KONG retweeted
I bought 60,000 shares of $IREN at $18.72.
$7.7B market cap. $5.8B of cash. $6B of owned data centers. $20.3B backlog. More than 5GW of secured power.
Here is why I think it is one of the most mispriced assets in AI infrastructure.
KONG retweeted
Some gems from the $IREN earnings call:
- “We are in a flexible situation to adjust to different market conditions. We are in full control. We can flex up, we can flex down. We can be patient.”
- “We are not going to grow at all costs. We don’t need to.”
- “Even if equities market would not recover, we see different ways to monetize the 5GW portfolio.”
- “We are not building in 20 years of colocation liabilities. We are building long term durable assets.”
- “We expect the $4bn ARR to be live in January.”
- “The demand has never been stronger.”
- “We signed a customer agreeing to pay 90% of GPU capex this week.”
- “We are upgrading the 200MW because Microsoft asked us for adjustments after we signed the contract.”
- “We have seen a shrinking of the payback period in the last months.”
@Agrippa_Inv @awilkinson @GavinSBaker @Umbisam
KONG retweeted
$IREN WILL BE ABLE TO COMPLETE ALL 2GW OF SWEETWATER
The governor-elect of Texas, Gina Hinojosa, has explicitly said that all currently permitted datacenters in Texas will be allowed to finish construction. This essentially covers all of the 2027 and likely well into 2028.
She is going to pass laws that ensure that all *newly* permitted datacenters going forward for delivery in 2028/2029 will pay taxes, commit to no increase in power prices for consumers, don’t impact water availability for people, be constructed with union labor and give “Texans a seat at the table.”
Sounds reasonable. She doesn’t want to lose a lot of good blue collar jobs and property taxes for small towns in rural Texas.
Datacenter commentary starts at 6:30 in this interview.
Also attaching her official campaign position from her website in the next post.
Sidenote: After watching a bunch of her speeches and interviews, I do think she is a political talent and probably has a future in national politics.
youtu.be/D-T6H3b8ZeE?is=mEWu…
KONG retweeted
$IREN the previous quarter and ER is likely the worst quarter the company will ever report. From here on out, Horizon is generating meaningful AI revenue. The next 6+ quarters at least will all show explosive growth, scaling from $1B run rate to $4B run rate exiting 2026. Then potentially ending next year with a $10B exit run rate. Meanwhile, margins are exploding and demand is increasing. This is about as good of a time as it gets to invest. We can't control macro or market sentiment. Those things come in waves. But in the next 3-6 months and beyond, at some point, the stars will align and this will explode. Still think we can hit $90+ EoY and upwards of $130 in 2027.
When sentiment is shit. They have executed exact as projected without a single notable setback I'm aware of. If that continues, the ramp from here to less than 18 months from now will be a $1B to a $10B ARR ramp. On top of that, iren has nearly 30% short interest keeping the price artificially low, on top of a 15% sell-off the day after earnings - which was also heavily influenced from Warshs speech in Jackson Hole. It can definitely still go lower in the coming weeks with macro, but it has a hell of a lot more upside than downside. Trust the process
KONG retweeted
Key highlights from $IREN earnings last night.
- Cost of MW increased from $20 million to $25 million 📈
- $IREN officially earned more revenue this quarter with AI Vs Bitcoin mining.
- $IREN dosent care about the big headline deals, the company is more focused on securing future MW’s
- CEO claims that $IREN is the only neocloud that is Nvidia certified
- Demand pretty much sold out for 2027/2028 🤯
Quarters like this scream pricing power and I expect the price of per MW to continue to rise on shorter term contracts 📈
$IREN Capex concerns addressed
1
6
467
KONG retweeted
Replying to @0xLouz
$27.5B FY27 capex midpoint
− $14B cash + committed financing/prepayments
− $8B targeted GPU financing/prepayments
= $5.5B residual
Mgmt says that residual will come from data-center financing, cash flow and corporate sources. Note that the data-center portfolio is now unencumbered, meaning those assets are available to borrow against.
$IREN Continues to Execute 🎯
• 2026 AI Cloud ARR raised to $4B+
(85% already contracted)
• Customers: Microsoft, NVIDIA, Perplexity, Figure AI, Together AI, Fireworks AI, Fal AI, Hume AI + a new leading AI developer
• Demand exceeds 2026 & 2027 capacity
• Customers prepay 45% of GPU CapEx
• Pricing continues to strengthen
• $7.6B cash to fuel continued expansion
Execution > hype
1
7
290
KONG retweeted
$IREN - Signs $2.8bn in new customer contracts with leading AI developers, raises 2026 ARR target to over $4bn.
Daniel Roberts, Co-Founder and Co-CEO of IREN, said:
“Our vertically integrated AI Cloud platform is scaling at pace. In the past 12 months we have expanded from approximately 3MW of self-built AI Cloud capacity to 480MW being delivered this year, with 1.2GW targeted for 2027, broadening our customer base across hyperscalers, enterprises and AI developers.”
“We are proud to support leading companies building frontier applications across design, physical AI and robotics, generative media, AI search and model development.”
IREN has announced a planned 800MW data center campus in Bundey, South Australia.
This marks IREN’s first announced Australian data center project and one of the largest in the Asia-Pacific region announced to date.
Learn more: iren.gcs-web.com/static-file…
KONG retweeted
$IREN
AFR article covering the new 800MW datacenter site in South Australia.
"Roberts said Iren had started talking to potential customers including big US cloud services companies and large language model owners."
Anthropic anyone? 😎🔥
KONG retweeted
$IREN CEO said company has spent eight years assembling the inputs for AI infrastructure, including 5GW of secured power & land across three continents.
He believes neocloud growth should be higher than ~60% CAGR but the industry simply cannot build fast enough to meet demand.
I still own $IREN because I think the market is underestimating both the $NVDA alignment and how hard its power footprint is to replicate.
If the company can turn ~5 GW of secured power into Nvidia-aligned AI cloud capacity then the market may start valuing the 10x gap between its power base and near-term AI cloud needs.
KONG retweeted
IREN’s $2.6B upsized offering effectively kills the narrative that the company needs to lean on ATMs to survive this growth phase. By netting $2.57B—nearly $3 billion if the greenshoe is exercised—IREN locked in 1% capital to fund its 5GW NVIDIA-aligned roadmap through the end of the decade. IREN is now a fully funded AI-infrastructure powerhouse.
Bullish AF.
But don't fade the structural resistance map.
Institutional hedging and the NVIDIA partnership now define these friction points:
• $70.00 (NVIDIA Warrants): 30M shares underlying NVIDIA warrants become in-the-money at this level. Market makers will front-run the potential $2.1 billion discretionary cash injection, creating intense volume spikes as the price approaches this threshold.
• $73.07 (May '26 Conversion Price): The initial conversion price for the new $2.6B notes. Arbitrage funds are expected to sell shares to hedge their 1.00% coupon spread as the price nears this level.
• $82.24 (Dec '25 Capped Call): This legacy ceiling requires banks holding the counterparty position to unwind hedges. They will sell back the shares they previously purchased to stay neutral, creating a heavy supply of stock that drags the price down.
• $110.30 (May '26 Capped Call): The new ceiling. Option counterparties will defend this cap price—representing a 100% premium—by selling stock to offset their own potential cash obligations or dilution risks.
• $120.18 (Oct '25 Capped Call): The final $1.0B legacy wall. Final mechanical barrier before the stock enters a blue-sky zone.
IREN’s "AI Factory" roadmap is now fundamentally de-risked and backed by liquidity of about $9.3B. IREN investors can now focus on execution over Issuance. With $2.57B in the bank, IREN has zero immediate pressure to tap the open market for operational liquidity. Management can now focus entirely on the Sweetwater campus build-out and GPU cluster deployment.
KONG retweeted
🚨 @IREN_Ltd has had the most newsworthy 2 weeks in company history... but the market hasn't caught up...🚨
Here's everything that just happened:
⚡ May 1 — Sweetwater 1 energization confirmed — on schedule ✅
⚡ May 5 — Acquires Mirantis for $625M — 1,500+ enterprise customers, @NVIDIAAI Cloud Ready partner
⚡ May 7 — @nvidia and $IREN announce strategic partnership — $NVDA -aligned architecture across entire 5 GW global pipeline
⚡ May 7 — Expands AI Cloud to Europe — Nostrum acquisition adds 490 MW in Spain + GW+ development pipeline
⚡ May 7 — Q3 FY26 results + 5 GW strategic partnership with @nvidia — $2.1B investment option issued
⚡ May 7 — Secures $3.4B AI Cloud contract with $NVDA — 5-year deal for air-cooled Blackwell GPUs at Childress
⚡ May 11 — Announces proposed convertible notes offering — institutional demand overwhelms within 24 hours
⚡ May 12 — Prices upsized $2.6B convertible notes at 1% coupon — demand so strong the deal grew by $600M
8 press releases in 12 days
$9.7B Microsoft. $3.4B NVIDIA. $2.6B raised. 5 GW pipeline. Europe added. Enterprise software acquired.
Is $IREN the most important AI infrastructure story of 2026? 👇
$IREN $NVDA #AIInfrastructure #AICloud @
KONG retweeted
$IREN
I have a tweet in my drafts, that I've been working on periodically as I had time..... then @franklee6924T hit us with this gem that all but matches exactly what I was going to say, so instead, I'll let him say it for me. I will share a couple other thoughts.
- I believe NVDA is the "multi billion dollar deal with software" that Dan told us about 3 months ago.
- I believe NVDA catalyzed the acquisition of Mirantis by IREN. Dare I say, that I think NVDA arranged it.
- I believe the 60MW cluster for NVDA at Childress with the Mirantis software layer will used as the first real operating proof point for the larger DSX AI Factory plan.
It's not a coincidence that the Mirantis deal was announced two days before the the NVDA deals. It's not a coincidence that the 3.4B deal IREN PR explicitly names Mirantis.
The 3.4B contract is less about NVDA needing "managed services" from IREN and much more about proving that IREN x Mirantis x NVDA DSX works at scale.
IREN has arrived!
There is no larger long-term strategic move than this — NVIDIA joins forces with $IREN to build the flagship AI factory deployment for the DSX architecture
The market will continue to repeatedly reinterpret the deeper intent and long-term objectives behind the partnership between NVIDIA and IREN.
On May 7, 2026, IREN’s CEO reposted NVIDIA’s official announcement on X regarding the partnership between the two companies: NVIDIA and IREN Limited today announced a strategic partnership to accelerate the deployment of next-generation AI infrastructure.
NVIDIA announcement
nvidianews.nvidia.com/news/n…
At the same time, IREN also released another announcement on its own website: IREN signs a US$3.4 billion AI cloud services agreement with NVIDIA.
IREN announcement
iren.gcs-web.com/static-file…
The two announcements, each emphasizing different aspects of the cooperation, carry extremely significant implications.
First, after careful verification, this is the first time NVIDIA has sought external compute leasing. There are three major turning points in industry development embedded in this move.
A reversal of roles: NVIDIA becomes a “major external compute customer” for the first time
In the past, NVIDIA’s relationship with infrastructure companies was almost always centered around “selling hardware” or “borrowing hyperscaler data centers for DGX Cloud.” But in this US$3.4 billion agreement with IREN, NVIDIA is, for the first time in its history, leasing third-party compute capacity at large scale and on a long-term basis as a customer, for use by its own AI research teams. This kind of “reverse leasing” is unprecedented for NVIDIA in both scale and nature.
The selective external exposure of its most core secrets: this point carries the deepest implications
For a long time, NVIDIA has insisted on keeping its most critical R&D work — chip design, driver optimization, and large-model training — inside its self-built supercomputers such as Selene and Eos, creating a closed loop of “building the shovels and mining with them itself.” But this time, outsourcing a 60MW research workload to an external data center is highly significant. It signals that compute-chip R&D is beginning to transition toward external collaboration.
The first opening of stack management: introducing Mirantis to manage NVIDIA’s internal R&D clusters
Previously, NVIDIA’s internal cluster management was handled entirely by its own engineering teams. But under this agreement, NVIDIA is for the first time allowing third-party management, bringing in Mirantis to participate in cluster orchestration and operations. This also signals a transformation in NVIDIA’s latest compute architecture R&D approach — beginning to “strengthen external collaboration” for lower-level operational work such as server cooling, restarts, and Kubernetes configuration.
As the ability of individual GPU chips to increase computing performance gradually approaches physical and engineering limits, the next phase of AI compute advancement is shifting from “single-chip performance competition” to “system-level scalability competition.” This is NVIDIA’s direction of transformation.
The primary paths for the next stage of AI compute improvement include: GPU clustering, high-speed interconnects, rack-scale computing, and data-center-level coordination. This requires GPU manufacturers (NVIDIA), data center designers/builders/operators (IREN), and supercluster operating systems (Mirantis) to jointly collaborate on development.
What they are developing is precisely the NVIDIA DSX architecture referenced in the NVIDIA-IREN partnership announcement. And IREN’s hyperscale SW site in Texas is becoming the flagship deployment location for NVIDIA’s DSX architecture. This is absolutely not a simple narrative of NVIDIA investing in a company and becoming a shareholder.
For the world’s leading company that holds the core secrets of AI compute chip R&D, this is not a trivial matter.
From NVIDIA’s perspective, there appear to be many potential partners, such as CoreWeave, Nebius, Oracle, Microsoft Azure, Amazon Web Services, and Crusoe, and NVIDIA has already invested in or partnered with these firms before. But why did it choose IREN for this most important transformation?
Because IREN possesses too many things that are uniquely its own:
Multiple GW-scale single sites with secured long-term power supply
Grid interaction capabilities
Vertical integration
Ultra-long-term site planning and abundant land supply
Green energy
Acting as its own design-and-build general contractor
Long-term accumulation of data center operational experience
Advanced design and technical capabilities
Compared with the companies above that NVIDIA has already partnered with, even if IREN temporarily lacked software capabilities, NVIDIA was still willing to wait until IREN acquired a software company before announcing this deep cooperation. Moreover, Mirantis has long been one of the three software companies that have collaborated with NVIDIA for many years. It is highly possible that NVIDIA itself played the role of connector behind IREN’s acquisition.
NVIDIA is transforming toward system-level compute scaling and building an AI factory template. In the future, the products it sells may no longer simply be GPU chips, but complete racks, clusters, or even entire AI factories.
That inevitably requires standardized data centers in order to guarantee performance, compatibility, scalability, and token efficiency.
What NVIDIA needs are facilities with massive long-term secured power supply, land, GW-scale campuses, HPC DNA, rapid construction capability, neutrality, automated scheduling capability, workload routing, GPU virtualization, fault recovery, and cluster operating systems capable of distributed training management.
At present, IREN is the only company that possesses all of these elements simultaneously.
What they are trying to build is the industrial standard for the next phase of the AI industry.
The greatest companies do not merely participate in industries — they define the standards.
From this perspective, there is no larger strategic theme than this one.
Selling compute capacity to hyperscalers, partnering with Anthropic, or developing new sovereign AI businesses are all important, but none compare with this.
The deeper meaning of last week’s announcement will require time for the market to fully interpret and understand. I believe I have already analyzed this trend relatively clearly.
This move by NVIDIA and IREN, once executed successfully, could once again widen the gap between the NVIDIA ecosystem and Google just as Google had begun catching up — and it carries major implications for the entire AI industry.
KONG retweeted
There is no larger long-term strategic move than this — NVIDIA joins forces with $IREN to build the flagship AI factory deployment for the DSX architecture
The market will continue to repeatedly reinterpret the deeper intent and long-term objectives behind the partnership between NVIDIA and IREN.
On May 7, 2026, IREN’s CEO reposted NVIDIA’s official announcement on X regarding the partnership between the two companies: NVIDIA and IREN Limited today announced a strategic partnership to accelerate the deployment of next-generation AI infrastructure.
NVIDIA announcement
nvidianews.nvidia.com/news/n…
At the same time, IREN also released another announcement on its own website: IREN signs a US$3.4 billion AI cloud services agreement with NVIDIA.
IREN announcement
iren.gcs-web.com/static-file…
The two announcements, each emphasizing different aspects of the cooperation, carry extremely significant implications.
First, after careful verification, this is the first time NVIDIA has sought external compute leasing. There are three major turning points in industry development embedded in this move.
A reversal of roles: NVIDIA becomes a “major external compute customer” for the first time
In the past, NVIDIA’s relationship with infrastructure companies was almost always centered around “selling hardware” or “borrowing hyperscaler data centers for DGX Cloud.” But in this US$3.4 billion agreement with IREN, NVIDIA is, for the first time in its history, leasing third-party compute capacity at large scale and on a long-term basis as a customer, for use by its own AI research teams. This kind of “reverse leasing” is unprecedented for NVIDIA in both scale and nature.
The selective external exposure of its most core secrets: this point carries the deepest implications
For a long time, NVIDIA has insisted on keeping its most critical R&D work — chip design, driver optimization, and large-model training — inside its self-built supercomputers such as Selene and Eos, creating a closed loop of “building the shovels and mining with them itself.” But this time, outsourcing a 60MW research workload to an external data center is highly significant. It signals that compute-chip R&D is beginning to transition toward external collaboration.
The first opening of stack management: introducing Mirantis to manage NVIDIA’s internal R&D clusters
Previously, NVIDIA’s internal cluster management was handled entirely by its own engineering teams. But under this agreement, NVIDIA is for the first time allowing third-party management, bringing in Mirantis to participate in cluster orchestration and operations. This also signals a transformation in NVIDIA’s latest compute architecture R&D approach — beginning to “strengthen external collaboration” for lower-level operational work such as server cooling, restarts, and Kubernetes configuration.
As the ability of individual GPU chips to increase computing performance gradually approaches physical and engineering limits, the next phase of AI compute advancement is shifting from “single-chip performance competition” to “system-level scalability competition.” This is NVIDIA’s direction of transformation.
The primary paths for the next stage of AI compute improvement include: GPU clustering, high-speed interconnects, rack-scale computing, and data-center-level coordination. This requires GPU manufacturers (NVIDIA), data center designers/builders/operators (IREN), and supercluster operating systems (Mirantis) to jointly collaborate on development.
What they are developing is precisely the NVIDIA DSX architecture referenced in the NVIDIA-IREN partnership announcement. And IREN’s hyperscale SW site in Texas is becoming the flagship deployment location for NVIDIA’s DSX architecture. This is absolutely not a simple narrative of NVIDIA investing in a company and becoming a shareholder.
For the world’s leading company that holds the core secrets of AI compute chip R&D, this is not a trivial matter.
From NVIDIA’s perspective, there appear to be many potential partners, such as CoreWeave, Nebius, Oracle, Microsoft Azure, Amazon Web Services, and Crusoe, and NVIDIA has already invested in or partnered with these firms before. But why did it choose IREN for this most important transformation?
Because IREN possesses too many things that are uniquely its own:
Multiple GW-scale single sites with secured long-term power supply
Grid interaction capabilities
Vertical integration
Ultra-long-term site planning and abundant land supply
Green energy
Acting as its own design-and-build general contractor
Long-term accumulation of data center operational experience
Advanced design and technical capabilities
Compared with the companies above that NVIDIA has already partnered with, even if IREN temporarily lacked software capabilities, NVIDIA was still willing to wait until IREN acquired a software company before announcing this deep cooperation. Moreover, Mirantis has long been one of the three software companies that have collaborated with NVIDIA for many years. It is highly possible that NVIDIA itself played the role of connector behind IREN’s acquisition.
NVIDIA is transforming toward system-level compute scaling and building an AI factory template. In the future, the products it sells may no longer simply be GPU chips, but complete racks, clusters, or even entire AI factories.
That inevitably requires standardized data centers in order to guarantee performance, compatibility, scalability, and token efficiency.
What NVIDIA needs are facilities with massive long-term secured power supply, land, GW-scale campuses, HPC DNA, rapid construction capability, neutrality, automated scheduling capability, workload routing, GPU virtualization, fault recovery, and cluster operating systems capable of distributed training management.
At present, IREN is the only company that possesses all of these elements simultaneously.
What they are trying to build is the industrial standard for the next phase of the AI industry.
The greatest companies do not merely participate in industries — they define the standards.
From this perspective, there is no larger strategic theme than this one.
Selling compute capacity to hyperscalers, partnering with Anthropic, or developing new sovereign AI businesses are all important, but none compare with this.
The deeper meaning of last week’s announcement will require time for the market to fully interpret and understand. I believe I have already analyzed this trend relatively clearly.
This move by NVIDIA and IREN, once executed successfully, could once again widen the gap between the NVIDIA ecosystem and Google just as Google had begun catching up — and it carries major implications for the entire AI industry.


























