Metro coming? Check land acquisition first.
Notifications are out: Orange Line (ORR West) 130 parcels, Silver Line (Hosahalli–Kadabagere) 407 parcels, plus Pink and Purple line pockets.
Don't decide only because metro is coming: insights.talkinglands.com
1
455
Buying land near Bengaluru's Suburban Rail corridors?
3 of 4 lines have notified land, from Kanaka Line (189 parcels, 2.91 ha) to Mallige Line (152 parcels, final notification).
Notified doesn't mean acquired. Check your survey no.: insights.talkinglands.com
Buying land near Hoskote? Check the proposed roads first.
30 m, 45 m and 100 m roads are planned here. If your land is on the alignment, approvals can be rejected and the land stays frozen. A road nearby can lift value.
Check before you invest: insights.talkinglands.com
Own a plot on Bengaluru's outskirts? 4 new metro routes are proposed:
Bommasandra–Attibele
Silk Institute–Harohalli
Challaghatta–Bidadi
KR Puram–Hoskote
All still at feasibility stage. Proposal ≠ approval. Check the routes: insights.talkinglands.com
7
946
Stuck at Konanakunte Cross every day?
A ~1.5 km elevated corridor is proposed on Kanakapura Road by B-SMILE, and the tender has been revised.
Better connectivity can lift demand, but it's proposed, not built. See what's planned near you: insights.talkinglands.com
3
443
Waited since January to buy a flat near Dommasandra? That wait cost you ~16% more.
Why: BDA Special Development Zone, Wipro and RGA Tech Park nearby, the Hebbal–Sarjapura Metro awaiting approval, and Gunjur road going 2 to 4 lanes.
insights.talkinglands.com
5
796
Namma Metro Phase 3: 44.65 km, 31 elevated stations, along ORR West and Magadi Road.
Cabinet approval Aug 2024. Foundation stone Aug 2025. Revised design Sep 2026.
Approved, not built. Check how far your plot is from the line: insights.talkinglands.com
11
926
Road on YOUR land?
BMRDA's new road grid outside GBA limits links to state highways, PRR and STRR. Near Yelahanka, land in a road corridor must stay vacant and approvals can be rejected.
Check before you invest: insights.talkinglands.com
Bengaluru's 2041 Master Plan and new road grid are on the way.
Until it's notified, the current plan decides what you can build. Plots on 9 m+ roads could get +0.6 extra FAR; sites in a proposed road's path could lose land.
Check your zone and roads: insights.talkinglands.com
Where Bengaluru prices rose most in a year 📈
KR Puram +20%, Yelahanka +18%, Tumkur Rd +16%, Marathahalli +15%, Whitefield +14%. Sarjapur Rd just +3%. (Knight Frank, year to June 2026)
Metro + Ring Road layers
Check any area: insights.talkinglands.com/ap…
#Bengaluru #RealEstate
2
4
1,004
BDA e-auction is live: 138 sites, bidding 2-4 Nov 🏡
Anjanapura, Banashankari 6th Stage, JP Nagar 8th-9th Phase, Arkavathy. Before you bid, check the master plan zone around the site.
📍 Anjanapura | 12.8586, 77.5560
Master Plan layer
insights.talkinglands.com/ap…
#Bengaluru #BDA
3
523
Bengaluru bullet train update 🚄
Southern HSR network approved: Bengaluru–Chennai ~73 min, Bengaluru–Hyderabad ~2 hrs. Alignment still being finalised.
📍 Baiyappanahalli | 12.9907, 77.6525
High Speed Railway layer
insights.talkinglands.com/ap…
#Bengaluru
2
368
Bengaluru suburban rail update 🚆
₹1,282 Cr civil works awarded on Mallige (C-2) & Kanaka (C-4) lines. Kanaka Pkg 1: Benniganahalli–Jakkur via Hennur; Pkg 2: Heelalige–Bellandur.
📍 Hennur | 13.0320, 77.6450
Sub-Urban Rail layer
insights.talkinglands.com/ap…
#Bengaluru
Rain in Bengaluru till Wednesday. Here's where the water goes 🌧️
Rajakaluves are storm-water drains with buffers of 15 m, 10 m and 5 m. Bellandur-Varthur, mapped.
📍 12.9365, 77.6922
Rajakaluve + Lake Buffer layers
Check any land: insights.talkinglands.com/ap…
#Bengaluru
1
6
925
Shivaram Karanth Layout: registrations closed 🏡
14,639 registered, 9,150 applications complete. Final submission still open for those who paid on time.
📍 Doddabettahalli | 13.0950, 77.5600
See the full layout boundary on satellite:
insights.talkinglands.com/ap…
#Bengaluru
Bengaluru Business Corridor (PRR-1) is moving 🛣️
Final notifications out for ~600 more acres at 4 junctions: Tumakuru Rd, Airport Rd, Old Madras Rd, Hosur Rd. Payouts targeted by Dec.
📍 13.1238, 77.5851
Ring Road + Notified Lands layers
insights.talkinglands.com/ap…
#Bengaluru
🏘️ 65 urbanised gram panchayats just outside GBA limits are set to become urban local bodies, with water and sewerage in phases. The list isn't out yet.
Is your village inside GBA or just outside?
talkinglands.pages.dev/x
#GBA #Bengaluru #RealEstate
🌊 Roads in lake buffers? GBA is surveying a ~1 km, 24 m road in Bellandur Lake's buffer, and lake groups are pushing back.
Check any lake's buffer and rajakaluve on the map:
talkinglands.pages.dev/x
#Bellandur #BengaluruLakes #GBA
5
594
🛣️ ₹1 lakh crore over 10 years: Bengaluru's proposed road push.
• 500 km of new roads, incl. 300 km buffer roads along drains
• 120 km elevated corridors
• 40 km tunnel corridors
Check your area on the map:
talkinglands.pages.dev/x
#Bengaluru #Infrastructure
6
1,555
🏷️ BDA is auctioning 138 sites across Bengaluru. Express interest by 31 Oct, 5 PM; bidding runs 2–4 Nov.
💰 Base rates ₹65,000–₹1,40,000/sq m
🔒 EMD ₹4 lakh per site
Check the zoning around any site first:
talkinglands.pages.dev/x
#BDA #Bengaluru #eAuction
8
962











