TalkingLands retweeted
✈️ How could Chennai Airport’s access change in the future?
AAI has submitted a DPR for a proposed rear-access road across the Adyar River, reports DT Next.
📍 Explore airport connectivity, water bodies + flood indicators:
bit.ly/4ArS008
#Chennai #TalkingLands #TVK
TalkingLands retweeted
🚇 What’s taking shape beneath Chennai?
CMRL confirms TBM “Adyar” broke through at RK Salai on Phase-II Corridor 3.
📍 Explore Royapettah–RK Salai:
Search location → Connectivity → Metro.
bit.ly/4ArS008
#ChennaiMetro #TalkingLands
TalkingLands retweeted
🚇 Hyderabad Metro Phase-I’s takeover deadline has reportedly moved to 31 Dec 2026 amid financing hurdles.
📍 Raidurg shown on TalkingLands Insights as an existing-network reference—not a new route.
bit.ly/4ArS008
Source: The Hindu, Oct 6.
#HyderabadMetro #Hyderabad
TalkingLands retweeted
📍 A location is more than its road connections.
Explore Hoodi’s mapped water bodies, drainage + risk layers on TalkingLands Insights.
Search Hoodi → Risk & Utility → Look beyond connectivity.
bit.ly/4ArS008
#Bengaluru #TalkingLands
TalkingLands retweeted
🚇 What connects around Benniganahalli?
Explore the Blue Line, Purple Line, railway corridor + major roads together on TalkingLands Insights.
📍 Search Benniganahalli → Connectivity → Explore.
bit.ly/4ArS008
#Bengaluru #TalkingLands #Benniganahalli #NammaMetro
TalkingLands retweeted
🌳 Hyderabad’s KBR Park corridor debate deserves a closer look on the map today.
📍 Explore roads, Metro + environmental layers on TalkingLands Insights.
⚠️ Map context—not an approved project alignment.
bit.ly/4ArS008
#Hyderabad #KBRPark #RealEstate #TalkingLands
TalkingLands retweeted
🛣️ #CPRR: TNRDC has cancelled the tender for the final 27.34-km stretch of the 133-km Chennai Peripheral Ring Road — Singaperumal Koil (GST Rd) → Poonjeri (ECR). A re-tender likely follows.
Trace the alignment on TalkingLands Insights 🛰️
insights.talkinglands.com
#Chennai #ECR
TalkingLands retweeted
Buying land in Pune? Watch the invisible flood lines.
🔵 Blue Line = strict no-build zone.
🔴 Red Line = construction restrictions apply.
Hinjawadi, Wakad & Balewadi are affected. Don’t buy blindly—verify your plot’s flood risk first.
insights.talkinglands.com
#PuneRealEstate
TalkingLands retweeted
Purple & Aqua are operational. Pink & Orange are under construction. Loni Kalbhor & Saswad remain proposal.
Also, metro proximity ≠ buildable land. Verify PMRDA zoning before paying a token: insights.talkinglands.com
#PuneMetro #PMRDA #PuneRealEstate #TalkingLands











