London, England
Joined June 2009
📢 Big News: Romford Road Section H is OPEN! 🚲🚶‍♂️ We’ve officially hit a major milestone for a greener, safer neighborhood. Section H is now open, featuring dedicated improvements for: Pedestrians: Wider, safer walkways for a better walking experience.
1
6
16
1,024
Construction works of the Brownlow Road Walking and Cycling Route project have now been successfully completed. This project introduced significant improvements for people walking and cycling. Read the full story here: journeysandplaces.enfield.go…
5
6
11
1,331
MacLondon retweeted
Islington just released revised drawings for the new cycle crossing at Newington Green. A few slight tweaks from the plan at consultation. Overall looks good! Construction starts Nov 18.
5
4
1
25
2,619
The new access from Donkey Lane towards the A10 is finished, absolutely is much nicer than the previous railings there. And there are works on the other side of A10 along Oldbury Road/Brick Lane. It’s just the A10 crossing which isn’t great.
1
5
418
The lane from the playing fields with dropped kerb to road - so good!
1
1
6
322
The new cycle crossing on next to the Rio Cinema, will open very soon. As a result, vehicles will no longer be able to turn left from the A10 into Sandringham Rd, and only left turns from Sandringham Rd onto the A10 will be permitted (no right turns towards Stoke Newington).
1
21
2,763
MacLondon retweeted
Paving and striping going on right now at Kingsland Rd and Sandringham Rd. hopefully the new crossing will open soon. @MacLondon
1
1
7
410
It's a celebration day. The much maligned Deptford Church Street roundabout has been demolished in preparation for the new protected cycleway connecting Deptford Broadway to Cycleway 4.
5
1
55
4,145
Replying to @TfL
@TfL @SebDance The gates on cycleway C10 around Millwall stadium have been closed since Saturday - I believe because the club didn't reopen them after the game on Saturday. C10 is a commuter route, and I've seen lots of people turning round. When will they be reopened?
3
1
1
174
Replying to @MacLondon
@MacLondon new C18 branding on NCN21 apparently! facebook.com/share/p/anLbyXM…
1
1
105
🚲 Have your say on 'quiet' cycle routes proposed across Wandsworth. It would be brilliant to have these routes in place which follow side streets and parks to avoid busy roads. Have your say: wandsworthquietroutes.common…
1
8
1
10
2,352
Construction of phase one of the Enfield Town Liveable Neighbourhood project has begun! Key changes include a new public square at Little Park Gardens, new crossings, and a new path through Library Green. Works are set to finish by Nov 2024 @EnfieldCouncil letstalk.enfield.gov.uk/Enfi…
2
10
29
2,301
UPDATE: @ThamesWater #Greenway/#Cycleway22 closure pushed back to 2nd September to allow ramps to be widened & lighting to be installed. Hopefully this also buys @NewhamLondon time to make the diversion via Abbey Rd E15 kid-safe in time for new school year. We'll be watching. 🤞
Confirmation: @ThamesWater plan to close #Greenway/#Cycleway22 for 18 MONTHS(!) from 19 August. Even more worryingly, we haven't seen their proposed diversions yet. This will have a big impact on the community. We'll hold them to account: any diversion must be safe & inclusive.
1
4
15
1,787
Oh hey London cyclists. Big news, the new Holborn separated cycle lane is open, no more mixing with 4 lanes of traffic, thanks @CamdenCounci Huge improvement to one of the most dangerous cycle routes in London, lovely SuDS too, thx @AdamDKHarrison @London_Cycling @willnorman
77
100
30
869
98,889
We have released plans for a 17-mile loop around the borough to help encourage walking, cycling and wheeling. This helps towards our drive to be a net zero borough by 2042. Have your say on the plans by heading to ow.ly/5m3750SH9jr before 30 August
1
1
2
635
The new entrance to Stratford station has just opened
3
17
4
179
17,730
Taxi left turn and access now live:
Experimental changes at Old Jewry at the junction with Poultry/Cheapside will now be implemented from 5 July 2024 and not 28 June 2024. At the junction with Poultry/Cheapside the left turn will be restricted to taxis and cyclists only. This trial will begin on 5 July 2024:
6
16
34
12,579
🎊 Happy Friday… and a very happy Friday it is. The first stage of the Romford Road cycle track (eastbound from Water Lane to the Atherton Leisure Centre) is finally open! 🚲 Congrats to @NewhamLondon… now please let's crack on with the rest of #RomfordRoad 👷
6
8
2
44
9,415
Good news! Work resumes at Woolwich town centre upgrade fromthemurkydepths.co.uk/202…
5
20
2,408
To facilitate the ramp replacement works at Teddington Lock, we need to close the footbridges from 8pm on Fri 14 June until 6am on Mon 17 June. Hear more about this phase of works from @AlexanderEhmann and @GieslerPhil. Sign up to our mailing list ⬇️ orlo.uk/uMFZY
2
10
14
1,733