Photo by Modo Energy (@ModoEnergy)Photo by Modo Energy (@ModoEnergy)Photo by Modo Energy (@ModoEnergy)Photo by Modo Energy (@ModoEnergy)Photo by Modo Energy (@ModoEnergy)Photo by Modo Energy (@ModoEnergy)Photo by Modo Energy (@ModoEnergy)Photo by Modo Energy (@ModoEnergy)Photo by Modo Energy (@ModoEnergy)Photo by Modo Energy (@ModoEnergy)
Monday was a big day for energy policy nerds. I finally got through the (dozens of) show cause responses this week at @FERC. One big takeaway: curtailment. Four ISOs propose a new class of non-firm transmission service. A data center on it connects with the stipulation that it curtails under certain grid conditions. MISO, NYISO and ISONE would set those conditions with a price threshold: $100/MWh in MISO, $200/MWh in NYISO and $250/MWh in ISONE. These are not emergency-level prices. MISO’s threshold is the first step of scarcity pricing. Since July 2023, the average MISO hub has been above $100/MWh for 246 hours a year, and the average NYISO zone above $200/MWh for 164. Most data centers are designed for 99.99% uptime, under an hour of downtime a year. A campus on non-firm service would need on-site generation or storage to keep running through those hours.
2
5
26
2,137
Modo Energy retweeted
France: a 2-hour BESS earned an annualised €435k/MW/yr from April to September, when RTE nearly doubled the upward aFRR capacity it buys for the evening peak. Nearly 2 GW of fleet was in place to catch it, most of it built before spring.
3
5
17
644
Modo Energy retweeted
US BESS: China supplied 59% of lithium-ion battery imports in 2025, but switching to non-FEOC suppliers keeps the ITC. A US-made system runs $100/kWh above Chinese supply, and a 30% credit covers up to $125/kWh of that. The credit is worth more than the saving.
1
3
7
452
Modo Energy retweeted
Global battery production capacity is over 6TWh, production this year will be closer to 3TWh… Check out my discussion with @edcporter covering the latest across the battery supply chain ! youtube.com/watch?v=oa5QwsrS…
6
20
105
7,975
Modo Energy retweeted
Spain is one of Europe's most fascinating power markets. With annual solar capture rates around 50%, monthly capture rates as low as 15%, and room to add battery storage to the country's over 50 GW of installed solar. It has the opportunity to move extremely fast and near-completely decouple from gas, despite a small interconnection. Given the stress on some Spanish solar sites, I think this is also one of the most exciting acquisition opportunities if you have an edge in Spain. I'll cover all of this with the Modo Energy team in our livestream this Wednesday. If you want to attend the session, here's the link: lnkd.in/eZjyPZ8r
10
15
2
127
14,873
Had a fantastic afternoon with @edcporter and @ModoEnergy filming their Transmission podcast at this spectacular 400 kV indoor substation in London. Keep an eye out on their YouTube channel for our Christmas special 🎬😉
3
5
1
100
3,371
Modo Energy retweeted
Replying to @ModoEnergy
@ModoEnergy brings the French storage benchmark online.
France: a 2-hour BESS earned €328k/MW/yr to October 2026, second only to Poland in Europe. aFRR drove 75% of it. Two-thirds of that came in summer, when RTE lifted its evening upward aFRR buy from 800 to 1,500 MW. That block paid €125/MW/h against €24 the rest of the day.
1
2
3
328
Essential viewing for battery crowd / investors, covers everything from LFP to Sodium Conclusion ‘there’s no single price for chattery anymore, it depends where you are’ Usual excellent video from @ModoEnergy $eose $tsla youtu.be/oa5QwsrSigE?is=jtBe…
4
23
2,014
Modo Energy retweeted
US: 165 GW of tracked data center capacity, about 26% of the pipeline, sits in states whose incoming governor backs an immediate moratorium. But little of that is under construction or permitted. Pauses would mostly bar announced projects, not built ones.
1
5
2
19
910
Modo Energy retweeted
CAISO: battery revenues rose 52% to $3.09/kW-month in October, but the month was front-loaded. The first eight days, driven by an early heatwave that pushed demand to 46 GW on the 5th, accounted for nearly half the total. Batteries earned $349/MW that day alone.
1
4
1
14
606
Modo Energy retweeted
🎙️ October on Transmission: four conversations on how batteries get hedged, financed and connected. If one of these would be useful to a colleague, please send it their way. That’s how the show grows. Thanks for tuning in, and we have a superb lineup coming for you in November.
3
5
295
Modo Energy retweeted
🎧 Transmission: SSE and Statkraft ran a battery revenue swap: SSE took a fixed price and gave up the volatility, Statkraft took on the risk. It needs far less paperwork than a wind PPA, and both sides ended up with less risk. youtube.com/watch?v=CDQ_bEXu…
2
3
1
17
904
Modo Energy retweeted
Modo Energy published more than 60 research pieces in the last 30 days. Forecast updates, buildout reports, revenue benchmarks and market outlooks across GB, Europe, the US and Australia. That’s a lot to keep up with. It’s why we write a newsletter. Every Friday we send editions for the US, Europe and Australia. Each one rounds up the week’s biggest stories, with links to our latest research, livestreams and events. Over the next month, we have four livestreams coming up: → Polish Battery Market Outlook → European Solar Outlook: negative prices, capture rates and co-location → Key insights to finance Spanish storage projects in 2027 → Why data centres will transform the US grid but only use a fraction of the power they request To sign up and stay in the know on power markets, check out the Weekly Dispatch. share-eu1.hsforms.com/1kDKOq…
1
4
18
722
Modo Energy retweeted
Congratulations to the BW ESS team on closing financing for Hams Hall, and to all their project partners. It's really cool to see projects of this size come through, and I'm excited to see the scale of what's coming down the pipeline. At a time when our power markets are increasingly stressed and we need flexibility, this is the news we need to see.
5
11
485
Modo Energy retweeted
ERCOT: Modo tracks 92 GW of data center load in advanced planning as of October 21, spanning Dallas-Fort Worth into West Texas and the I-35 corridor. But these projects are heavily phased, so the timing and volume hitting the grid depends on how customer ramps actually land.
3
2
12
411
Modo Energy retweeted
Italy: a standalone battery takes about five years from first grid request to operation. The bottleneck is permitting at MASE, where median review time rose from 12 months in 2024 to 19 months in 2026 as requests piled up. Terna issues its grid offer in about two.
3
8
14
510
Modo Energy retweeted
🎧 Transmission: Germany: 50Hertz saw around 180 battery connection requests this year, more than 80 GW, roughly the country's entire peak demand. youtube.com/watch?v=bOx2N5Hl…
2
1
7
274
Modo Energy retweeted
Netherlands: a 2-hour BESS with full grid connection earned €305k/MW/yr over the first nine months of 2026. The jump from 1 to 2 hours adds the most, €92k/MW/yr, because it unlocks upward aFRR capacity. A 1-hour battery can't guarantee its aFRR obligation.
2
7
1
27
1,769
One of the best short documentaries I've seen explaining why the energy transition is no longer just about generation, it's about the grid and, increasingly, storage. #SWB #Bettrification #EnergyTransition Key takeaways: • Britain doesn't have a wind problem, it has a transmission problem. Scotland produces more wind power than the grid can carry south. • Consumers pay twice: wind farms are paid to switch off while gas plants are paid to switch on elsewhere. • Batteries are scaling rapidly but there still isn't enough storage to absorb surplus renewable energy during major grid constraints. • The solution is clear: more transmission, more batteries, more flexible demand like EV charging and AI data centres, and smarter market design. The lesson extends far beyond Britain. Curtailment isn't a failure of renewables, it's evidence they're growing faster than the rest of the system. The answer isn't less wind and solar, it's accelerating the infrastructure around them.
What happens when we produce too much power? Full documentary released on X
49
95
4
303
17,297
Modo Energy retweeted
Great Britain: Q3 2026 added 917 MW / 1,844 MWh of batteries, a record quarter that took the fleet to 8.5 GW / 14.4 GWh. Coalburn 1 came online at 500 MW, now the largest site in GB. Revenues held up too, with the ME BESS GB index up 23% as capacity grew 12%.