA.ax generates more than 4 times its current mcap (fully diluted) in EBITDA per year. If the transfer of a 60% interest in the MCB project to Sodor goes through (still pending as CLA has not yet received the owed payment), annual EBITDA will still be a whopping 168% of CLA’s current mcap (fully diluted). Since the transfer is a requirement under the laws of the Philippines, we should assume that CLA will have a 40% working interest in the MCB project going forward. Please remember that pre-production capex of 414M AUD is high when put in relation to current mcap. As a result, material equity dilution will have to be expected.
4
1
16
4,480
Not investment advice. The stock is Majestic Gold. $MJS.V Maybe for most people is not known. Market Cap 115 million usd Net Cash Attribuable=Around 50 million EV=65 million usd Production 26 attribuable to them=23k ounces at 1000$ AISC 27 is 56k ounces at same AISC 1/n
8
9
3
49
31,590
$AGLD.V - AUSTRAL GOLD I took a position in a new Gold producer with excellent Silver exposure. The production guidance for 2026 is 26-28,000 OZ Gold Equivalent at $1,900 AISC.
For those who are not yet familiar with Austral Gold $AGLD.V $AGD.AX Price: 0.11 AUD (in Canada, the closing price on Friday was 0.125 CAD, equivalent to 0.136 AUD) Projected production in 2026: estimated 26,000-30,000 oz au ea
4
8
2
33
43,270
For those who are not yet familiar with Austral Gold $AGLD.V $AGD.AX Price: 0.11 AUD (in Canada, the closing price on Friday was 0.125 CAD, equivalent to 0.136 AUD) Projected production in 2026: estimated 26,000-30,000 oz au ea
2
4
1
10
12,536
Replying to @James56487175
I now also own Atico $ATY.V That makes for 3 stocks that we both own/owned $CERT.V $MCI.V $ATY.V Great minds 😉 $ATY.V reminds me of $CERT.V a while back: ✔️ Coming off a near bankruptcy event ✔️ Producing mine ✔️ Exploration potential ✔️ Development project awaiting permit
1
1
282
The biggest risk for Minnova $MCI.V has always been financing risk. This has been significantly diminished with #gold 3x higher from the 2017 FS - transforming the economics of PL. ✔️ 40-50koz Au production ✔️ Permitted ✔️ Existing Infrastructure $MCI presents incredible value.
Minnova's $MCI.V 2017 Mine Plan only included reserves of 259koz, excluding 301koz inferred resources These reserves + resources were based on a $1,250/oz #gold price. The new mine plan shall use $2,500/oz Integrating current drilling, reserves + mine life are likely to double
2
4
718