I went back to write the exams in pain. God did! I'm getting much better now and I'm hoping for full recovery.
Sickle cell might have won the battle, but I've won the war.
Reintroducing myself: Audu Joshua Oluwaseun (PMNIQS) B. Tech Quantity Surveying, FUTA (Hons) 4.43/5.00
YourOnlineQuantitySurveyor. retweeted
Measurement Hack 101:
Working with drawings that lack sufficient design information can make you assume that incomplete details are the norm.
Don't let repeated exposure to inadequate drawing information make you overlook essential details. Always scrutinise drawings thoroughly before making reasonable assumptions where necessary information is genuinely missing.
YourOnlineQuantitySurveyor. retweeted
If not for quantity surveying, what would I have become? 😂 To think I knew absolutely nothing about the course when I selected it on my PCE form that year! 😀
WHY ROOF AREA IS NOT THE SAME AS FLOOR AREA
Your building has a floor area of 150m².
Does that mean you need 150m² of roofing sheets?
Not necessarily.
Roofing measurement is based on the actual sloping roof surface, not simply the horizontal floor area.
Before estimating roofing materials, consider:
🔹Roof pitch (slope).
🔹Number of roof sections.
🔹Length of overhangs.
🔹Hip, valley and ridge details.
🔹Roofing sheet profile and effective coverage width.
🔹Cutting and laps.
A building with a simple roof design may require less roofing material than another building with the same floor area but a more complicated roof structure.
Never estimate roofing sheets from floor area alone.
Save this before your next roofing estimate.
Replying to @AwolowoSenator
Column bases with its ancillaries will humble you. Alot of hidden materials, labour and uncertainty will definitely happen with more columns.
What about concrete and it's ancillaries?
YourOnlineQuantitySurveyor. retweeted
10 THINGS WORKING WITH LABOURERS ON A CONSTRUCTION SITE HAS TAUGHT ME. SOME LESSONS WERE EXPENSIVE.
1) Never pay labourers their full money before the agreed work is completed.
2) Never assume work will be done properly just because they claim they know how to do it.
3) Set deadlines and hold them accountable. Don’t always wait for excuses.
4) Be kind, but never let kindness make you lose control of your site.
5) Don’t believe every story you hear. Verify things yourself.
6) Don’t let pity make you overlook poor performance.
7) Don’t casually lend out your tools and equipment. Keep records or rent them out with clear terms.
8) Don’t disclose your entire budget or financial position on site.
9) Sometimes, buying food for your workers goes a long way. Treat people well.
10) Supervise their work closely. Don’t assume everything is going according to plan.
A construction site requires more than money and materials. It requires wisdom, patience, discipline and firm management.
YourOnlineQuantitySurveyor. retweeted
It was an honour walking you through the process of creating PlanSwift plugins, my leader.
The plugins I had were having some errors, which I’d been wanting to fix, until I stumbled upon this tweet.
I linked up with my guy, @Emmymouthpiece, over the weekend, and he put me through.
Ladies and gentlemen, I’m in the kitchen now! All thanks to him. 😤👷🏾♂️
This new role is kind of interesting, though.
No more staying late on-site. I go to site at my own pace, whenever it’s convenient.
My phone is no longer buzzing with calls from suppliers and engineers.
No more chasing deadlines with sanctions attached. 😤
My company says, “Enough of you being a Quantity Surveyor. We need you as an Assistant Project Auditor for construction projects!”
Well, let’s see how this goes. 😌😩
2
7
269
YourOnlineQuantitySurveyor. retweeted
Replying to @AwolowoSenator
That's what people don't understand, a lot of unseen items affects the cost of a project
The plugins I had were having some errors, which I’d been wanting to fix, until I stumbled upon this tweet.
I linked up with my guy, @Emmymouthpiece, over the weekend, and he put me through.
Ladies and gentlemen, I’m in the kitchen now! All thanks to him. 😤👷🏾♂️
Building A: 210m², with 21 columns,
Building B: 160m², with 32 columns designed
You’d expect Building B to cost less because of its smaller size, but that’s not always the case.
Construction costs depend on several factors, with the size of the building being just one of them👷🏾♂️
YourOnlineQuantitySurveyor. retweeted
Not all science students have to study medicine, some of us have to hold it down in Quantity Surveying.
YourOnlineQuantitySurveyor. retweeted
It's time to start looking for a final-year project topic.
If you have any tips on how to choose a project topic within your area of interest, kindly share them.
I'd really appreciate your suggestions.
Thank you.
@WithBukky
Mondays are always less productive. One meeting after another, setting targets and goals for the week. 😞
Cheers to a new week!🥂
In one of his interviews, Aliko claims he has owned a private jet since the age of 22. I’m not surprised, sir.
Aliko was 41 when MKO Abiola died in 1998.
Abiola was arrested in 1994, so that meant this meeting with him was before his arrest.
So let's say it happened in 1992 (before the 1993 elections).
Aliko was 35 in 1992.
So, by his early 30s, he was already important enough a business figure to be visited at home by the richest man in the country.
1
105
What I believe your brother could do instead is learn structural design software. As a fresh Civil Engineering graduate with limited work experience, this could improve his chances of securing an entry-level role in a construction company.
I’ve told my younger brother @Ganaseyi to take Jamb form and apply for Medicine and Surgery or Pharmacy just the way I applied for Law.
He’s feeling reluctant like I did back then. I don’t want to talk to him again. When the time is right, he will do the right thing. Because obviously, the Civil Engineering he studied is not paying his bills yet and I don’t know when it will.
I hope he takes this brotherly advice seriously and do the right thing.
I don talk my own shaa
How were you even able to develop that habit as a Quantity Surveyor? 😂
Because I’m already imagining the kind of things that could happen if my phone were on silent.
Dem for don tire down engineer on site.
Materials might not get to site.
Some contracts could be lost.
E.t.c
But one day, this habit almost cost me a contract.
I was going about my normal activities when my phone started receiving calls. Since my phone was permanently on silent, I didn’t notice anything.
My client called once, 2ce and Then several times.
I missed every single call.
Apparently, he was trying to reach me concerning a contract he wanted to award to us. By the time I checked my phone, I had multiple missed calls staring back at me.
Everywhere first blurred, because I was expecting the call
Imagine losing a contract simply because your phone was on silent. 😭
Thankfully, this man sent me a WhatsApp message.
Since that day, I’ve realised something:
Your phone being on silent is peaceful until the person calling you is bringing money. 😂
118
I can only wish the site engineer and the carpenter the best with this roofing work!
I had quite a challenge taking measurements for this roof. So many joints aren’t aligning! 🤧
Outlook is down globally right now (Microsoft 365 outage affecting Exchange Online).
For most people it’s annoying. For a QS, it can delay BOQs, valuations, variation claims, client updates, and contractor communications and in this industry, delays cost real money.
Quick workarounds I’m using today:
🔹WhatsApp / Telegram for urgent site, client & contractor updates (we already live here in Nigerian construction)
🔹Google Drive / Google Sheets links to share BOQs, cost reports & supporting documents
🔹Personal Gmail as a temporary formal channel
🔹Phone calls for anything that needs immediate decision or approval
Longer-term lesson:
Don’t put all project communication on one platform. Having Google Workspace or Zoho Mail as a backup (or primary) reduces this kind of risk.
Pair it with shared sheets and simple automation so your workflow doesn’t freeze when one tool goes down.
In QS work, resilient systems = better cost control and fewer payment delays.
What are you using while Outlook is down?
#QuantitySurveying #ConstructionNigeria #MicrosoftOutage #QS
Dear @Outlook,
Nigerian workers are already fighting electricity, network issues, and deadlines.
Now you’re joining the struggle? 😭
Please, we didn’t budget for this level of frustration today.
Fix up, we have work to submit.























