Carol Caul (@c_caul) header
Carol Caul (@c_caul) profile picture

Seeking justice. No dms or calls. Thanks.

Houston
Joined March 2012
Photo by Carol Caul (@c_caul)Photo by Carol Caul (@c_caul)Photo by Carol Caul (@c_caul)Photo by Carol Caul (@c_caul)Photo by Carol Caul (@c_caul)Photo by Carol Caul (@c_caul)Photo by Carol Caul (@c_caul)Photo by Carol Caul (@c_caul)Photo by Carol Caul (@c_caul)Photo by Carol Caul (@c_caul)
The Senate-passed Bipartisan American Affordability and Jobs Act of 2026 (BAAJA / S. 5653) and the Roll Back of Methane Regulations are two interrelated legal initiatives. 1.The Senate-passed Bipartisan American Affordability and Jobs Act of 2026 (BAAJA / S. 5653) does not replace the Natural Gas Act of 1938 (NGA) or FERC's core ratemaking and siting framework. Instead, BAAJA acts as a “cross-cutting” permitting and litigation overhaul that speeds up—and restricts challenges to—the federal and state approvals required to build natural gas pipelines, LNG infrastructure, and related energy projects. (References, below, to speeding up water reviews refers to CWA Section 401 studies and FERC related documentation (e.g. dredge and fill, nationwide 401 permits), not stand alone water permits for data centers. Please note the safeguards for ratemaking and data centers. 2.Clean Air Act Methane Regulations: Rolling Back Remaining Regulations for the Oil and Gas Industry. On March 12, 2025, the U.S. Environmental Protection Agency (EPA) announced that the agency is reconsidering the Biden administration’s regulations for the oil and gas industry under Section 111 of the Clean Air Act and Subpart W of the Greenhouse Gas Reporting Program. The latest step in that reconsideration came in the form of proposed regulatory revisions that were published in the Federal Register on Oct. 29, 2026. The fact sheet published by the EPA states in part that “The proposal is expected to deliver $45 billion in savings and unleash an estimated additional 210 million barrels of U.S. oil production and over 1.4 trillion cubic square feet of U.S. natural gas,” and an EPA fact sheet provides a summary of the timeline for the administration’s reconsideration of the Biden-era rules. Five Proposed Rule Changes spencerfane.com/insight/roll… Certain Well Sites: EPA is proposing two options to create separate categories and standards for well sites. The first option would categorize well sites by production level, marginal or non-marginal. The second option would categorize them by resource type, conventional or unconventional. Super Emitter Program: EPA is proposing to rescind the program that certified third-party monitors for so-called “super emitter” leak events and required states to do the same. Covers and Closed Vent Systems: EPA is proposing to split the “No Identifiable Emissions” aspect of covers and closed vent systems into design requirements and operational requirements. The operational requirements would allow for repairs. Associated Gas (gas from oil wells): EPA is proposing to restore 95%-efficient flaring or other control devices as the best system of emission reduction, rather than requiring all associated natural gas coming from oil wells to reach a sales line. Control Devices: EPA is proposing technical changes to give flexibility for flame monitoring data deviations, control device alerts, and visible emissions test conditions where appropriate. Scientific American: SpencerFane asserts the best explanation of the key things regarding the rule changes is found in the October 29, 2026, edition of Scientific American. scientificamerican.com/artic…. Methane is a major climate driver. Oil and gas leaks are a major methane source. Of the approximately 580 million metric tons of methane released annually, about 60% comes from human activity. Agriculture is the top anthropogenic source, with oil and gas production, processing, and transport ranking second – responsible for 28% of U.S. methane emissions. The second point is a key point, as listed in Scientific American, but it is a bit misdirected: The magazine notes that regulations haven’t moved the needle much. These are upstream and intrastate oil and gas people. They have cleaned up their operations with better measurements, better valves, better compression, reduced leaksand leak detection, not because federal permitting reached in. Many of the upstream wells are owned by intrastate pipelines and gathering systems; it is not an open access system. Owners are looking after their equity gas. The article refers to federal regulations. Many of the wells are not subject to NEPA or to the Natural Gas Act. They are not in interstate commerce. The same can be said regarding natural gas liquids (until gas and liquids are delivered into interstate commerce or they are delivered to a point of sale.) Many of the wells and gathering systems are not NEPA regulated. Similarly large Texas intrastate pipelines such as the Kinder Morgan system; those projects are not subject to NEPA (exc arguably for Section 311 pipelines). In Texas TCEQ has long and carefully regulated emissions and regulates for EPA as its designee. Owners get better investors when they clean up. Research conducted by Communications Earth & Environment, led by Johns Hopkins’ Scot Miller, using satellite data found methane emissions fell about 11% from 2019-2024, but this was driven mainly by industry technology changes and new pipeline infrastructure, not federal regulation, because operators have more incentive to capture gas when it’s profitable to sell rather than flare. New rules loosen restrictions on common wells. The EPA plans to scrap the never-implemented “Super Emitter Program.” That program would have let third parties flag large leaks via satellite. One can easily argue that there is no jurisdiction also, and this program would have been tied up in litigation for years.. Significantly, the proposals will ease rules for “marginal wells” (e., those that produce 15 barrels of oil or less per day, or 90,000 cubic feet of gas or less per day). Marginal wells make up over 70% of onshore wells and account for about half of industry methane emissions, despite accounting for only 7% of production. Low profitability gives operators little incentive to fix leaks at these wells. This is disturbing. ============================== How BAAJA Interacts with Natural Gas Regulation and Litigation Procedures • Preserves NGA Jurisdiction and Judicial Review: The Natural Gas Act remains the primary statute governing interstate natural gas pipelines, wholesale sales, rates, and LNG imports/exports through FERC and the Department of Energy (DOE). BAAJA's venue rules explicitly do not displace existing judicial review provisions under the Natural Gas Act. • Narrows State Water-Quality Reviews (CWA Section 401): Under BAAJA, Clean Water Act Section 401 reviews for interstate pipelines and transmission are limited to direct point-source discharges/water quality standards and subject to a nine-month review timeline, curbing a common state-level bottleneck for pipeline projects. • Speeds NEPA and Litigation Timelines: BAAJA narrows environmental review alternatives, expands categorical exclusions, sets review deadlines, caps judicial review windows at 150 days, and makes remand without vacatur the default remedy. For natural gas infrastructure, these changes aim to shorten approval timelines and reduce court How the Structure of Agency Cross Cutting Energy Permitting Bills Would Change • NEPA as a Procedural Umbrella: The National Environmental Policy Act (NEPA) is a single procedural statute requiring federal agencies to assess the environmental impacts of major federal actions. Some bills (like the SPEED Act) specifically target or restructure NEPA review processes, categorical exclusions, and litigation windows. • Other Statutory Regimes: Projects almost always require separate substantive permits, consultations, or approvals under other federal laws alongside or integrated with NEPA. These include (and may include others dependent on the substantive area): • Endangered Species Act (ESA) Section 7 (threatened/endangered species consultations) • Clean Water Act (CWA) (discharge and wetland permits) • National Historic Preservation Act (NHPA) Section 106 (historic and archeological site protection) • Federal Power Act, Magnuson-Stevens Fishery Conservation and Management Act, and various public land, energy, or transportation authorities. Effect of Omnibus and Crosscutting Legislation: Major reform packages (such as S. 5653) simultaneously amend NEPA and multiple other statutes like the Clean Water Act, Endangered Species Act, and NHPA to coordinate timelines and limit litigation risks across all regimes. ============================ Federal permitting reform: five proposed changes that could reshape project development and environmental litigation lexology.com/library/detail.… The legislation at the center of the Senate's permitting debate is the Bipartisan American Affordability and Jobs Act of 2026 (S. 5653), also known as BAAJA. Introduced on September 30, 2026, by Senators Shelley Moore Capito (R-W.Va.), Mike Lee (R-Utah), Martin Heinrich (D-N.M.), and Sheldon Whitehouse (D-R.I.), the bill passed a procedural vote (73–25) on November 9, 2026, to advance to floor debate. It is widely viewed as a landmark overhaul of federal infrastructure rules, with major implications for energy costs, the electric grid, and the legislative landscape heading into the 2027 Congress. Core Policy & Economic Importance • Expanding the Electric Grid. High-voltage transmission lines take an average of 10 years to build. The bill expands the Federal Energy Regulatory Commission's (FERC) "backstop" siting authority to approve interstate power lines even over a state's objection. Supporters argue this is essential to connect renewable energy and meet surging electricity demand. • Protecting Ratepayers from Data Center Costs. Rapidly growing AI and computing data centers require massive amounts of power. The bill directs FERC to establish rules requiring large energy loads (20 megawatts or more) to pay their fair share for the grid Procedural Considerations For project developers and regulated entities, five provisions stand out. They could affect how long federal permitting takes, when environmental review is required, how easily permits can be challenged and what happens to a project when a challenger prevails. Change #1: More projects could avoid full NEPA review The bill would narrow “major federal action” to agency actions subject to substantial federal control and responsibility The NEPA, as modified, would exclude: Non-federal projects with minimal federal funding or involvement Certain repairs to critical infrastructure that increase capacity by no more than 20% Specified transmission, natural gas, geothermal and other energy infrastructure activities The exclusions would also reach transmission and pipeline repairs and upgrades within existing rights-of-way and actions whose effects another agency has already evaluated. Reconductoring and other capacity upgrades within existing rights-of-way would be exempt from NEPA and NHPA review. Agencies could use categorical exclusions more widely and adopt each other’s. Qualifying state, tribal or other federal reviews could stand in for a separate NEPA document. Change #2: Agency review would face firmer deadlines and procedural limits The bill would generally require EAs within one year and EISs within two years. Other deadlines would follow: A record of decision within 45 days of a final EIS Remaining federal authorizations within 90 days (participating agencies) or 120 days (other agencies) after the review ends ESA Section 7 consultation generally finished on the NEPA schedule, with the base period cut from 90 to 60 days Public comment periods standardized at 45 to 60 days Sponsors could take interagency disputes to the chair of the Council on Environmental Quality (CEQ), whose decision would be final and unreviewable. These deadlines matter commercially. Delays can disrupt construction schedules, financing, supply contracts, tax-incentive timing and overall project economics. Importantly, the bill gives applicants a remedy when agencies miss deadlines Change #3: The window for challenging federal approvals could shrink dramatically The bill would set a 150-day filing period for many challenges and send NEPA challenges directly to the federal courts of appeals. The 150-day period would also apply to: Section 404 permits and verifications ESA biological opinions Most NHPA challenges Federal energy, mining, carbon management and wildfire mitigation permit decisions Today, the limitations period for many of these challenges can be as long as six years. The shorter period would apply without an exception for permits already issued. Standing. The bill would also narrow who can sue. Standing would be limited to parties that submitted a comment detailed enough to put the agency on notice of the specific issue and that alleged direct harm. Change #4: Courts could have less ability to halt projects after finding a legal error Today, a company can spend years obtaining federal approvals and then face major disruption if a court later finds a flaw in the agency’s environmental analysis. The proposed bill would change that. If a court finds that an authorization violates the bill’s NEPA requirements, its only remedy would be to remand the authorization to the agency, without vacatur or an injunction. The court would set a deadline for the agency to act on remand of no more than 180 days, and the authorization would generally remain in effect meanwhile. Similar remedy limits would apply to Section 404 permits - absent imminent and substantial danger to human health or the environment - and to most NHPA challenges. Courts would also owe agencies “substantial deference” on the scope and contents of an environmental document. Change #5: Clean Water Act permitting could become more predictable Section 401 reviews would be limited to compliance with water quality requirements. For interstate natural gas pipelines and interstate transmission projects, the period would drop to nine months. What now. The legislation could still change. Extensive rulemaking would be likely. Even if enacted, the bill would set a framework requiring extensive agency rulemaking, and some provisions would likely be tested in the courts. Still, its significance goes beyond making federal permitting “faster.” If enacted largely as written, it would reallocate permitting and litigation risk among project developers, federal agencies, states and project opponents. ======================= Bipartisan American Affordability and Jobs Act of 2026 - Cross Cuts Many areas of Energy & Environmental Legislation & Regulations; A Key Delimiter: NEPA Sponsor:Sen. Capito, Shelley Moore [R-WV] et al (Introduced 09/30/2026) Committees:Senate - Energy and Natural Resources This bill modifies federal permitting processes, including environmental reviews, to expedite a wide range of projects. Bills such as the instant Bipartisan American Affordability and Jobs Act of 2026 (S. 5653)—typically crosscut multiple statutes rather than belonging to just one category. The bill limits the scope of the National Environmental Policy Act and expedites environmental reviews, including by •further limiting the types of federal actions that trigger environmental review, •narrowing the range of alternatives that must be considered in environmental reviews, and •exempting additional types of projects from environmental review. Additionally, the bill addresses numerous aspects of energy infrastructure permitting, including by expanding the authority of the Federal Energy Regulatory Commission (FERC) to issue construction permits for certain interstate electricity transmission projects; directing FERC to establish ratepayer protections related to certain large computational loads (e.g. data centers); removing permit requirements for onshore oil and gas drilling on nonfederal land; and accelerating renewable energy, geothermal, hydropower, or offshore energy projects. ============== Will the bill get to the floor? Here is the CRS Explainer. The Bill is largely procedural, so following are some of the procedural rights conferred. bipartisanpolicy.org/explain… The bipartisan explainer has been updated to reflect the “Manager’s Amendment” to the Bipartisan American Affordability and Jobs Act. This was released on November 7, 2026. This explainer will continue to be updated as the legislation advances in Congress. Time is very tight for the current Congress. This explainer was updated on Sunday, November 8, 2026, to reflect the Senate’s manager’s amendment, released on Saturday, November 7, 2026. The authors expect the Senate to take a cloture vote on the motion to proceed on Monday, November 9, 2026.l continue to update this explainer as the legislation advances through Congress. Cloture is the only procedure by which the Senate can vote to set an end to a debate without also rejecting the bill, amendment, conference report, motion, or other matter it has been debating. A Senator can make a nondebatable motion to table an amendment, and if a majority of the Senate votes for that motion, the effect is to reject the amendment. Thus, the motion to table cannot be used to conclude a debate when Senators still wish to speak and to enable the Senate to vote for the proposal it is considering. Only the cloture provisions of Rule XXII achieve this purpose. congress.gov/crs_external_pr… Permitting Certainty Administrations from both parties have used the current permitting system to block disfavored project types. The Biden administration revoked the Keystone XL cross-border permit in January 2021, and the project was canceled that June; the Trump administration suspended work on five offshore wind projects in 2025, one of them roughly 87% built. There are many more examples of purposeful delays. The APA requires an agency to give a permit holder written notice and a chance to come into compliance before revoking a permit, except “in cases of willfulness” or those “in which public health, interest, or safety requires otherwise.” No general statutory limit governs the grounds on which an agency may revoke, suspend, or amend a permit it has already issued. In the event of revocation, suspension, or amendment, a sponsor’s recourse is to argue the action was arbitrary and capricious and, if successful, have it vacated or remanded. Damages are generally not available, so a developer can win the case and still lose money. Without permitting certainty, the process costs capacity at both ends. Projects that cannot be financed against an approval that may not hold never get built, and projects already financed can be stopped midstream, stranding capital and adding costs to whatever is eventually completed—at a moment when both electricity demand and prices are rising. Parts of this section overlap with provisions in the bipartisan CERTAIN Act (H.R. 8308) and the bipartisan, bicameral FREEDOM Act (H.R. 7329). Limits on Adverse Agency Action (Section 1401) Today an agency may reopen or unwind an issued permit on any ground it can defend as reasonable, and formal revocation is only the clearest route—slow-walking a decision, reopening a completed determination, or adding late conditions produces the same result. BAAJA would bar an agency from taking any action to “revoke, rescind, withdraw, terminate, suspend, vacate, remand, reopen, materially amend, or materially alter” a permit in effect on or after November 6, 2026, or from taking “any other action to interfere with or prevent the construction or operation at normal capacity” of a fully permitted project with a nonfederal sponsor. Six exceptions would remain The practical effect would be to force an agency to explain itself before acting against a permit, rather than after a sponsor sues. Slow-walking a decision or adding late conditions would be as actionable as formal revocation, and whatever ground the agency relied on would have to be stated in writing, with evidence, before it acted. Burden of Proof (Section 1401) BAAJA would reverse the burden of proof that for adverse actions: notwithstanding the APA or any other provision of law, the court shall “place the burden of proof on the Federal department or agency to demonstrate” that one of the six exceptions applies. Remedies (Section 1401) Under current law, a successful APA challenge to an action like permit revocation gets the action vacated or remanded, which restores the permit but does nothing to ameliorate the losses of the sponsor. BAAJA would add reinstatement of the permit, an injunction requiring the agency to obtain an order from the same judge before interfering again, attorney fees, and costs associated with the delay. On a showing that one or more federal agencies interfered in bad faith, a sponsor could also recover between 25% and 50% of its development and construction costs.
1
3
541
Synthetic Natural Gas (SNG); Electrolysis; DC Off Grid Solar UK Rivan is a 2024 start up. Rivan’s mission is to make life sustainable on earth, by making synthetic fuels cheaper than fossil. Founded in London in 2024 by CEO Harvey Hodd, the company builds modular plants that produce synthetic natural gas (SNG) for hard-to-decarbonize sectors like steel, cement, chemicals, and aviation. Despite electrification, Rivan’s forecast to use more fossil fuels in 2050 than Rivan does today, largely driven by AI and industries you can’t electrify: cement, steel, chemicals and aviation. Heavy industry relies on fossil fuels to deliver energy density and molecular feedstocks that electrification can’t. Synthetic fuels, specifically synthetic natural gas, offer perhaps the only solution – acting as scalable drop-in replacement with no carbon footprint. • The company operates a synthetic natural gas plant in Wiltshire and opened its London manufacturing facility (Production Base 1). Inputs: rainwater, water-splitting electrolyzer; CO2 (anaerobic digester(, moving to a direct air capture system (DAC); the Direct Air Capture System is currently under development; solar panels The core sub-systems of its 1MW synthetic natural gas plant are the electrolyser, reactor, power management and control, CO2 supply and balance-of-plant – all vertically integrated into the 1MW solar array: • Commercial Demand: Rivan reports multi-year supply agreements with industrial and aviation/data-center clients and plans to scale its manufacturing output. Against industry benchmarks for SNG plants, the hardware is >11x power cost (£/kW). To bring that vision to life, Rivan made two fundamental decisions about the engineering and process: Vertically integrating poRivanr and hardware into a single product to reduce cost and increase performance 10 months ago, Rivan validated the 100kW reactor and electrolyser performance, delivering GSMR spec SNG ready to be injected into the European gas-grid. In just 168 days, Rivan’ve scaled these systems up, integrated to the off-grid solar, and created a design Rivan’re ready to mass-manufacture: CO₂ For this system, Rivan’s using liquid biogenic CO₂ from a nearby anaerobic digestion (AD) plant. Millions of tons of carbon-neutral biogenic CO₂ with almost no value is vented each year from plants across Europe, forming a great opportunity for Rivan to use in the production. The CO₂ is stored in cryogenic tanks ahead of mixing with H₂ and feeding into the reactor. DAC (Direct Air Capture) As Rivan scale, Rivan’ll incorporate the own direct-air-capture (DAC) system that is currently being scaled up. Rivan’ve spoken about the approach to DAC here. SOURCES: rivan.com/news/rivan-deploys…
4
154
#RegolithManufacturing #LunarInsulation #Aerogels Effective Lunar Insulation created from Moon Based Materials-- In situ resource utilization: Purdue Researchers find that aerogels from moon dust and recycled materials could help insulate future lunar habitats Lunar dust—known as lunar regolith—plays a central and often challenging role in lunar manufacturing and in situ resource utilization (ISRU). Lunar Dust is theoretically used in Lunar Manufacturing as a raw material, as an additive manufacturing and sintering, and here to create composite materials: grinding regolith with recycled materials in a ball mill to manufacture aerogels and thermal insulation (see diagram (courtesy of ACS). This post describes research done at Purdue University and is followed by specifications set forth in ACS Sustainable Chemistry & Engineering “, Nanofibrillated Cellulose–Regolith Composite Aerogels for Lunar Thermal Insulation, Sept 18, 2026 . Alexander Wei and Jacob Staker, researchers in Purdue University’s College of Science, are developing methods to create aerogels — ultralight insulating materials — using components that could be generated on the moon. Aerogels are used as insulation in a variety of industrial and commercial applications, including spacecraft, buildings and electric vehicles. Wei and Staker are developing aerogels made from a combination of cellulose — a natural fiber that can be derived from paper or cardboard waste — and lunar regolith simulant, a material that is chemically and mineralogically similar to lunar soil or moon dust. Their results were recently published in ACS Sustainable Chemistry & Engineering. Aerogels are excellent insulators because their structure can support up to 99% empty space, leaving little solid material through which heat can travel. Those empty spaces are filled with air on Earth but become a vacuum on the moon and hardly conduct heat compared with a dense material, thereby reducing heat transfer. Wei and Staker chose cellulose and lunar regolith simulant as the main components of their aerogels because of their availability and physical properties. The regolith that Wei and Staker use contains mostly orthosilicates and aluminosilicates, minerals that make up much of the moon’s crust. Wei and Staker are studying lyophilization, or freeze-drying, for future iterations of aerogel production. Freeze-drying an aerogel works in the same way a person would freeze-dry food: Mixtures of nanofibrillated cellulose and regolith are frozen and placed in a vacuum to remove water through a process called sublimation. Ice crystals transform directly into vapor without melting, resulting in dehydrated, porous materials. “Freeze-drying is ultimately more practical and sustainable for production on the moon because the equipment is much simpler,” Wei said. “The lunar surface provides a natural vacuum and subfreezing temperatures at night, and the water removed during sublimation can be recovered and reused for a circular manufacturing process.” The researchers said: “We want the aerogel to be lightweight, sturdy and have low thermal conductivity,” Staker said. “By systematically changing the formulation, we can optimize the material ratio to support the best combination of those properties.” They found that aerogels with the lowest cellulose content generally provide the best insulation and lowest density. Increasing the amount of regolith in the formulations is also desirable because of its great abundance on the moon. However, higher cellulose content improves mechanical properties, resulting in a trade-off between insulation and structural integrity. Wei and Staker and others, described below, are trying to find the right recipe that provides good insulation and enough strength while using resources smartly. The joint authors of the ACS article "Nanofibrillated-Cellulose-Regolith-Composite", abstracted in part, here, present an ISRU approach toward thermally insulating composite aerogels based on nanofibrillated cellulose (NFC) and a lunar regolith simulant. Cellulose fibers are ground by planetary ball milling with lunar highland simulant (LHS-1) into NFC-regolith slurries with subsequent conversion into aerogels by supercritical drying. Comminution of cellulose fibers and LHS-1 particles enable the production of composite aerogels with thermal conductivities as low as 30 mW/m·K. Multiparametric optimization of aerogel properties can be guided by design of experiments (DOE) based on the mass ratios of NFC in water, LHS-1 in aerogel, and amount of milling media. The ACS study illustrates how composite aerogels made of regolith and fibrillated cellulose can provide sustainable routes toward functional materials for lunar habitats and other extraterrestrial resource-limited environments. =========================== SOURCES: doi.org/10.1021/acssuschemen… purdue.edu/newsroom/2026/Q4/… pubs.acs.org/ascecg/article-…
1
6
139
Permitting Reform by Federal Statute: A Look at a NEPA Based Statute; A Major Example of an Energy Federal Permit Based Bill Summary: S.5653 — 119th Congress (2025-2026) Bipartisan American Affordability and Jobs Act of 2026 Info from CRS Official Summary of a Broad NEPA Bill How the Structure of Agency Cross Cutting Energy Permitting Bills Would Change • NEPA as a Procedural Umbrella: The National Environmental Policy Act (NEPA) is a single procedural statute requiring federal agencies to assess the environmental impacts of major federal actions. Some bills (like the SPEED Act) specifically target or restructure NEPA review processes, categorical exclusions, and litigation windows. • Other Statutory Regimes: Projects almost always require separate substantive permits, consultations, or approvals under other federal laws alongside or integrated with NEPA. These include (and may include others dependent on the substantive area): • Endangered Species Act (ESA) Section 7 (threatened/endangered species consultations) • Clean Water Act (CWA) (discharge and wetland permits) • National Historic Preservation Act (NHPA) Section 106 (historic and archeological site protection) • Federal Power Act, Magnuson-Stevens Fishery Conservation and Management Act, and various public land, energy, or transportation authorities. Effect of Omnibus and Crosscutting Legislation: Major reform packages (such as S. 5653) simultaneously amend NEPA and multiple other statutes like the Clean Water Act, Endangered Species Act, and NHPA to coordinate timelines and limit litigation risks across all regimes. ============================ Federal permitting reform: five proposed changes under the BAAJA bill that could reshape project development and environmental litigation lexology.com/library/detail.… The legislation at the center of the Senate's permitting debate is the Bipartisan American Affordability and Jobs Act of 2026 (S. 5653), also known as BAAJA. Introduced on September 30, 2026, by Senators Shelley Moore Capito (R-W.Va.), Mike Lee (R-Utah), Martin Heinrich (D-N.M.), and Sheldon Whitehouse (D-R.I.), the bill passed a procedural vote (73–25) on November 9, 2026, to advance to floor debate. It is widely viewed as a landmark overhaul of federal infrastructure rules, with major implications for energy costs, the electric grid, and the legislative landscape heading into the 2027 Congress. Permitting Reform by federal statute: A Look at a NEPA Based Statute; A Major Example of an Energy Federal Permit Based Bill Summary: S.5653 — 119th Congress (2025-2026) Bipartisan American Affordability and Jobs Act of 2026 Info from CRS Official Summary of a Broad NEPA Bill (There is one official summary for S.5653. Bill summaries are authored by CRS.) How the Structure of Agency Cross Cutting Energy Permitting Bills Would Change • NEPA as a Procedural Umbrella: The National Environmental Policy Act (NEPA) is a single procedural statute requiring federal agencies to assess the environmental impacts of major federal actions. Some bills (like the SPEED Act) specifically target or restructure NEPA review processes, categorical exclusions, and litigation windows. • Other Statutory Regimes: Projects almost always require separate substantive permits, consultations, or approvals under other federal laws alongside or integrated with NEPA. These include (and may include others dependent on the substantive area): • Endangered Species Act (ESA) Section 7 (threatened/endangered species consultations) • Clean Water Act (CWA) (discharge and wetland permits) • National Historic Preservation Act (NHPA) Section 106 (historic and archeological site protection) • Federal Power Act, Magnuson-Stevens Fishery Conservation and Management Act, and various public land, energy, or transportation authorities. Effect of Omnibus and Crosscutting Legislation: Major reform packages (such as S. 5653) simultaneously amend NEPA and multiple other statutes like the Clean Water Act, Endangered Species Act, and NHPA to coordinate timelines and limit litigation risks across all regimes. ============================ Federal permitting reform: five proposed changes that could reshape project development and environmental litigation lexology.com/library/detail.… The legislation at the center of the Senate's permitting debate is the Bipartisan American Affordability and Jobs Act of 2026 (S. 5653), also known as BAAJA. Introduced on September 30, 2026, by Senators Shelley Moore Capito (R-W.Va.), Mike Lee (R-Utah), Martin Heinrich (D-N.M.), and Sheldon Whitehouse (D-R.I.), the bill passed a procedural vote (73–25) on November 9, 2026, to advance to floor debate. It is widely viewed as a landmark overhaul of federal infrastructure rules, with major implications for energy costs, the electric grid, and the legislative landscape heading into the 2027 Congress. Core Policy & Economic Importance • Expanding the Electric Grid. High-voltage transmission lines take an average of 10 years to build. The bill expands the Federal Energy Regulatory Commission's (FERC) "backstop" siting authority to approve interstate power lines even over a state's objection. Supporters argue this is essential to connect renewable energy and meet surging electricity demand. • Protecting Ratepayers from Data Center Costs. Rapidly growing AI and computing data centers require massive amounts of power. The bill directs FERC to establish rules requiring large energy loads (20 megawatts or more) to pay their fair share for the grid Procedural Considerations For project developers and regulated entities, five provisions stand out. They could affect how long federal permitting takes, when environmental review is required, how easily permits can be challenged and what happens to a project when a challenger prevails. Change #1: More projects could avoid full NEPA review The bill would narrow “major federal action” to agency actions subject to substantial federal control and responsibility The NEPA, as modified, would exclude: Non-federal projects with minimal federal funding or involvement Certain repairs to critical infrastructure that increase capacity by no more than 20% Specified transmission, natural gas, geothermal and other energy infrastructure activities The exclusions would also reach transmission and pipeline repairs and upgrades within existing rights-of-way and actions whose effects another agency has already evaluated. Reconductoring and other capacity upgrades within existing rights-of-way would be exempt from NEPA and NHPA review. Agencies could use categorical exclusions more widely and adopt each other’s. Qualifying state, tribal or other federal reviews could stand in for a separate NEPA document. Change #2: Agency review would face firmer deadlines and procedural limits The bill would generally require EAs within one year and EISs within two years. Other deadlines would follow: A record of decision within 45 days of a final EIS Remaining federal authorizations within 90 days (participating agencies) or 120 days (other agencies) after the review ends ESA Section 7 consultation generally finished on the NEPA schedule, with the base period cut from 90 to 60 days Public comment periods standardized at 45 to 60 days Sponsors could take interagency disputes to the chair of the Council on Environmental Quality (CEQ), whose decision would be final and unreviewable. These deadlines matter commercially. Delays can disrupt construction schedules, financing, supply contracts, tax-incentive timing and overall project economics. Importantly, the bill gives applicants a remedy when agencies miss deadlines Change #3: The window for challenging federal approvals could shrink dramatically The bill would set a 150-day filing period for many challenges and send NEPA challenges directly to the federal courts of appeals. The 150-day period would also apply to: Section 404 permits and verifications ESA biological opinions Most NHPA challenges Federal energy, mining, carbon management and wildfire mitigation permit decisions Today, the limitations period for many of these challenges can be as long as six years. The shorter period would apply without an exception for permits already issued. Standing. The bill would also narrow who can sue. Standing would be limited to parties that submitted a comment detailed enough to put the agency on notice of the specific issue and that alleged direct harm. Change #4: Courts could have less ability to halt projects after finding a legal error Today, a company can spend years obtaining federal approvals and then face major disruption if a court later finds a flaw in the agency’s environmental analysis. The proposed bill would change that. If a court finds that an authorization violates the bill’s NEPA requirements, its only remedy would be to remand the authorization to the agency, without vacatur or an injunction. The court would set a deadline for the agency to act on remand of no more than 180 days, and the authorization would generally remain in effect meanwhile. Similar remedy limits would apply to Section 404 permits - absent imminent and substantial danger to human health or the environment - and to most NHPA challenges. Courts would also owe agencies “substantial deference” on the scope and contents of an environmental document. Change #5: Clean Water Act permitting could become more predictable Section 401 reviews would be limited to compliance with water quality requirements. For interstate natural gas pipelines and interstate transmission projects, the period would drop to nine months. What now. The legislation could still change. Extensive rulemaking would be likely. Even if enacted, the bill would set a framework requiring extensive agency rulemaking, and some provisions would likely be tested in the courts. Still, its significance goes beyond making federal permitting “faster.” If enacted largely as written, it would reallocate permitting and litigation risk among project developers, federal agencies, states and project opponents. =============== Bipartisan American Affordability and Jobs Act of 2026 Sponsor: Sen. Capito, Shelley Moore [R-WV] et al (Introduced 09/30/2026) Committees: Senate - Energy and Natural Resources This bill modifies federal permitting processes, including environmental reviews, to expedite a wide range of projects. Bills such as the instant Bipartisan American Affordability and Jobs Act of 2026 (S. 5653)—typically crosscut multiple statutes rather than belonging to just one category. The bill limits the scope of the National Environmental Policy Act and expedites environmental reviews, including by further limiting the types of federal actions that trigger environmental review, narrowing the range of alternatives that must be considered in environmental reviews, and exempting additional types of projects from environmental review. Additionally, the bill addresses numerous aspects of energy infrastructure permitting, including by expanding the authority of the Federal Energy Regulatory Commission (FERC) to issue construction permits for certain interstate electricity transmission projects; directing FERC to establish ratepayer protections related to certain large computational loads (e.g. data centers); removing permit requirements for onshore oil and gas drilling on nonfederal land; and accelerating renewable energy, geothermal, hydropower, or offshore energy projects. ============== Will the bill get to the floor-the Explainer's take Explaining the Senate Permitting Bill, the Bipartisan American Affordability and Jobs Act bipartisanpolicy.org/explain… The bipartisan explainer has been updated to reflect the “Manager’s Amendment” to the Bipartisan American Affordability and Jobs Act. This was released on November 7, 2026. This explainer will continue to be updated as the legislation advances in Congress. Time is very tight for the current Congress. This explainer was updated on Sunday, November 8, 2026, to reflect the Senate’s manager’s amendment, released on Saturday, November 7, 2026. The authors expect the Senate to take a cloture vote on the motion to proceed on Monday, November 9, 2026.l continue to update this explainer as the legislation advances through Congress. Cloture is the only procedure by which the Senate can vote to set an end to a debate without also rejecting the bill, amendment, conference report, motion, or other matter it has been debating. A Senator can make a nondebatable motion to table an amendment, and if a majority of the Senate votes for that motion, the effect is to reject the amendment. Thus, the motion to table cannot be used to conclude a debate when Senators still wish to speak and to enable the Senate to vote for the proposal it is considering. Only the cloture provisions of Rule XXII achieve this purpose. congress.gov/crs_external_pr… Permitting Certainty Administrations from both parties have used the current permitting system to block disfavored project types. The Biden administration revoked the Keystone XL cross-border permit in January 2021, and the project was canceled that June; the Trump administration suspended work on five offshore wind projects in 2025, one of them roughly 87% built. There are many more examples of purposeful delays. The APA requires an agency to give a permit holder written notice and a chance to come into compliance before revoking a permit, except “in cases of willfulness” or those “in which public health, interest, or safety requires otherwise.” No general statutory limit governs the grounds on which an agency may revoke, suspend, or amend a permit it has already issued. In the event of revocation, suspension, or amendment, a sponsor’s recourse is to argue the action was arbitrary and capricious and, if successful, have it vacated or remanded. Damages are generally not available, so a developer can win the case and still lose money. Without permitting certainty, the process costs capacity at both ends. Projects that cannot be financed against an approval that may not hold never get built, and projects already financed can be stopped midstream, stranding capital and adding costs to whatever is eventually completed—at a moment when both electricity demand and prices are rising. Parts of this section overlap with provisions in the bipartisan CERTAIN Act (H.R. 8308) and the bipartisan, bicameral FREEDOM Act (H.R. 7329). Limits on Adverse Agency Action (Section 1401) Today an agency may reopen or unwind an issued permit on any ground it can defend as reasonable, and formal revocation is only the clearest route—slow-walking a decision, reopening a completed determination, or adding late conditions produces the same result. BAAJA would bar an agency from taking any action to “revoke, rescind, withdraw, terminate, suspend, vacate, remand, reopen, materially amend, or materially alter” a permit in effect on or after November 6, 2026, or from taking “any other action to interfere with or prevent the construction or operation at normal capacity” of a fully permitted project with a nonfederal sponsor. Six exceptions would remain The practical effect would be to force an agency to explain itself before acting against a permit, rather than after a sponsor sues. Slow-walking a decision or adding late conditions would be as actionable as formal revocation, and whatever ground the agency relied on would have to be stated in writing, with evidence, before it acted. Burden of Proof (Section 1401) BAAJA would reverse the burden of proof that for adverse actions: notwithstanding the APA or any other provision of law, the court shall “place the burden of proof on the Federal department or agency to demonstrate” that one of the six exceptions applies. Remedies (Section 1401) Under current law, a successful APA challenge to an action like permit revocation gets the action vacated or remanded, which restores the permit but does nothing to ameliorate the losses of the sponsor. BAAJA would add reinstatement of the permit, an injunction requiring the agency to obtain an order from the same judge before interfering again, attorney fees, and costs associated with the delay. On a showing that one or more federal agencies interfered in bad faith, a sponsor could also recover between 25% and 50% of its development and construction costs. Core Policy & Economic Importance • Expanding the Electric Grid. High-voltage transmission lines take an average of 10 years to build. The bill expands the Federal Energy Regulatory Commission's (FERC) "backstop" siting authority to approve interstate power lines even over a state's objection. Supporters argue this is essential to connect renewable energy and meet surging electricity demand. • Protecting Ratepayers from Data Center Costs. Rapidly growing AI and computing data centers require massive amounts of power. The bill directs FERC to establish rules requiring large energy loads (20 megawatts or more) to pay their fair share for the grid Procedural Considerations For project developers and regulated entities, five provisions stand out. They could affect how long federal permitting takes, when environmental review is required, how easily permits can be challenged and what happens to a project when a challenger prevails. Change #1: More projects could avoid full NEPA review The bill would narrow “major federal action” to agency actions subject to substantial federal control and responsibility The NEPA, as modified, would exclude: Non-federal projects with minimal federal funding or involvement Certain repairs to critical infrastructure that increase capacity by no more than 20% Specified transmission, natural gas, geothermal and other energy infrastructure activities The exclusions would also reach transmission and pipeline repairs and upgrades within existing rights-of-way and actions whose effects another agency has already evaluated. Reconductoring and other capacity upgrades within existing rights-of-way would be exempt from NEPA and NHPA review. Agencies could use categorical exclusions more widely and adopt each other’s. Qualifying state, tribal or other federal reviews could stand in for a separate NEPA document. Change #2: Agency review would face firmer deadlines and procedural limits The bill would generally require EAs within one year and EISs within two years. Other deadlines would follow: A record of decision within 45 days of a final EIS Remaining federal authorizations within 90 days (participating agencies) or 120 days (other agencies) after the review ends ESA Section 7 consultation generally finished on the NEPA schedule, with the base period cut from 90 to 60 days Public comment periods standardized at 45 to 60 days Sponsors could take interagency disputes to the chair of the Council on Environmental Quality (CEQ), whose decision would be final and unreviewable. These deadlines matter commercially. Delays can disrupt construction schedules, financing, supply contracts, tax-incentive timing and overall project economics. Importantly, the bill gives applicants a remedy when agencies miss deadlines Change #3: The window for challenging federal approvals could shrink dramatically The bill would set a 150-day filing period for many challenges and send NEPA challenges directly to the federal courts of appeals. The 150-day period would also apply to: Section 404 permits and verifications ESA biological opinions Most NHPA challenges Federal energy, mining, carbon management and wildfire mitigation permit decisions Today, the limitations period for many of these challenges can be as long as six years. The shorter period would apply without an exception for permits already issued. Standing. The bill would also narrow who can sue. Standing would be limited to parties that submitted a comment detailed enough to put the agency on notice of the specific issue and that alleged direct harm. Change #4: Courts could have less ability to halt projects after finding a legal error Today, a company can spend years obtaining federal approvals and then face major disruption if a court later finds a flaw in the agency’s environmental analysis. The proposed bill would change that. If a court finds that an authorization violates the bill’s NEPA requirements, its only remedy would be to remand the authorization to the agency, without vacatur or an injunction. The court would set a deadline for the agency to act on remand of no more than 180 days, and the authorization would generally remain in effect meanwhile. Similar remedy limits would apply to Section 404 permits - absent imminent and substantial danger to human health or the environment - and to most NHPA challenges. Courts would also owe agencies “substantial deference” on the scope and contents of an environmental document. Change #5: Clean Water Act permitting could become more predictable Section 401 reviews would be limited to compliance with water quality requirements. For interstate natural gas pipelines and interstate transmission projects, the period would drop to nine months. What now. The legislation could still change. Extensive rulemaking would be likely. Even if enacted, the bill would set a framework requiring extensive agency rulemaking, and some provisions would likely be tested in the courts. Still, its significance goes beyond making federal permitting “faster.” If enacted largely as written, it would reallocate permitting and litigation risk among project developers, federal agencies, states and project opponents. ====================================================== Bipartisan American Affordability and Jobs Act of 2026 Sponsor: Sen. Capito, Shelley Moore [R-WV] et al (Introduced 09/30/2026) Committees: Senate - Energy and Natural Resources This bill modifies federal permitting processes, including environmental reviews, to expedite a wide range of projects. Bills such as the instant Bipartisan American Affordability and Jobs Act of 2026 (S. 5653)—typically crosscut multiple statutes rather than belonging to just one category. The bill limits the scope of the National Environmental Policy Act and expedites environmental reviews, including by further limiting the types of federal actions that trigger environmental review, narrowing the range of alternatives that must be considered in environmental reviews, and exempting additional types of projects from environmental review. Additionally, the bill addresses numerous aspects of energy infrastructure permitting, including by expanding the authority of the Federal Energy Regulatory Commission (FERC) to issue construction permits for certain interstate electricity transmission projects; directing FERC to establish ratepayer protections related to certain large computational loads (e.g. data centers); removing permit requirements for onshore oil and gas drilling on nonfederal land; and accelerating renewable energy, geothermal, hydropower, or offshore energy projects. ============== Will the bill get to the floor Explaining the Senate Permitting Bill, the Bipartisan American Affordability and Jobs Act bipartisanpolicy.org/explain… The bipartisan explainer has been updated to reflect the “Manager’s Amendment” to the Bipartisan American Affordability and Jobs Act. This was released on November 7, 2026. This explainer will continue to be updated as the legislation advances in Congress. Time is very tight for the current Congress. This explainer was updated on Sunday, November 8, 2026, to reflect the Senate’s manager’s amendment, released on Saturday, November 7, 2026. The authors expect the Senate to take a cloture vote on the motion to proceed on Monday, November 9, 2026.l continue to update this explainer as the legislation advances through Congress. Cloture is the only procedure by which the Senate can vote to set an end to a debate without also rejecting the bill, amendment, conference report, motion, or other matter it has been debating. A Senator can make a nondebatable motion to table an amendment, and if a majority of the Senate votes for that motion, the effect is to reject the amendment. Thus, the motion to table cannot be used to conclude a debate when Senators still wish to speak and to enable the Senate to vote for the proposal it is considering. Only the cloture provisions of Rule XXII achieve this purpose. congress.gov/crs_external_pr… Permitting Certainty Administrations from both parties have used the current permitting system to block disfavored project types. The Biden administration revoked the Keystone XL cross-border permit in January 2021, and the project was canceled that June; the Trump administration suspended work on five offshore wind projects in 2025, one of them roughly 87% built. There are many more examples of purposeful delays. The APA requires an agency to give a permit holder written notice and a chance to come into compliance before revoking a permit.
1
5
156
REPUBLICAN SENATE SHOULD PUSH TO GET APPROVAL OF ARTICLE III, LIFETIME FEDERAL JUDGES NOMINATED BY PRESIDENT TRUMP. Article III federal judges are appointed for life by the President of the United States and confirmed by the U.S. Senate in accordance with Article III of the United States Constitution. Article III judges serve on: • Supreme Court of the United States (discretionary jurisdiction): 9 justices • United States Courts of Appeals (appellate courts of law; all cases must be heard): 179 judges • United States District Courts (trial courts): 678 judges • United States Court of International Trade: 9 judges Ballotpedia reports that as of the monthly report for November 1, 2026, there were 28 vacancies across 870 Article III judgeships in the United States. Since taking office for his second term, President Donald Trump (R) has nominated 93 individuals to federal judgeships on Article III courts. As of November 3, 2026, 56 of the nominees were confirmed. Judicial lifetime tenure is not specifically guaranteed in the Constitution, but lifetime tenure has consistently been interpreted to safeguard judicial independence. This system is thought to “insulate [federal judges] from the temporary passions of the public, and allow them to apply the law with only justice in mind, and not electoral or political concerns. Another way of stating this is that a new judge can give sustainability to President Trump’s legal policies.) Time is short and emergency conditions apply. To obtain one of the lifetime positions, candidates must be approved by a 50% vote of the Senate. If you wish to contact some of the Senators (and I hope you will), following are the Republican members of the Senate Judiciary Committee if you wish to contact them to request that they do all possible to bring nominations forward. (The Judiciary Comm just had a hearing to bring 3 forward; there will be another November hearing to bring others forward. No hearings are scheduled for December.) Majority Members (Republican) • John Cornyn (TX) • Mike Lee (UT) • Ted Cruz (TX) • Josh Hawley (MO) • Thom Tillis (NC) • John Kennedy (LA) • Marsha Blackburn (TN) • Eric Schmitt (MO) • Katie Britt (AL) • Ashley Moody (FL) • Darline Graham (SC) BACKGROUND: Term Limits. Many--mostly Democrats who wish to communize the courts and seize their authority--are discussing term limits for the federal judiciary. They do not specifically discuss whether a term limit would apply retroactively to force retirement of judges already in office. Differentiating Article I Judges. Article I Judges. Although they are sometimes called "federal judges", the term technically does not extend to U.S. magistrate judges or the judges of lesser federal tribunals such as the U.S. Bankruptcy Courts, the U.S. Court of Federal Claims, the U.S. Court of Appeals for the Armed Forces, the U.S. Court of Appeals for Veterans Claims, the U.S. Tax Court, and other "Article One tribunals". These judges do not have life tenure, and their authority derives from Congress via Article One of the Constitution, not independently via Article Three. These judges are often known as "Article I judges". Administrative Law Judges (ALJs). The term federal judge is also not applied to the administrative law judges of federal government agencies located within the executive branch. There are approximately 1,900 to 2,000 federal administrative law judges (ALJs) serving across various U.S. executive departments and agencies. These positions were created by the Administrative Procedure Act and are hired by various large agencies that deal with claims: Social Security Administration Department of Labor, Department of the Interior, Department of Agriculture, and the Occupational Safety and Health Review Commission. Non-ALJ Adjudicators. In addition to formal ALJs, the federal government utilizes more than 10,000 other non-ALJ administrative judges and hearing officers who handle specialized agency proceedings (such as immigration or tax courts). ==================== SOURCES: uscourts.gov/about-federal-c… ballotpedia.org/Current_fede… judiciary.senate.gov/about/m…
6
207
Budget Reconciliation, Simplified Pure budgetary changes. A reconciliation bill in the Senate is not introduced by a single individual, but is instead developed and reported by specific Senate committees with jurisdiction over spending or revenues, based on instructions from an adopted concurrent budget resolution. Central requirement. It must be based on pure budgetary changes. The priorities pushed by Republican lawmakers for a late-2026 reconciliation package include: • Defense Modernization & Intelligence: Pushing for around $73 billion in defense and intelligence funding. • Border Security & Immigration: Codifying and funding Trump administration border enforcement policies, immigration personnel, and removal operations. • Tax Relief & Extensions: Providing additional family or business tax relief and extensions. • Spending & Welfare Reforms: Attempting at least $1 trillion in spending cuts, rescinding unobligated COVID-19-related funds, and adding work-reporting requirements for safety-net programs like Temporary Assistance for Needy Families (TANF). • Other Conservative Policy Riders: Incorporating measures such as agricultural aid ($12 billion), funds for voting restrictions, debt limit adjustments, or housing supply components. BACKGROUND Engaging in budget reconciliation is a legislative procedure made available as a result of the 1974 Congressional Budget and Impoundment Control Act. Reconciliation allows for expedited consideration of certain and specified changes in law to align spending, revenue, and the debt limit with agreed-upon budget targets. Over the 52-year history of the Act, 25 budget reconciliation bills have been enacted, most recently the 2026 Secure America Act (providing additional funds to the Department of Homeland Security) and the significant 2025 One Big Beautiful Bill Act. Legislative maze. Reconciliation can seem tortuous, like a maze of steps and restrictions, and is not the textbook legislative process. What is being reconciled to is a concurrent budget resolution. The reconciliation bill receives expedited consideration in the Senate through time limits on debate and, with a consent agreement, amendments. Simplified, the steps are: • Budget Resolution: Congress first adopts a concurrent budget resolution containing reconciliation instructions that direct specific committees to achieve designated spending, revenue, or debt-limit changes. • Committee Crafting and Introduction: Individual Senate committees (such as the Senate Budget, Judiciary, or Homeland Security and Governmental Affairs Committees, chaired or led by specific senators like Lindsey Graham or Chuck Grassley) draft and formally report their specific legislative titles or bills to fulfill those instructions. • Omnibus Aggregation: The Senate Budget Committee then combines these separate committee-reported pieces into a single omnibus reconciliation package for consideration on the Senate floor. Simple majority: The central advantage of reconciliation is that it lets Congress pass major changes in law with a simple majority in the Senate, rather than the 60 votes most legislation needs to overcome a filibuster. =================== SOURCE: bipartisanpolicy.org/explain… on August 5, 2026
2
69
TEXAS COMPLEX BUSINESS APPELLATE CASES, NEW APPELLATE BUSINESS COURT OF APPEALS, AND NOV ELECTION WIPEOUT OF ALL PANEL MEMBERS In a crushing blow to speedy resolution and justice for complex business matters in Texas, ALL three of the fine Republican justices comprising the recently created 15th Court of Appeals lost their races for reelection. The justices are Chief Justice Scott Brister, Justice Scott Field, and Justice April Farris as the first three justices on this new court. They were hand picked and appointed by Gov Abbott as the initial panel. Each of the three justices received approx. 39% of the vote, compared to the respective Democrat challengers who each got approx. 61%. One can only surmise that this was part of the generalized blood bath administered by Texas voters in the November 2026 election. This 15th Court of Appeals is a new, first of its kind, court, opened in September 2024. The November 2026 race was listed with all other judicial races and was designated by the court number 15th Court of Appeals, with no description of the specialized subject matter jurisdiction of complex business appeals and matters of central interest to the State so it looked like any other appellate judge race to the incautious, or straight ticket, or rage voter. BACKGROUND: The Texas Legislature created two new courts which opened in September 2024, specializing the court’s subject matter jurisdiction in, and elevating the importance of, business litigation. The first of the two courts was the Texas Business Court designed to litigate complex commercial matters and corporate law issues quickly. (Texas was slow to create the trial Business Court.). The second court, the 15th Court of Appeals, was a legal first: an intermediate appellate court designed to hear all cases arising from the Business Court and certain categories of government litigation described as “critical to the State’s interests.” Unlike other appellate courts, this court is required to issue opinions explaining their reasoning in dispositive issues and matters crucial to the State’s interests. ====================== Sources: A Matter of Opinion, Justice April Harris, Texas Bar Journal, vol. 89, no. 10, p 721, Nov 2026; Harris County Central Count Section, issued Nov 4, 2026
1
5
205
Replying to @elonmusk
@elonmusk Maybe there can be a black t-shirt for you with the statement "we are not breaking physics" by itself or followed in smalle font with an explanation. (from your recent talk about double catching rocket components)
2
10
347
Replying to @realDonaldTrump
@realDonaldTrump @elonmusk @GregAbbott_TX @SenTedCruz @SenMikeLee @MikeJohnson @GuntherEagleman EARLY VOTING IS STILL GOING ON FOR ANOTHER WEEK IN MANY STATES. IT IS IMPORTANT TO BANK REPUBLICAN VOTES RATHER THAN WAITING UNTIL ELECTION DAY. Republicans waiting to vote until Election Day (November 3) is not a good strategy. Democrats bank votes in early voting to help see early voting results to learn how many Dem votes they have to get out on Election Day. Republicans must get out and vote in early voting. We need the votes now, and we do not want Repubs to run into a voting barrier on Election Day. PLEASE DO YOUR PART. GET OUT FROM BEHIND YOUR COMPUTER OR PHONE, QUIT COMPLAINING, AND ACT. OUR COUNTRY, CANDIDATES, PRES TRUMP, AND ELON MUSK NEED YOU. The candidates are counting on you to support them and our country. President Trump and Elon Musk have given huge amounts of time and money to bring victory. How can you consider saying "I'll count on someone else" or "My vote won't make a difference"? VOTING FRAUD. You can watch cameras focused on voting operations in Harris Co TX--our largest, honest system--online in harrisvotes.com. We reconcile the count of early votes on Sat Oct 31. If DJT wants to see voting fraud, compare what we do with what goes on in your state or county.
1
12
328
IN THE ELECTION, YOU MUST VOTE FOR ALL THE OFFICES INCLUDING ALL DIST JUDGES AND COUNTY OFFICIALS. THEY RUN OUR DAY TO DAY GOVERNMENT. Make President Trump's and Elon Musk's incredible financial contributions worth their all. Go to the polls and vote AND VOTE THE ENTIRE BALLOT. IT IS IMPORTANT TO VOTE THE ENTIRE BALLOT. We get our justice from the down ballot district court judges we elect and we get our day to day government administration from county judges and supervisors. Democrats are trained to vote for ALL the offices. Mathematically they will win if we do not do the same and much of our effectiveness of having Republicans at the top of the pecking order (senators, governors, congressmen), will be undermined by allowing the day to day affairs to be governed by not very honest or efficient Democrats. AGAIN, VOTE FOR ALL THE OFFICES. AND GO VOTE EARLY. LOVE YOU ALL. DO IT. 💯❤️
2
13
345
Replying to @realDonaldTrump
@realDonaldTrump @elonmusk @GregAbbott_TX @SenTedCruz @SenMikeLee @MikeJohnson @GuntherEagleman Early Voting Has Started for our November 3, 2026, nationwide, midterm election. Election Day, Nov 3, is approaching, but in many states you can, and really should, early vote. Now is the time to get out and vote early. Notwithstanding table pounding about Election Day, Republicans need a significant bank of early votes in all states. Election Day voting only persons are flat out wrong on this issue. Sorry. Anything could happen to interfere with your exercise of your precious right to vote: family emergency or illness, car trouble, work trouble, etc. and you will have lost your privilige and will have to try to hide it from others. Please modify your stance at least for this crucial election. You need to get up and vote early. It is easy and you can prepare. First make sure you are registered to vote. Determine your early voting places. Download or pick up a sample ballot and mark your choices ahead; take that sample ballot in to the booth. Go with your family. And go with your friends. Republicans cannot afford to sit on the sidelines this time. There are too many ultraliberal Democrats with socialist ideas who want to turn around all we have accomplished under Pres Trump. It is a common Democratic strategy to bank up large blocks of early voting making it hard to overcome on Election Day. Do not dishonor President Trump by being pigheaded. Democrats will early vote. You must respond. DJT is wrong on this issue, but he is coming around. You owe it to him to help him tactfully see the light and point out the strategic Republican error, in this case of literal reading of the Constitution--the states get to set times and dates for voting, not the federal government. Further, Elon Musk is helping enormously in this election with his very generous campaign contributions. Show him you are grateful and understand the depth of his patriotism and his wonderful gift. Show him you love and respect all he does for our country. Download a ballot on your computer. You can mark it up and take it with you. Mark one up for your significant other and adult children who are registered. Take your driver's license as a photo ID. Take the younger kids so they can see what their parents are doing and be proud. SOMETHING IS WRONG WITH MAIL IN BALLOTS AND WE HAVE TO OVERCOME THE NUMBERS BY CASTING VERY SIGNIFICANT IN PERSON VOTING, THE EARLIER THE BETTER. In Texas the number of mail in ballots for our largest county alone, Harris Co, we expect to see returned is guesstimated at 60,000--70,000 (they can come in through Election Day). Most of these are persons who are "over 65 years old." In Texas, I do my share at Harris County Election Headquarters both for mail in and in person voting. Right now we are processing the mail in ballots, and it is disgusting; not good at all--overwhelmingly, maybe 80-90 percent of receipts dependent on the precinct are cast for Democrats (yes Talarico et al). Other states may be just as distorted. This is not when we give up for this crucial mid-Term; this is when we fight back. You can add your vote to our absolute counts as well as turn this mail in ballot fiasco which occurs in many states around, but it will require your action, and you have to get up off your keister and go to the poll and cast your own ballot. It is easy. Download a ballot, check your polling locations, mark the ballot and you can take it in with you unless you plan to vote straight Republican. Vote for ALL the offices even ones that seem negligible or boring; do not skip County Supervisors or Judges or Administrators--they have their fingers on our budgets and infrastructure-- and do not skip the District Judges who are to bring justice. This is how we wind up with a full slate of elected Democratic officials who actually run the county and our budgets. Republicans who skip the down ballot races, give Democrats the election; they can get elected with only a few votes. And you wind up asking how we got such a suckhole local government even with such good governors. MAKE ME QUIT NAGGING AT YOU: JUST GO VOTE. THANKS.
1
1
1
10
447
Replying to @elonmusk
@elonmusk #FlyingRoadster #Crosscountryrocketflights Prototype for Cross Country Rocket Flights? Flying Roadster is truly magnificent, but I think with his wonderful raptors and other features, he may be related to the idea you told us about to have cross nation rocket flights. Fast, short take off and landing, flexible.
1
7
240
Replying to @SpaceX
@SpaceX @elonmusk SpaceX Starship-Super Heavy Operations at Space Launch Complex 37 at Cape Canaveral Space Force Station, Cape Canaveral, Florida Docket Number FAA–2026–10792, 91 Federal Register 61551, September 29, 2026 * Here are some excerpts of comments in favor of preparing and SEIS for the CCSF. ** An SEIS is used to supplement an existing EIS, not to approve it. ** First, the legal aspects of the project need additional treatment to make the EIS adequate. ** This project is in aid of the federal government. It is arbitrary and capricious not to emphasize more fully the federal security aspects of the project. ** The corollary is that if the project is in pursuit of national security, there ought to be governmental immunity. ** Second, update and/or reformat the noise and vibration predictions and contours to make the information more understandable to the public. ** The science must avoid being presented as arbitrary and capricious and incomplete. ** The EIS might greatly benefit from adopting the format and structure of of the noise and vibration analyses in the DRAFT ENVIRONMENTAL IMPACT STATEMENT SPACEX STARSHIP-SUPER HEAVY LAUNCH VEHICLE AT LAUNCH COMPLEX 39A at the Kennedy Space Center, Merritt Island, Florida Volume II, Appendix C.1, Part 1 August 2025
8
256
#SpaceXStarshipSuperHeavy #NoiseandVibrations #SEISforOperationsPermissions #Comment SpaceX Starship-Super Heavy Operations at Space Launch Complex 37 at Cape Canaveral Space Force Station, Cape Canaveral, Florida Docket Number FAA–2026–10792, 91 Federal Register 61551, September 29, 2026; Scoping for SEIS-key issues: noise and vibrations; Comment deadline: October 14, 2026 DEPARTMENT OF TRANSPORTATION Federal Aviation Administration [FAA–2026–10792] Office of Commercial Space Transportation; Notice of Intent To Prepare a Supplemental Environmental Impact Statement (SEIS) and Open a Public Scoping Period for the SpaceX Starship-Super Heavy Operations at Space Launch Complex 37 at Cape Canaveral Space Force Station, Cape Canaveral, Florida NEPA and NUMERICAL STANDARDS: This Scoping Notice is a process conducted under NEPA (National Environmental Protection Act), which is a set of environmental procedural statutes. NEPA itself is not action forcing, but usually there will be numerical standards in specific Statutes or Regulations that are being viewed and approved for compliance. ACTION TO DATE: An EIS (Environmental Impact Statement) was prepared; description from FR follows. This is a specific procedure: NOI (Notice of Intent) to prepare a SEIS (Supplemental Environmental Impact Statement) and notice of public scoping period. Usually no construction or appropriation of funds is authorized until the overseeing agency issues a ROD (Record of Decision) approving the project. The ROD is withheld by FAA until the SEIS community impact issues are resolved. MODIFICATION TO EIS: Space Exploration Technologies Corp.’s (SpaceX) proposal obtain a modification to their existing vehicle operator license from the FAA to authorize commercial Starship-Super Heavy operations at Space Launch Complex 37 (SLC–37) at Cape Canaveral Space Force Station (CCSFS). LAUNCH & LANDING CADENCE. The proposed operations would include up to 76 Starship-Super Heavy launches and up to 152 landings per year (up to 76 Super Heavy Booster and up to 76 Starship vehicle landings), including return-to launch-site (RTLS) and ocean landings. SUPPORT OF EIS AND SPECIFIC IMPACTS. This SEIS supports FAA’s adoption of the Final Environmental Impact Statement for the SpaceX Starship-Super Heavy Cape Canaveral Space Force Station (2025 DAF EIS), EIS Identification Number: EISX–007–057– USF–1730277197. The scoping notice states that among impacts to be viewed in the context of the modification will be airspace closures, flight paths, and statutes. RECENT SUBSTANTIVE LAW AND REGULATIONS: “Commercial Space Launch and Reentry Regulations: Overview and Select Issues” 06/23/2025 ROADMAP: The statute provides a roadmap to follow among other things: The FAA license evaluation process has five major components. Under both Part 450 and the legacy regulations, the FAA conducts a safety review, in which it assesses potential risks to public health and safety; policy review, in which it consults with DOD, the Department of State, and other agencies to assess potential issues affecting U.S. national security or foreign policy interests; payload review, in which the FAA and relevant agencies review onboard payloads with respect to public safety, national security, and foreign policy interests; financial responsibility requirements, in which the FAA requires operators to demonstrate financial responsibility for the maximum probable loss expected to occur; and environmental review, in which the FAA analyzes potential environmental impacts. Licensees are also required to coordinate with the FAA Air Traffic Organization (ATO) on potential impacts to the national airspace. FAA LAWS AND REGS: Commercial Space Transportation Legislation and Policies National Legislation 51 USC Ch. 509: Commercial Space Launch Activities 51 USC Ch. 511: Space Transportation Infrastructure Matching Grants National Space Transportation Policy National Space Transportation Policy (08/20/26) Commercial Space Policy SCIENCE: Spacecraft licensing requires a multi-disciplinary blend of engineering and science to ensure safety, regulatory compliance, and operational viability. This NOI states it recommends the EIS be adopted and the SEIS analyze airspace closures, flight paths, and statutes (so we can go back to the EIS as one source for science and data.). We are told to focus on this problem. The launch of space craft generates extreme conditions, such as vibrations and acoustics that can affect the launch pad, space craft, and their payloads. The noise at launch and during the two-minute liftoff and transonic climb phase causes intense acoustic loads. These acoustic loads are the result of an intense acoustic environment generated by the interaction of the rocket-engine exhaust stream mixing with the atmosphere. Pyroshocks, that occur when spacecraft vehicle stages separate, cause additional vibration problems These studies bring in materials science and structural engineering. Apart from the impacts on the human communities, we must also consider the impacts on all the rockets resulting from vibrations. (You may wish to refer to the EIS to see what coverage is available particularly in numerical exhibits. Also vibrations and noise are to be central. The rockets and appurtenances need supreme protection from vibrations. I had referred to a technical paper that may be helpful. Deadline: October 14, 2026. Submit your comments electronically: regulations.gov. Search for the docket above ‘‘[FAA–2026–10792] ============================ ABOUT SCOPING: NEPA scoping proceeding: The core purpose of a scoping proceeding is to gather input from the public, community stakeholders, and regulatory agencies to determine the specific range ("scope") of environmental, social, and economic issues that must be thoroughly analyzed before a project can move forward You should include a preference for format(s) in your comments: How do you want the meetings (probably more than one) to be conducted. Agencies use different methods to conduct scoping, such as: public meetings conference calls formal hearings informal workshops opportunities to submit written comments ============================ SOURCES: faa.gov/space/legislation_re…
2
4
530
#DATACENTERS #AUDITSFORTXDATACENTERS September 23, 2026 @GregAbbott_TX The Honorable Greg Abbott Governor of the State of Texas Office of the Governor P.O. Box 12428 Austin, Texas 78711-2428 Ph: (800) 843-5789 Distribution via email to **TCEQ Executive Director Kelly Keel **Texas Water Development Board, Bryan McMath, Executive Administrator **ERCOT, Jeff Billo, Vice President of Interconnection and Grid Analysis **Hon Ted Cruz, US Senator COMMENTS RE COMPREHENSIVE AUDIT OF AND MORATORIUM ON DATA CENTERS; NEED FOR WATER STUDIES AND PUBLIC MEETINGS AND HEARINGS Dear Governor Abbott: I respectfully submit the following response to your September 21, 2026, letter to TCEQ Exec Dir Kelly Keel regarding agency audits for Texas data centers. I strongly support data centers in Texas. You had called for audits by the various administrative agencies as a condition precedent to issue of any required permits. I also support the opportunity for stakeholder notice and comment before the water agencies with statutory obligations and authorities in such projects as well as mitigation of damages caused by such projects to get notice out on the table at the administrative level and out of the private action and litigation level. We should note first that according to the American Society of Civil Engineers, Drinking Water Infrastructure -2025 Report Card for America’s Infrastructure (infrastructurereportcard.org…) many water utilities have huge unnecessary losses of water and lose between 10% - 30% of fresh water annually due to outdated infrastructure. ASCE awarded a grade of C- for this segment of our infrastructure. This is in the face of massive funding efforts and supposed pay as you go efforts to upgrade municipal systems. Funds have been misapplied and should be part of the audit bucket. Citizens of Texas should be made aware of and demand corrective action through the TCEQ and TWDB apart from any data center efforts or need to plan and allocate surface and ground water. But hearings and public outreach should be conducted over this water infrastructure along with the specifics of data center plans for water use. The data centers should have imaginative, efficient 21st century plans for surface water use and recharge for any ground waters . ERCOT is doing everything it needs to do to fill its statutory duty to provide studied planning and adequate resources while providing for public input for its rules and protocols and should pursue the path it is on. ERCOT has been engaging in detailed transmission and interconnection studies and outreach for a massive transmission expansion across the State that impacts transmission beyond that for data centers. ERCOT, with public participation, has developed NERC standards and market rules for the resources that will provide energy to the data centers for projects that require interconnection. Many data centers may be behind the fence, and those centers will have minimal impact with the ERCOT grid. I do think TCEQ, with its responsibilities for surface and groundwater and science-based methods, has the broadest role to play in treating water issues including data center usage and rate structures and repair of the massive losses of water due to aging infrastructure. It would be best to designate TCEQ as lead in any audit work and outreach efforts. There will be compliance issues, but new regs are probably not necessary at this time. The audits can reduce interference by the plaintiffs bar in Texas and should shield both the agencies and the data centers from litigation. Respectfully submitted, /s/ Carol Caul Houston TX SBT, SDTX, USCA-5, SCOTUS
5
9
1,081
#ISAIEC62443Standards #StandardsforEnergyandChemistry #AirGapping ISA/IEC 62443 Series of Standards – Dispelling Major Cybersecurity Myths: Air Gapping et al ISA/IEC 62443 is the leading international standards for OT cybersecurity. The ISA/IEC 62443 standards set best practices for cybersecurity and provide a way to assess the level of security performance. This standard is used in many manufacturing and energy processes. The following information was taken from Unraveling Cybersecurity Myths in Chemical Manufacturing, Chemical Engineering, Marco Ayala, June 2026, p 15, and as published by his similar articles online. chemengonline.com/unraveling… ISA Fellow Marco Ayala debunks common misconceptions that leave operational technology (OT) vulnerable. Much of the content in this post is attributable to Mr Ayala and is found in this and similar posts COMMON CYBERSECURITY MYTHS Air-gapping: Believing control networks are completely isolated ("air-gapped") ignores hidden connections like vendor diagnostics, wireless instruments, and portable media. A digital intruder slips in through the vendor's or integrator's remote access to the enginering application server. This remote access may have been understood to be "just for diagnostic purposes." Proprietary protocols: Relying on obscurity or firewalls fails because sophisticated malware (like TRITON or Stuxnet) can reverse-engineer protocols, and perimeter defenses are bypassed by phishing or infected vendor laptops. Safety systems: Assuming safety instrumented systems (SIS) protect against cyber threats is dangerous, as adversaries can target the SIS directly if it shares a network with basic process controls. IT responsibility: Viewing cybersecurity solely as an IT issue misplaces risk; automation and process engineers must own operational resilience because patching and segmentation directly impact physical plant behavior. The Four-Step Path to Resilience (3 Steps here) Map assets: Use the International Society of Automation ISA/IEC 62443 zones-and-conduits model to inventory all physical and digital pathways Integrate risk assessments: Combine cybersecurity checks with existing Process Hazard Analysis (PHA) and Layer of Protection Analysis (LOPA) programs. Segment networks: Isolate safety systems and critical controllers into dedicated, controlled security zones. A CASE STUDY: “Unraveling Cybersecurity Myths in Chemical Manufacturing: A Path to Safer, More Resilient Operations” Marco (Marc) Ayala. 12 August, 2026 “When digital intruders target the physical world: Picture a petrochemical plant running steady in the dead of night — pipes humming, reactors holding pressure, safety systems standing watch over exothermic reactions that could release toxic clouds or trigger runaway events if anything goes wrong. Then a digital intruder slips in, not through the fence but through a vendor’s or integrator’s remote access to the engineering workstation or application server that someone thought was “just for diagnostics.”’ Safety systems start to blink. Pressures climb. Critical alarms that should be screaming are suddenly suppressed or inhibited, then buried in an overwhelming alarm flood. What should have been another routine shift suddenly edges toward potential disaster. "This isn’t a movie script. In 2017, the TRITON (or TRISIS) malware hit a Saudi petrochemical facility and went straight for the Schneider Electric Triconex safety instrumented system (SIS). The attackers — later tied by the US Treasury to a Russian government research institute — reverse-engineered the proprietary TriStation protocol, exploited a zero-day and tried to reprogram the very controllers that keep explosions and toxic releases from happening. 'Only a coding slip that tripped the SIS into safe shutdown saved the day.'” ========================== SOURCES: isa.org isagca.org/isa-iec-62443-sta… automation.com/article/unrav… chemengonline.com/unraveling…
2
7
1,085
#NERCComputationalLoadEntity #NERCStandards #Interconnection #DataSharing New NERC Computational Load Entity" (CLE) Rules Project 2026-02 Computational Loads; Vote by Sep 18, 2026 New Registration: Under Project 2026-02 Computational Loads, NERC is establishing a new functional category called Computational Load Entities (CLEs) and implementing standards, CLO-001-1 being the bell cow. Under this NERC project, large loads are subject to direct NERC oversight if they meet the following **capacity, **interconnection, and **function criteria--as of now interconnection is a key threshold—(wholly behind the meter facilities without an interconnection are likely exempt, but see the NERC caveat below re impacts of unconnected operations and think about how hard it is to separate the facilities from utility requirements for utilities (loads); there should be none): Applicability Thresholds: Facilities are generally evaluated for applicability based on **an aggregate connected load of 20 MW or more, **hosting at least 1 MW of IT/compute load, and **connecting to the BPS at 60 kV or higher. PURPOSE OF NEW REGISTRATIONS AND STANDARDS: As quoted by NERC: “Computational Load Sites, such as data centers (including cryptocurrency and artificial intelligence), present unique challenges in forecasting and planning for increased demand. Specifically, Computational Load Sites can be large and have unique operating characteristics, growth patterns, controls, and disturbance response behaviors. These characteristics can pose unique risks to the Bulk Power System as detailed in the NERC Large Load Task Force Whitepaper ‘Characteristics and Risks of Emerging Large Loads” in July of 2025.’” Possible Applicability: Behind-the-Fence Impacts: NERC has noted that sudden, customer-initiated load drops or oscillations from large facilities—including those with behind-the-fence dynamics—can destabilize the wider power grid. (SEE BELOW FOR QUALIFYING STATEMENT FOR UTILITY-CONNECTED LOADS) RELATED INCIDENT: LEVEL 3 ALERT: The Level 3 Alert was issued as NERC observed customer-initiated large load reductions and significant oscillations that occur in seconds, leaving little or no room for real-time responses, threatening BPS reliability. SPECIFIC STANDARD: Reliability Standard CLO-001-1: Computational Load Interconnection, Studies, and Modeling CLO-001-1 PURPOSE OF Project 2026-02: Project 2026-02 is to establish Reliability Standard CLO-001-1 to address the near-term essential actions needed to support the reliable integration of large Computational Load Sites onto the BPS. Reliability Standard CLO-001-1 describes Reliability Standard requirements associated with interconnection requirements, including commissioning, interconnection studies and coordination, and transmission planning modeling data. NERC LARGE LOAD ACTION PLAN: FERC issued an order directing NERC to file mandatory standards specifically targeting these large loads. If a behind-the-fence load triggers the registration criteria, it must directly comply with newly introduced foundational standards, including: CLO-001-1: Interconnection, modeling, and system studies. CLO-002-1: Operational data sharing and communication protocols with grid operators. CLO-003-1: Protection coordination and grid disturbance monitoring. Note the data sharing. ======================================= How FAC-001 Applies to Non-Utilities Because NERC regulations target the physical hardware impacting the Bulk Electric System (BES), many non-utility companies must comply with FAC-001. Independent companies fall under this standard if they hit NERC registration thresholds, including:] Independent Power Producers (IPPs): Private developers or private equity firms owning large-scale solar, wind, or natural gas plants. Industrial Facilities: Large manufacturing plants, chemical facilities, or refineries that generate their own power on-site and connect directly to high-voltage transmission systems. Large Data Centers & Crypto Mines: Emerging "computational loads" and large tech campuses that build their own dedicated high-voltage substations or generation assets can trigger NERC registration requirements. As a clarification, even if a behind-the-fence load is not directly registered as a CLE, it faces strict regulation indirectly through its interconnecting utility (if the facility serves a connected load). Transmission operators and utilities are required to treat large co-located or behind-the-fence loads as dynamic participants. This means the facility must cooperate with grid operations regarding customer-initiated load reductions (CILR), voltage-sensitivity, and frequency ride-through capabilities. INDUSTRY STANDARDS, NOT YET NERC: Additional, more stringent rules, currently industry standards below NERC, may apply for more "fragile" industries. Industry standards such as SEMI F47 ( minimum voltage sag immunity requirement) and IEC 61000 provide guidelines and performance requirements for equipment voltage sag immunity and electrical system performance. [VOTING DEADLINE: September 18 2026 Initial ballots for the Standards, Implementation Plans and non-binding polls of the associated Violation Risk Factors and Violation Severity Levels are open through 8 p.m. Eastern, Friday, September 18, 2026. Registered entities must submit answers to 33 questions on computational load integration, tied to NERC's May 2026 Level 3 Essential Action Alert.] GUIDELINES: NERC released new voluntary guidelines to safeguard grid reliability. The Reliability Guideline: Risk Mitigation for Emerging Large Loads ============================ SOURCES: nerc.com/standards/reliabili… nerc.com/globalassets/standa…
3
6
322
#ERCOT #SolarCliff #BESSPerformance #TexasEnergyFund August 23, 2026. ERCOT, The Solar Cliff, BESS Performance and Market, & Texas Energy Fund This is about ERCOT solar and BESS resources, weather, time, and the dispatch stack on August 23, 2026. ERCOT Capacity: **Thermal Capacity (Natural Gas, Coal, Nuclear, and others): ~87.4 GW **Renewables & Storage (Wind, Solar, and Battery Energy Storage Systems): ~84.1 GW ERCOT is structured as an energy-only market. There is no centralized capacity payment and no guaranteed revenue for being available. Thus, assets are paid based solely on merit, market constraints, bidding strategies, and the dispatch stack. The Event: Solar Cliff and BESS On August 23, 2026, ERCOT reached a record weekend peak demand of 90,411 MW. Peak demand accounted for approximately 79.3% to 80.0% of ERCOT's total available system capacity (113,000 to 114,000 MW during that period). Key Grid Metrics for August 23, 2026 Weekend Peak Demand Record: 90,411 MW (unofficial settlement) Estimated System Capacity: ~113,000 – 114,000 MW (excluding ancillary services) Ancillary services are now co-optimized in the Real Time Market Weather Conditions and Grid Performance: Low wind output (~6,700 MW) during high-temperature afternoon hours Solar’s contribution (~33,000 MW) and battery storage kept the grid stable without requiring any energy emergency alerts or conservation appeal Solar Cliff and Weather and Time: During the day on August 23, 2026, massive utility-scale solar generation carried a significant portion of the Texas grid's ~90 GW peak load. However, as solar generation rapidly ramped down in the late afternoon (the "solar cliff"), the grid faced a compounding reliability challenge: *Wind Generation Shortfall: Wind came in significantly under forecast, providing over 2.5 GW less than what was anticipated during Day-Ahead Market (DAM) clearing. *Extreme Demand: High temperatures kept air conditioning load sustained at near-record levels late into the evening. What happened with BESS As solar exited the resource mix and wind underperformed, ERCOT had to rely on its ancillary service stack, particularly ECRS (which requires resources to respond within 10 minutes) and standard regulation services to maintain the grid's frequency. Battery Discharge Peak: Battery Energy Storage Systems (BESS)—many of which carry ECRS obligations—discharged heavily to fill the gap left by solar and wind. Total battery discharge on the grid peaked at 19:50 (7:50 PM). The Price Peak Lag: Because ECRS and battery capacity have finite durations (often 1 to 2 hours), the grid's State of Charge (SoC) began running lower later into the evening. Consequently, real-time electricity prices actually peaked at 21:00 (9:00 PM)more than an hour after battery discharge had already peaked—as economic dispatch moved higher up to the thermal offer stack. The bidding changes that allow rapid responsiveness to weather: ERCOT officially went live with Real-Time Co-optimization Plus Batteries (RTC+B) on December 5, 2025. RTC+B allows ERCOT to simultaneously co-optimize energy and ancillary services every five minutes in real-time, while better modeling battery storage resources and their available states of charge. (Prior to December 5, 2025, ancillary services bids were set in the Day Ahead Market (DAM). Behind the fence thermal or BESS resources usually do not count as ERCOT Capacity. Grid connected resources meeting NERC Standards may be too rough for large loads such as the manufacture of chips or may require batteries install inside the fence on the distribution side. Those batteries do not count as ERCOT resources unless they are also hooked up to provide ancillary services to ERCOT. • It is said that batteries may replace gas-fired peakers. That may be. One constraint is that a single battery will have a discharge time of perhaps 3 hours, with state of charge factors intervening, while a peaker may be able to run indefinitely. But just like peakers, batteries can be arrayed in parallel to mimic expanded run time. Example connect two 12V 100Ah batteries in parallel create a 12V 200Ah system, doubling your runtime. (Check with Grok) Texas Energy Fund But counteracting that, we have the Texas Energy Fund (PURA §25.510. Texas Energy Fund) In-ERCOT Generation Loan Program. largely to supply data centers. Natural gas peakers are experiencing a significant comeback in the Electric Reliability Council of Texas (ERCOT) grid. This momentum is largely driven by a massive influx of data center interconnections and new financing options from the Texas Energy Fund (TEF). I do not see anything about the Texas Energy Fund loan peakers that enable them to handle the fragility of chips plants as well as batteries can provide service. I also do not know whether the Texas Energy Fund loan will be treated as a proxy for a capacity payment, thereby undermining batteries. ============================ SOURCES: *congestion pricing lecture: ERCOT 09/09/26 *general knowledge *ercot.com/files/docs/2026/05… *pexapark.com/blog/ercot-cont… *modoenergy.com/research/en/e… *enverus.com/blog/ercots-augu… *modoenergy.com/research/en/e…
1
6
639
#VoterRegistrationDeadlines Please register to vote and get out and vote, either during early voting (preferable) or on election day, the earlier the better, to bank numbers; the Dems do this as a suppression tactic, but also something might arise on election day. If you have not voted in a few elections, check whether you are still registered. Some states drop you. Ballotopedia has excellent info re the candidates and voter registration info across the country. Here is a table of latest dates to register, or see the Ballotopedia site.
5
345
#ElectricPowerTransmission #DOENationalTransmissionNeedsStudy Comments on the DOE’s July 2026 National Transmission Needs Study Draft for Consultation and Public Comment Here is the intro and ptn of toc for the comments regarding key items of the Department of Energy (DOE) Transmission Study. It was my position that FERC Order 1920 and NERC Transmission Standards were vastly more helpful to anyone needing transmission capacity for load growth or congestion mitigation. This document is good to take to orgs such as BlackRock or JPMorgan for due diligence for money. BACKGROUND: As of July 2026 the current transmission system in the contiguous United States is estimated to be 526,028 circuit-miles, as calculated by summing the length of all lines greater than or equal to 69 kV from the Homeland Infrastructure Foundation-Level Data (HIFLD) spatial data for transmission. The 85,000 circuit-miles added since 2016 would represent 16% of total existing circuit-miles.
7
252