Railway Technical (@railwaytechnic) profile picture

Founded in 1994, Railway Technical Web Pages has become the world's most widely respected international railway technical and operational information website.

Britain
Joined July 2011
Photo by Railway Technical (@railwaytechnic)Photo by Railway Technical (@railwaytechnic)Photo by Railway Technical (@railwaytechnic)Photo by Railway Technical (@railwaytechnic)Photo by Railway Technical (@railwaytechnic)Photo by Railway Technical (@railwaytechnic)Photo by Railway Technical (@railwaytechnic)Photo by Railway Technical (@railwaytechnic)Photo by Railway Technical (@railwaytechnic)Photo by Railway Technical (@railwaytechnic)
If a black hole points to the end of time and there are many black holes, are they all pointing to the same end of time. #horizonslive
Railway Technical retweeted
Congrats to whoever pulled off this master stroke! A pox on all their houses. Superb little vid!!👏👏👏👏👏👏👏👏 – at Tallington, England
4
13
42
I'm sitting behind Eric Treacy pounding out of Whitby on the 14:00 to Pickering. What a magnificent sound of locomotion.
Railway Technical retweeted
We’re renewing the railway, near some freight terminals. In a short section there's a level-crossing, followed by a bridge, a level-crossing, another bridge then another level-crossing. Simply for bridges we want the wire low, but for level-crossings we want the level high (2/9)
1
2
8
Railway Technical retweeted
Brilliant piece on the Tay Bridge disaster by @PaulMBigland in Rail 914 @RAIL Disaster ultimately led to understanding of wind loads that forms the basis of my discipline of wind engineering.
5
5
1
19
Railway Technical retweeted
Did you know the contact wire in over head line electrification is staggered so that pantographs don't wear in the same place. You can start a staggering rolling programme of electrification by authorising completion of the Midland Main Line electrification. – at Welwyn Garden City, East
It takes 15 minutes for my mate to walk to the pub and 30 minutes for him to walk home. The difference is staggering.
5
12
122
Railway Technical retweeted
Replying to @RAIL
Without sounding all "dont forget about us"- ish..... it needs major concentration doing 3 trips a day between London Bridge and West Croydon via peckham Rye calling at all stops, passing yellows and stopping at loads of reds, operating doors (without a guard)😉
1
1
3
Railway Technical retweeted
1/I've been giving more thought to media coverage which either at worst directly implies Driver Brett McCullough was going too fast (he wasn't) or at best leaves the unpleasant whiff of the question hanging in the air. It does come from judging rail speeds as road speeds are
56
167
70
528
I've just seen a complete Class 91 IC225 set with an HST loco at each end passing MMO. On 544S to Leicester. Sorry I didn't get a photo. I was oiling the decking.
1
2
"A feature of the BR Summer 1963 East Coast timetable was the ability for Northern businessmen to have six hours in London without staying away overnight." Example of a passenger-focused railway: conduct research to understand what people want and then act on it.
A feature of the Summer 1963. East Coast time table was the ability for Northern businessmen to have six hours in London without staying away overnight. To do this trains left London later and ran non-stop to York in 3 hours. As near as dammit 63 mile/h average.
5
12
1/3Whilst researching the history of signalling on London Underground, I noticed that the use of the word 'cabin' in reference to a signal box seemed to be much more common on LU than on main line railways. But, they still called the lads who booked trains 'box boys'. I suppose
1
1
2/3calling them 'cabin boys' might have been difficult for any lad called Roger. More seriously, I thought cabin was an LU derived term but my research showed that the term was already used by railways as early as in Proc. ICE, Preece, W., et al 1863.
1
3/3 Even LU struggled to decide what to call them. They used the term 'cabin' at least as early as 1910 on line diagrams but they used 'box' in traffic notices as late as 1990. Now, they're nearly all gone. My articles on the history appear in Underground News each month.
Railway Technical retweeted
I spoke too soon. Just get on and authorise completion of the Midland Main Line electrification before the skilled installation teams on the Bedford-Kettering wiring run of work, there's a good chap. – at Welwyn Garden City, East
What do you call two monkeys who sneakily share a premium Amazon account? Prime mates.
4
5
69
Replying to @holdmch
Lack of people who understand how to run a railway my friend. The knowledge gap is huge. There are more of us on Twitter who can do it than there are in the Dept.
1
2
10
Railway Technical retweeted
A new post-COVID manifesto for rail in just 8 concise points, excellently curated by Chris Stokes in August’s @Modern_Railways
14
10
3
52
Railway Technical retweeted
@IconsOfSteam Class 47 47593 'Galloway Princess' gets away from @northernassist #settle at the head of @CharterRail Appleby to Skipton 'Staycation Express on 21st July 2020 @cheggs1978 @Richard_rail @railcamlive @RAIL @chris_railway @railwaysillus @Modern_Railways
1
9
Railway Technical retweeted
Replying to @LilianGreenwood
@LilianGreenwood If you bump into this Parliamentary punster could you pass on the message that the extension of the Midland Main Line electrification to Derby, Nottingham and Sheffield is shovel ready and will he authorise it. – at Welwyn Garden City, East
What kind of cheese is made backwards? Edam.
1
1
4
Railway Technical retweeted
A thread. Some thoughts on the railways after Covid. If threads can ramble, this one will. Basic question is whether passenger numbers will recover. There is a strong possibility they won’t because a) home working for many has been shown to be feasible and attractive; 1/
1
2
1
Railway Technical retweeted
This article is misleading - it's safe to travel by train and all the train companies including @LNER are working hard to keep everybody safe teapaw.org/AlastairDalton/status/…
7
43
4
111