Photo by Brandt Vermillion (@b_vermill)Photo by Brandt Vermillion (@b_vermill)Photo by Brandt Vermillion (@b_vermill)Photo by Brandt Vermillion (@b_vermill)Photo by Brandt Vermillion (@b_vermill)Photo by Brandt Vermillion (@b_vermill)Photo by Brandt Vermillion (@b_vermill)Photo by Brandt Vermillion (@b_vermill)Photo by Brandt Vermillion (@b_vermill)Photo by Brandt Vermillion (@b_vermill)
Brandt Vermillion retweeted
I just finished getting through every document filed on @FERC's website related to the show cause (there were dozens)! Four ISOs propose a new class of non-firm transmission service, where a data center connects with the stipulation that it curtails under certain grid conditions. MISO, NYISO and ISONE would set those conditions with price thresholds: $100/MWh, $200/MWh and $250/MWh. FERC hasn’t accepted any of these filings yet, and I’d expect a lot to change. Full article here: modoenergy.com/research/en/f…
Who has the best summary so far of all the FERC show cause orders on large load interconnection?
1
9
2
68
13,268
Brandt Vermillion retweeted
this is probably a good indication that data center development won't come to a half...
JUST ANNOUNCED: Texas labor leader Ryan Pollock will serve as a co-chair of Gov.-elect Gina Hinojosa’s transition team! Texas labor is at the table and making moves — let’s go! ✊
2
12
197
18,125
Brandt Vermillion retweeted
I don't think data centers stop getting built. I think emboldened leaders demand: -No NDAs/Full process transparency -Paying full cost of infra/electric (and subsidizing everyone else's) -Actual consideration for quality of life concerns -Big $$ involvement in local communities And the builders will positively JUMP to agree to it all. New leaders deliver a win for everyone while being "tough on tech" and the whole system keep turning -- in a way that's frankly better and more sustainable.
33
20
6
184
21,109
We ran a session on the greater macro constraints on data center load growth and our view on what we think they can deliver in terms of grid demand last week - much of that still stands in the face of election results. Watch here: youtube.com/watch?v=01oVOKWE…
All we could talk about in the office yesterday was trying to read tea leaves on what various governor race results meant for our load forecasts across key ISOs like ERCOT, SPP, MISO, etc. Check out our article where we get into it in detail: modoenergy.com/research/en/u…
3
9
452
All we could talk about in the office yesterday was trying to read tea leaves on what various governor race results meant for our load forecasts across key ISOs like ERCOT, SPP, MISO, etc. Check out our article where we get into it in detail: modoenergy.com/research/en/u…
1
2
1
6
461
In summary, we think the results shift a % of the long run development in Texas (and a couple of other key states) to some other locales (thinking southern SPP and southern MISO primarily), but that the top line total data center capacity built doesn't change too much
1
1
2
100
It's essentially all still going to be constrained by capital and different supply chain elements. There will be enough well-capitalized, responsible project development that maxes out what the grid and other macro constraints can deliver, it's just a question of where it goes
1
39
ERCOT's firming requirements take effect from 2028 for new generators with IAs signed from 2027. Initial cost should be small with few resources obligated, but it will become a structural cost for new generation if low reserve margins return and the obligated pool grows
2
114
1/ Some volatility returned to ERCOT's Real-Time Market this week. Settlement prices peaked at $561/MWh on August 23 and $781/MWh on August 26, were in the mid-triple digit range for multiple hours each day, and settled above day-ahead in nearly every interval.
1
2
1
5
1,414
4/ What was specific to the 23rd was thermal outages. Dispatchable capacity on outage for that evening rose 3 GW after the day-ahead market closed, from 8 to 11 GW. ERCOT's 90th percentile expectation for August is just 8.5 GW, and their modeled maximum is 11.7 GW.
1
58
5/ Congestion was worse in RT than DA on both days. 12 constraints reached four-figure shadow prices on the 23rd and 20 on the 26th, and on the 26th, the Pawnee to Calaveras 345 kV constraint required GWs of re-dispatch, separating West from Houston by $200/MWh.
1
49
4/ What was specific to the 23rd was thermal outages. Dispatchable capacity on outage for that evening rose 3 GW after the day-ahead market closed, from 8 to 11 GW. ERCOT's 90th percentile expectation for August is just 8.5 GW, and their modeled maximum is 11.7 GW.
1
20
5/ Congestion was worse in real time than day-ahead had signalled on both days. 12 constraints reached four-figure shadow prices on the 23rd and 20 on the 26th, and the Pawnee to Calaveras 345 kV constraint required GWs of re-dispatch, separating West from Houston by $200/MWh.
16
It's a highly uncertain time in US power markets, and policy noise has made FTM grid-scale BESS harder and pricier to develop lately. But the long-run signal is intact: Li-ion pack prices have fallen from $1,200/kWh in 2010 to about $108 today. 🧵
1
5
2
12
1,476
But BESS development isn't the only variable in flux in power markets. Demand is moving too, even though headline load forecasts look inflated (as supported by Gov. Abbott's letter to the PUCT and ERCOT this week, New York's data center moratorium and PJM market design uncertainty). Despite headwinds for load growth, our ERCOT projection still indicates ~25% growth in observed peak demand by 2030, which is staggering for a grid operator.
1
2
113
To zoom back out, infra investments play out over 15-plus years, and volatile markets like ERCOT run in cycles. A pullback in BESS development met by serious load growth is the recipe for volatility, and the revenue that comes with it, returning toward the turn of the decade.
1
2
106