Ishanu Chatterjee🇮🇳 retweeted
Please note, these 54 lakh post restrictions are from Jan–June 2026 alone. Nearly 30,000 EVERY DAY!
In July, Modi ji summoned Meta's global leadership.
We estimate restrictions have since surged nearly 10-fold. That could mean 2–3 CRORE restrictions, nearly 2–3 LAKH daily.
BJP KA BETA - @Meta,
RELEASE FRESH DATA!
Meta’s India content restrictions jump 131-fold to 5.44 million in first half of 2026
hindustantimes.com/india-new…
Ishanu Chatterjee🇮🇳 retweeted
Leader of the Opposition @RahulGandhi called out the government on 2 February 2022.
“You have brought Pakistan and China together, and this is the single biggest crime that you could commit against the people of India.”
Four years later, a US panel report on Operation Sindoor flags the China-Pakistan nexus.
The report states: “China’s military aid to Pakistan strengthened Pakistan during the crisis. The two-front threat is growing for India.”
The China-Pak nexus has been red-flagged by two senior Indian Army officials as well.
• The Modi govt will stay mum on this
• The media will observe pin-drop silence
But the country has paid a price each time Rahul Gandhi’s warnings have been ignored.
Ishanu Chatterjee🇮🇳 retweeted
This one points to a possible rigging in 2024.
The first two parts of this path breaking investigation exposed grave lapses and errors in the ECI’s record keeping. This third story signals the possibility of rigging. Such massive mismatch between post 6 pm polling figures for assembly and Lok Sabha elections (held simultaneously in AP) is impossible to explain. Prabhakar Parkala has been drawing our attention to late voting fraud in AP. This proves him right.
In the Chittoor parliamentary seat, in 2024, the ECI’s internal records counted 56,067 voters polling at 6 pm. For the seven assembly seats that make up Chittoor, they counted only 24,596. the ECI never looked into the gap of more than 31,000 voters.
@TweetSumedha explains.
Ishanu Chatterjee🇮🇳 retweeted
In the Chittoor parliamentary seat, of CM Naidu, the ECI’s internal records counted 56,067 voters polling at 6 pm. For the seven assembly seats that make up Chittoor, they counted only 24,596. In a violence-hit election, the commission never looked into the gap of more than 31,000
Exclusive: ECI’s internal records show that for N Chandrababu Naidu’s 2024 Win, the ECI recorded an impossibility after 6 pm and did not investigate.
This is the third part of our Election Audit series.
1/7
reporters-collective.in/elec…
Ishanu Chatterjee🇮🇳 retweeted
Exclusive: ECI’s internal records show that for N Chandrababu Naidu’s 2024 Win, the ECI recorded an impossibility after 6 pm and did not investigate.
This is the third part of our Election Audit series.
1/7
reporters-collective.in/elec…
Ishanu Chatterjee🇮🇳 retweeted
Yes guys, please trust Eminent Economists like @rishibagree
But, also check the basic data once:-
Since Sept 2024: (when I advised folks to go overweight US stocks over Indian stocks)
- QQQ returns are + 25.4%
- Indian market returns are still negative
- US Market made multiple highs during this time. Indian has not even cut its previous peak.
Surprisingly, people like him would still use American platforms like X, Google, Facebook.
But, would make "investing" in American stocks some kind of anti-national issue.
Ishanu Chatterjee🇮🇳 retweeted
PRESS RELEASE
FOR IMMEDIATE RELEASE
“ADANI HAI TOH MUMKIN HAI!”
(INVESTIGATIVE SERIES: PART 1)
₹500 Stamp Duty on a 50-Year Airport Concession? Records Raise Questions Over Land Worth ₹3,566 Crore in the Adani–AAI Deal
newdelhipost.co.in/adani-hai…
NEW DELHI, INDIA | 22 November 2026
A 50-year airport concession agreement involving land valued at more than ₹3,566 crore. A stamp duty payment of just ₹500. Two official assessments raising questions about the applicable stamp duty. And a significant discrepancy between the land area recorded in the airport concession agreement and the area subsequently examined by state stamp authorities.
An investigation by NEW DELHI POST has brought these issues into focus in its first instalment of a wider investigative series examining the transfer of airport operations and development rights to companies associated with the Adani Group under India's airport privatisation programme.
The investigation examines six airports awarded to Adani Group entities under the public-private partnership (PPP) model: Lucknow, Ahmedabad, Jaipur, Guwahati, Mangaluru and Thiruvananthapuram. The airports were handed over between 2020 and 2021 under long-term concession arrangements.
Part 1 focuses on the concession agreement for Chaudhary Charan Singh International Airport, Lucknow — and the questions raised by official documents concerning stamp duty, land ownership, registration and development rights.
THE ₹500 QUESTION: A 50-YEAR CONCESSION AGREEMENT
On 14 February 2020, the Airports Authority of India (AAI) entered into a 50-year Concession Agreement with Adani Lucknow International Airport Limited for the operation, management and development of Lucknow Airport.
The agreement covers an airport land area of 1,258.80 acres, approximately 509.425 hectares, as recorded in Schedule A.
The original e-stamp certificate classifies the instrument under Article 5 – General Agreement. The property description is recorded as “Not Applicable”, the consideration is shown as zero, and the stamp duty paid is ₹500.
The agreement, however, is not merely an ordinary operational arrangement. Its provisions include rights relating to the airport land and commercial development. Clause 10.2.3 provides for lease rights over designated airport land, while Article 28 deals with City Side Development rights.
This raises a fundamental question: Was the instrument appropriately classified and stamped, considering the nature and duration of the rights granted under the agreement?
STAMP AUTHORITIES FLAGGED POSSIBLE DUTY SHORTFALL
Documents examined by NEW DELHI POST include reports and correspondence issued by officials of the Uttar Pradesh Stamp Department in 2022.
In a report dated 26 May 2022, the Assistant Commissioner of Stamps (First), Lucknow, recorded that the instrument transferring rights to operate and manage the airport had not been registered at the Sub-Registrar's office. The report also stated that officials, accompanied by the Sub-Registrar of Sarojini Nagar, visited the airport on 25 May 2022 and sought relevant documents, which were not provided to them by the airport management.
The report raised questions about the transfer of rights for a period of 50 years without the required registration and examination under the applicable stamp law.
A subsequent report dated 4 June 2022 assessed the relevant initial aeronautical asset value at approximately ₹143 crore and initial non-aeronautical investment at around ₹19 lakh, placing the combined figure at approximately ₹143.19 crore. It also referred to a performance security of ₹125 crore.
On the basis of its prima facie assessment, the Stamp Department calculated a potential stamp-duty liability of ₹10,02,33,000. Against the ₹500 already paid, the reported shortfall was ₹10,02,32,500.
The report recommended further proceedings, including examination of the market value of airport land, buildings, constructions and other assets.
On 18 July 2022, the Additional Commissioner of Stamps, Prayagraj, directed the Assistant Commissioner of Stamps, Lucknow, to initiate proceedings under Section 33 of the Indian Stamp Act, 1899. The correspondence described the instrument as being in the nature of a lease deed and referred to the applicable provisions governing leases exceeding 30 years.
These were official departmental assessments and directions for further proceedings. They should not be read as a final judicial determination of liability.
LAND VALUED AT ₹3,566.07 CRORE — AND A MAJOR DISCREPANCY IN THE RECORDS
A supplementary valuation report dated 6 August 2022, prepared by the Assistant Commissioner of Stamps and the Sub-Registrar, Sarojini Nagar, examined a substantially larger land area of 1,018.835 hectares.
The report referred to approximately 1,200 Gata numbers spread across eight villages: Amausi, Farrukhabad, Chillawan, Behsa, Ibrahim-pur, Bhitakheda, Gudaura and Rahimabad.
Using the applicable circle rates, the report estimated the market value of the land at ₹3,566.07 crore and calculated a prima facie stamp-duty shortfall of approximately ₹249.63 crore. The valuation of buildings, constructions and other assets was still pending and was identified as requiring further examination.
The figures raise a crucial documentary question.
Schedule A of the AAI–Adani concession agreement records a total area of 509.425 hectares. The supplementary stamp valuation report, however, refers to 1,018.835 hectares.
The difference is approximately 509.410 hectares — almost equal to the entire land area recorded in Schedule A.
This discrepancy requires a clear explanation. Does it reflect a clerical or mathematical error, a difference in the scope of the two exercises, or the inclusion of additional land whose ownership and legal status require separate examination?
The Schedule A land classification itself records:
AAI-owned land: 385.250 hectares
Land classified as “Not Recognized Land”: 92.735 hectares
Uttar Pradesh Government-owned land: 31.440 hectares
The classification raises further questions about the legal basis on which land not recorded as AAI-owned was included in the concession area and the extent of the rights granted over it.
The supplementary valuation report also refers to Central Government land and Uttar Pradesh Government land. The ownership records, permissions and legal authority relating to the inclusion of such land in a 50-year concession require transparent clarification.
Who owned each parcel of land? Which authority had the legal power to permit its inclusion? Were the relevant ownership documents and permissions examined before the concession rights were granted?
These are not merely technical questions. They go to the heart of public land administration, the valuation of public assets and the terms on which long-term commercial rights are transferred.
THE AEROCITY AND COMMERCIAL DEVELOPMENT QUESTION
The concession framework also provides for City Side Development, raising questions about the commercial use of land associated with the airport.
NEW DELHI POST examined correspondence concerning the preparation of Master Plans for certain airports.
The material reviewed refers to Master Plan preparation, but does not, by itself, establish that a specific Aerocity project, transfer of commercial land or separate real-estate development rights were expressly approved by the authority concerned.
The distinction is important.
Does the preparation of an airport Master Plan, on its own, amount to approval for an Aerocity or large-scale real-estate development? What specific permissions, land-use approvals and ownership clearances were obtained for commercial development?
The documentary record must be examined in its entirety before any definitive conclusion can be drawn.
ADANI GROUP'S RESPONSE: AGREEMENTS VALID, LAND REMAINS WITH AAI
NEW DELHI POST sent a detailed questionnaire to the Adani Group seeking its response to the findings and questions arising from the documents.
In its written response, sent on behalf of an Adani spokesperson by Mitul Thakkar, the Group stated that Adani Airport Holdings Limited (AAHL) was not a party to the individual Concession Agreements. It said that AAI had conducted an open and competitive bidding process and entered into airport-specific agreements with the respective concessionaire companies under a standard contractual framework.
The Group maintained that stamp duty and registration matters were handled by the concessionaires before the competent authorities in accordance with applicable law. It declined to comment on figures attributed to unnamed sources without adequate basis, authenticity and context.
On land ownership, the Group stated that the airport land and assets were identified and handed over by AAI, that ownership continued to vest with AAI, and that the concessionaires' rights were limited to the purposes and duration of the agreements. It further stated that the assets would revert to AAI at the end of the concession period.
Regarding City Side Development, the Group said that such development was expressly contemplated under the concession framework and restricted to earmarked land.
The Group also stated that the agreements remained valid and in force, that the concessionaires would abide by the outcome of proceedings before the competent authorities, and that certain contractual and business records were commercially confidential. It noted that the Concession Agreements with AAI were publicly available.
The Group further said that some related matters were pending before courts or competent authorities and cautioned against presenting unsubstantiated allegations as established facts. It requested publication of its response in full.
NEW DELHI POST has considered the response while preparing this report. The Group's position is presented here alongside the documentary questions raised by the investigation. The publication's editorial assessment remains independent.
QUESTIONS THAT REQUIRE ANSWERS
The documents examined for this investigation leave several important questions requiring clarification from the concerned public authorities and the parties to the concession:
Stamp duty and registration: Why was ₹500 paid on the original e-stamp certificate for a 50-year concession agreement involving extensive operational, land and commercial development rights?
What was the legal basis for the classification and registration treatment?
Land area: Why does Schedule A record 509.425 hectares, while the supplementary stamp valuation report refers to 1,018.835 hectares?
Ownership: What was the parcel-wise ownership status of the land included in the concession area, particularly land classified as “Not Recognized Land” and land recorded as belonging to the Central Government or the Uttar Pradesh Government?
Permissions: Which authorities granted the necessary permissions for the inclusion and use of Central Government and State Government land under the concession arrangement?
Valuation: How were the land, buildings, constructions and other assets valued? Were all relevant assets and land parcels included in the valuation exercise?
Commercial development: What specific approvals govern City Side Development and any proposed Aerocity or real-estate development, and what land parcels are covered by those approvals?
Public revenue: What action, if any, has followed the Stamp Department's reported assessments and directions for proceedings? Has the potential stamp-duty shortfall been finally determined by a competent authority?
These questions concern the handling of public assets, the transparency of long-term infrastructure concessions and the protection of government revenue. They warrant clear, document-backed answers.
A THREE-PART INVESTIGATIVE SERIES
The Lucknow agreement is the starting point of a wider examination by NEW DELHI POST.
PART 1 — LUCKNOW AIRPORT: THE ₹500 STAMP DUTY QUESTION
This instalment examines the 50-year concession agreement, the stamp-duty assessments, the land valuation report and the discrepancy in the recorded land area.
PART 2 — LAND, OWNERSHIP AND THE PAPER TRAIL
The next instalment will examine the ownership records, land parcels, government permissions and the process through which land was brought within the airport concession framework.
PART 3 — THE SIX-AIRPORT QUESTION
The investigation will widen its focus to the six airports awarded to Adani Group entities, examining whether similar contractual, land-related, stamp-duty and development issues arise across the concession agreements.
The objective is to establish what the official records show, what remains unexplained and which authorities are responsible for providing answers.
ABOUT THE INVESTIGATION
“ADANI HAI TOH MUMKIN HAI!” — THE AAI–ADANI AIRPORT DEAL EXPOSED is an investigative series by NEW DELHI POST examining the public-private partnership arrangements involving six airports awarded to Adani Group entities.
The investigation is based on official documents, concession agreements, stamp department reports, valuation records and the written response received from the Adani Group.
The publication recognises that assessments by administrative authorities are not equivalent to final judicial findings. All allegations and disputed matters are presented with appropriate attribution, and the responses of the parties concerned are taken into account.
NEW DELHI POST is an India-based print and digital news publication covering politics, economy, banking, insurance, public policy and investigative journalism.
ISSUED BY
K. ASHISH
Editor-in-Chief
NEW DELHI POST
Print & Digital News Publication
India
Investigative Series: ADANI HAI TOH MUMKIN HAI!
Part 1: THE AAI–ADANI AIRPORT DEAL EXPOSED
Ishanu Chatterjee🇮🇳 retweeted
ECI’s internal records show that for N Chandrababu’s win in 2024, the ECI recorded an impossibility after 6PM. Then did not investigate.
@VenkateshNSS and I report for @reporters_co.
In the third part of our election audit series, we take the audit to Andhra Pradesh -
reporters-collective.in/elec…
Ishanu Chatterjee🇮🇳 retweeted
Multiple reports this week provide further evidence of Vote Chori, which is now even more of an established fact.
The Opposition has previously raised the issue of the suspicious jump in turnout post-5 pm and the discrepancy between turnout reported on polling day and afterwards.
An investigation has revealed that ECI's internal records are missing on voters who voted after 5 pm in 200 seats in Maharashtra, Haryana and J&K in 2024. The Returning Officer’s Reports contain no figures for the final hour of polling. The number of votes polled are supposed to be tallied every 2 hours to prevent manipulation. But this was not done.
These late evening votes have already been suspect for bogus voting: in Maharashtra, the final turnout was 76 lakh votes higher than reported at 5pm. How is this possible? In one assembly Kopri-Pachpakhadi, it means one vote was cast every 15 seconds at each booth for a full hour.
The Modi-Shah duo through CEC Gyanesh Kumar have destroyed the credibility of India’s elections. They must be held accountable for this grave crime against our democracy. The CEC must resign and the duo must answer for Vote Chori.
Ishanu Chatterjee🇮🇳 retweeted
Dear Leader of Opposition,
Look at the Rajasthan local body results: conducted on standalone EVMs with NO VVPAT, Congress won 27 of 37 Zila Parishads.
This proves the exact vulnerability I flagged in my earlier post—removing the VVPAT removes the programmable middle layer and Symbol Loading Unit (SLU) that compromises EVM integrity.
Please review my detailed technical proposal below on why demanding the complete removal of VVPATs is the real solution. 👇👇👇
@RahulGandhi @priyankagandhi @INCIndia @Pawankhera @SupriyaShrinate
A BULLETPROOF SOLUTION TO THE EVM MANIPULATION: MOVING BEYOND JUDICIAL RHETORIC.
Dear Leader of the Opposition,
After watching your latest press conference, it is clear that you believe the ECI relies on two primary mechanisms to alter outcomes: EVM Manipulation and Vote Theft (via voter additions & deletions). While your extensive work on voter roll discrepancies (through SIR & previous implementations) has made significant progress, a concrete strategy on EVM manipulation remains pending.
The proposal detailed below provides a simple, unassailable solution to the EVM issue, one that neither the ECI nor the Supreme Court (SC) can easily dismiss, particularly in light of the recent Indian Express exposes. I urge you to review these details with your technical team.
THE JUDICIAL STALEMATE :
Historically, when citizens and opposition parties approach the judiciary, the ECI shields itself behind institutional rhetoric, which the Supreme Court consistently accepts. Over the last 12 years, 10 major PILs have challenged the system across three distinct categories:
👉Return to traditional paper ballots: Requesting a complete reversal to manual voting.
👉Increased VVPAT cross verification: Demanding manual counts of 50% to 100% of paper slips.
👉Technical and software integrity claims: Seeking independent source code audits.
In response, the Supreme Court has repeatedly maintained that blind suspicion cannot replace evidence, declaring that a healthy democracy requires nurturing trust in the ECI's technological integrity rather than undermining it with unfounded skepticism.
Current Status : Any PIL in above mentioned categories won't be entertained by SC.
The Solution: Turning SC’s Logic Against the System
We can leverage the Supreme Court's own emphasis on "absolute faith" to dismantle the current compromised architecture. The argument is straightforward:
👉 The Cost of Contradiction: If the judiciary and the ECI demand absolute, unquestioning faith in the digital integrity of the standalone EVM, why is the exchequer spending 16,000 crores on VVPAT infrastructure?
👉 Eliminating the Vulnerability: If the system is flawless, we must eliminate the VVPAT entirely. The 2013 Subramanian Swamy mandate that introduced the VVPAT effectively compromised the EVM's secure, standalone architecture by forcing it to interface with external software and Symbol Loading Units (SLUs).
THE ACTION PLAN :
I urge you to file a decisive PIL for the nation. The petition should demand the total removal of the VVPAT system based on the court's own standard of institutional trust. By forcing the system to return to a genuinely disconnected, standalone state or exposing the logical contradiction of keeping the VVPAT, we can break the current electoral impasse.
Please review the following technical breakdown with your team to finalize.
HOW VVPAT REMOVAL RESTORES INTEGRITY:
For over two decades, the definitive defense of India’s EVM architecture was its absolute standalone, air-gapped status. In the M1 and M2 generations, these devices functioned as hardwired, candidate agnostic state machines. They operated with no operating system, zero network capabilities, and no non volatile flash memory for external file transfers. The Balloting Unit (BU) was a purely mechanical switchboard, while the Control Unit (CU) acted as an isolated pulse-logging counter.
The introduction of the M3 generation and the Voter Verifiable Paper Audit Trail (VVPAT) permanently fractured this immutable hardware model.
1. The Deconstruction of the Standalone Architecture
The contemporary M3 EVM deployment is no longer a pristine, unalterable hardware loop. Its current design mandates a digital data-interfacing phase prior to every election cycle, introducing two structural vulnerabilities:
👉The Intermediary Bus: The VVPAT is physically inserted as a programmable middle-layer between the input interface (BU) and the registry core (CU) using serial cables:
BU———>VVPAT [Programmable]————> CU
👉The Flash Memory Ingress: Unlike the static logic boards of the legacy BU and CU, the VVPAT features programmable flash memory.
👉The External Symbol-Loading Link: Exactly 14 days before an election, once the final candidate list is locked, external binary data must be injected into the system. Engineers connect a Symbol Loading Unit (SLU) via a laptop to the VVPAT to upload bitmap graphics containing candidate names and symbols. This creates a digital entry point into an otherwise hardwired system.
2. The Asymmetric VVPAT Vulnerability (The Firmware Mapping Attack)
Inserting a programmable device with flash memory into the data stream introduces the potential for a Man-in-the-Middle (MitM) or mapping manipulation exploit.
If unauthorized firmware alterations occur during the symbol-loading phase, the VVPAT processor can be instructed to fork a single physical button press into two conflicting commands:
👉To the VVPAT Display/Printer: Render the correct visual symbol matching the voter's physical selection, pacifying the citizen during their brief 7-second verification window.
👉To the Control Unit (CU): Intercept and alter the outgoing electronic pulse, registering a vote for an entirely different candidate index within the CU registry.
3. Why even a 100% VVPAT Recounting will Fail To Validate a Rigged System
A popular counter-proposal demands a 100% manual recount of physical VVPAT paper slips against electronic CU totals. From a secure systems perspective, a 100% tally match does not prove system integrity if the exploit uses conditional execution triggers:
👉Time-Locked / Count-Locked Logic : Malicious code can be programmed to remain dormant during mock polls (e.g., bypassing the first 50-100 test votes) and activate exclusively after crossing a specific vote threshold or during active voting hours.
👉The Visual Blind Spot: If a firmware mapping attack occurs successfully at the point of data routing, the printed paper trail and the electronic CU record are altered simultaneously.
👉Synchronization Fallacy: If the compromised intermediary instructs the system to print a vote for Candidate B while transmitting a log for Candidate B to the CU, despite the voter having pressed the button for Candidate A, both the physical box and the digital registry will match perfectly. A 100% manual recount will simply validate and legitimize a corrupted vote.
4. The Engineering Remedy: Collapsing the Attack Surface via VVPAT Removal
From a hardware security engineering standpoint, the most definitive method to eliminate these structural vectors is to completely remove the VVPAT and return to a pure, candidate-agnostic M2-style architecture:
👉Eliminating the Ingress Point: Removing the VVPAT entirely eliminates the need for flash memory and external symbol loading via the SLU. The infrastructure reverts to a zero-file-system, hardwired loop where components contain no candidate data.
👉Removing the Digital Intermediary: Without a programmable device sitting between the input and the registry, there is no digital bus available to intercept, manipulate, or re-route electronic pulses.
👉Restoring Verifiable Simplicity: While removing the VVPAT eliminates the paper slip, it simultaneously eradicates the very digital interface that introduced systemic vulnerability, restoring the unalterable, non-networked state-machine architecture that made early Indian EVMs resilient.
@RahulGandhi @priyankagandhi @DrAMSinghvi @Pawankhera @srivatsayb @INCIndia
#FIX_EVM #ELECTION #REMOVE_VVPAT
Ishanu Chatterjee🇮🇳 retweeted
The deeper I go into Indian spiritual and religious traditions, the clearer it becomes.
The BJP and RSS are uncouth, greedy, casteist male chauvinists with absolutely no understanding of our spiritual and religious traditions.
Ishanu Chatterjee🇮🇳 retweeted
.@KirenRijiju ji,
Has Rahul Ji been giving, you all such sleepless nights that you were forced to post such a random, rhetorical ramblng of thoughts at 1:46 am at night?
Perhaps a little knowledge of history would have saved you the trouble. But I am here with some facts for you, my good brother and ever-charming Rijiju Ji.
1️⃣On China’s occupation of Nakhu
You are right that your village, Nakhu, was briefly occupied by China in October 1962. But the occupation ended in November, amid growing international pressure built by India through diplomatic efforts.
But why didn’t you quote it? Is it because it doesn’t fit your shallow narrative?
2️⃣Congress kept India poor?
Between Independence and 1977, India's nominal GDP grew from roughly $20–30 billion to $121.49 billion. Congress laid the foundations for the Green Revolution, the White Revolution, and the country's technological and industrial progress.
It built PSUs, IITs, IIMs, AIIMS, JNU and several other premier institutions — many of which the BJP is busy undermining today.
So, what you dismiss as keeping India poor was, in fact, nation-building.
3️⃣The 'land of snake charmers' jibe
We are not offended by an old colonial stereotype rooted in Western depictions of India. Nor do we need a white man's validation to define our identity, culture or civilisation.
But you in the BJP seem perpetually anxious about what foreigners think. Is it because the Sangh is still besotted with the British, the way they were during colonial rule?
4️⃣And finally, the ‘Hindu rate of growth”
It is essentially a repeat of question two. But Rijiju Ji, apparently unfamiliar with the basics of economics (and much else), seems to think they are two different questions.
But, it is understandable. Are you auditioning to become the BJP's Chief Snake-Charmer, hoping to earn a little extra favour from Modi?
Ishanu Chatterjee🇮🇳 retweeted
आदरणीय प्रधानमंत्री जी,
इस प्रॉजेक्ट के लिए केंद्र सरकार की ओर से एक पैसा भी नहीं दिया गया है।
इस पुल का उद्घाटन 1 साल 5 महीने पहले तत्कालीन मुख्यमंत्री श्री नीतीश कुमार ने किया था।
यह पुल पिछले 17 महीनों से चालू है और यहाँ विगत एक साल 5 महीनों में लाखों वाहनों की आवाजाही हो चुकी है। क्या आप इसका दोबारा उद्घाटन इसलिए कर रहे है कि शिलापट्ट पर आपका भी नाम लिखा जा सके, वह भी तब, जब इसमें केंद्र सरकार का कहीं कोई योगदान ही नहीं है?
बिहार सरकार के अनुसार, इस पुल का नाम या तो स्वतंत्रता सेनानी स्व॰ अक्षयवट राय जी के नाम पर रखा जाना था या फिर दशम गुरु गोविंद सिंह जी के नाम पर, क्योंकि यह गुरु महाराज जी की जन्मस्थली के पास ही स्थित है।
इसलिए कृपया इस प्रॉजेक्ट का श्रेय लेने की कोशिश न करें और बिना वजह खुद का महिमामंडन करने से बचें क्योंकि इस सेतु के निर्णय और निर्माण में आपका कोई योगदान नहीं है।
Ishanu Chatterjee🇮🇳 retweeted
Colleague @sharatjpr details what has been a spectacular day at the hustings for the Congress.
Ishanu Chatterjee🇮🇳 retweeted
पटियाला में भाखड़ा नहर पर बना लोहे का पुल टूट गया
NHAI ने यह पुल 2016 में बनाया था. 100 साल चलने का दावा था - 10 साल में ढह गया
जिस नेहरू को मोदी याद करते नहीं थके - उन्होंने 1963 में भाखरा नांगल बांध बनाया था जो आज भी अडिग खड़ा है



























