We are partnering with Palantir to bring trusted AI cloud infrastructure to Palantir’s commercial customers.
Palantir has named Nebius its preferred sovereign AI infrastructure partner.
Nebius compute and inference endpoints will run inside the Palantir enterprise perimeter – giving customers control over their compute, data, and models.
The partnership is based on a shared vision that open models, continually adapted using customers’ own data, can deliver better domain-specific intelligence while improving control and security.
Read the full press release: nebius.com/newsroom/palantir…
Stoggle Capital Management retweeted
Introducing Bloom Power Connect.
A new deployment system that reduces onsite power installation time by more than 40% by moving critical electrical integration from the field to the factory.
Pre-connected, pre-wired, and tested before arriving onsite, Power Connect simplifies installation, improves deployment consistency, and helps customers bring new power capacity online faster.
At a time when demand for skilled electrical labor continues to outpace supply, Power Connect helps customers move projects forward with greater certainty.
bloomenergy.com/news/bloom-e…
Stoggle Capital Management retweeted
$NBIS NEBIUS (NBIS): IMPLICATIONS OF PENNSYLVANIA’S DATA CENTER EXECUTIVE ORDER
BOTTOM LINE
The executive order is a direct, moderately negative development for Nebius, but it is not thesis-breaking and should not be interpreted as cancellation of the Pennsylvania project. Nebius is unusually exposed because its Highridge Business Park campus is a wholly owned, 600-acre development designed for 1.2 GW at full buildout, with 260 MW targeted for October 2027, 660 MW for January 2029 and more than 1 GW for November 2029. The 1.2 GW headline capacity is equivalent to 24% of Nebius’s newly raised 5 GW year-end 2026 contracted-power target. The first 260 MW is equivalent to approximately 26% of the company’s stated plan to deploy more than 1 GW per year beginning in 2027.
The primary risk is not an immediate reduction in 2026 revenue or EBITDA. Highridge was not scheduled to become operational until late 2027, and Nebius reiterated its 2026 financial guidance several days before the order. The order principally raises the probability of delays, additional power-procurement costs, more onerous contractual liabilities and lower returns on the 2028-2030 Pennsylvania capacity ramp. The direct 2026 earnings impact should be negligible, the 2027 revenue impact should be limited unless the initial 260 MW is delayed materially, and the more significant exposure lies in 2028-2030 capacity, revenue and free-cash-flow expectations.
Nebius nevertheless appears substantially better positioned than the typical speculative Pennsylvania data center developer. It already owns the site, has secured a dedicated Energy Service Agreement with PPL Electric Utilities, is paying for dedicated infrastructure, operates within a proactive data center zoning overlay, has conducted public engagement, proposes closed-loop cooling, and expects approximately 1,000 construction jobs and 100-150 permanent jobs. These characteristics are closely aligned with the GRID requirements. The order therefore adds meaningful execution risk, but it may also eliminate less advanced competing projects and increase the scarcity value of Highridge if Nebius successfully completes it.
THE MOST IMPORTANT ISSUE IS GRANDFATHERING
The executive order does not retroactively cancel every permit or prohibit projects already in development. The new permitting process applies to permit or authorization applications submitted after August 18, 2026. This distinction is highly relevant for Nebius because the project had already entered development before the order and Nebius had executed a dedicated PPL Energy Service Agreement.
The model Consent Order contains a more flexible “existing permittee” pathway for a project that, by August 18, 2026, had both submitted a DEP permit application and executed a binding Electric Service Agreement or Transmission Security Agreement. Public Pennsylvania DEP records show a Chapter 102 Individual NPDES permit transfer associated with Highridge DC Propco LLC dated May 18, 2026. If Highridge DC Propco is the relevant Nebius project entity, the permit is within the scope of the Nebius campus, and the PPL agreement is binding for purposes of the model language, Highridge appears likely to satisfy the 2 threshold requirements for existing-permittee treatment. That conclusion still requires formal confirmation from Nebius and DEP.
Existing-permittee treatment would be economically important. Under the standard GRID provisions, a developer must procure sufficient incremental capacity to meet peak demand and sufficient incremental energy to match full annual consumption. The existing-permittee addendum instead allows capacity compliance through a binding exclusive capacity contract, PJM’s Reliability Backstop Procurement process, or another arrangement demonstrating that the new load will not impose additional costs on non-cost-causing ratepayers. This is a materially more achievable standard for Nebius given its existing PPL agreement.
However, the project should not be treated as completely grandfathered. A pre-order stormwater permit does not necessarily cover all air, water, construction, transmission, backup-generation and later-phase authorizations required for a 1.2 GW campus. Any new applications submitted after August 18 can bring the relevant project phase into the GRID process. The project’s July 2026 Phase 1 site plan was expressly identified as a draft and not final, indicating that at least some design and land-development work remained. The order also requires all applicable municipal, subdivision and land-development approvals before DEP can issue qualifying permits.
The likely practical outcome is therefore differentiated by phase. The initial 260 MW appears materially more defensible than the full 1.2 GW. The expansion from 260 MW to approximately 600-660 MW likely has a credible pathway but may require additional permits and contractual amendments. The final approximately 540-600 MW should be treated as long-dated development optionality until there is evidence of corresponding transmission infrastructure, project-specific permits, qualifying generation and municipal approvals.
Nebius’s pre-existing zoning is another meaningful advantage. The Highridge property is located within a data center overlay, reducing the probability of a fundamental zoning rejection. Nevertheless, zoning eligibility is not equivalent to completed land-development approval. Local authorities retain leverage over subdivision, traffic, stormwater, building design, emergency services, noise and community-benefit arrangements. Nebius’s local engagement and pre-existing overlay materially lower this risk, but do not eliminate it.
The removal of all data centers from Pennsylvania’s Fast Track program is a negative for schedule certainty, although no reviewed public disclosure confirms that Highridge itself had been accepted into Fast Track. Consequently, the direct impact is best described as the loss of a potential acceleration mechanism rather than the confirmed removal of a benefit already embedded in Nebius’s schedule.
POWER PROCUREMENT IS THE CENTRAL FUNDAMENTAL RISK
Nebius’s PPL agreement is a substantial mitigating factor. The company states that the agreement provides for new infrastructure built exclusively for Highridge and that Nebius will bear the full cost. This is directionally consistent with GRID’s requirement that the data center pay all directly attributable transmission, distribution, dedicated-facility and network-upgrade costs. Nebius is therefore less exposed than developers that have merely reserved load positions or assumed that grid costs would be socialized across utility customers.
The company’s assertion that residential bills will not increase is not, by itself, sufficient for regulatory compliance. The model agreement contemplates an Electric Service Agreement under tariff terms no less stringent than the Pennsylvania PUC’s final large-load model tariff and requires treatment of embedded system costs. PPL and Nebius may therefore need to amend the existing agreement, add financial security, establish minimum billing obligations, provide credit support or accept additional cost-allocation provisions. The impact should be manageable for Nebius, but the existing agreement cannot yet be assumed to satisfy the final GRID standard automatically.
The clean-firm energy requirement is more clearly incremental. GRID requires qualifying in-state clean-firm energy equal to 10% of annual electricity consumption through the beginning of 2030, 14.5% from 2030 through the beginning of 2035 and 32% thereafter. A developer can make an alternative compliance payment for any shortfall, with the payment rate tied to the estimated unsubsidized solar levelized cost published by the US Energy Information Administration.
Nebius’s planned 30-minute battery system does not appear sufficient to satisfy the clean-firm definition. The model agreement generally requires a battery system to provide at least 2 hours of continuous discharge, unless DEP approves another duration. Highridge’s disclosed battery is designed for approximately 30 minutes of backup and redundancy. It may assist with reliability and outage management, but it should not currently be modeled as the project’s GRID-compliant clean-firm resource.
Assuming a 90% load factor, the initial 260 MW phase would consume approximately 2.05 TWh per year and would require approximately 205 GWh of clean-firm energy under the 10% standard. At a fully built 1.2 GW campus, annual consumption would approximate 9.46 TWh. The 14.5% requirement would represent approximately 1.37 TWh annually, while the 32% requirement beginning in 2035 would represent approximately 3.03 TWh annually. These are meaningful procurement volumes.
The alternative payment provides an economic ceiling on this obligation. At 260 MW and a 90% load factor, every $10/MWh of alternative payment rate would cost approximately $2.0M annually. At 1.2 GW, every $10/MWh would cost approximately $13.7M annually under the 14.5% requirement and approximately $30.3M annually under the 32% requirement. The clean-firm requirement is therefore a real operating-cost headwind but is unlikely by itself to destroy the economics of a fully utilized AI cloud campus.
Nebius also has a potential compliance advantage through its partnership with Bloom Energy. The company announced that it plans to deploy behind-the-meter fuel cells, and fuel cells are expressly included among the model’s eligible clean-firm technologies. A Highridge-specific fuel-cell deployment could address some portion of the requirement, provided it meets the incrementality, accreditation, emissions and deliverability standards. This provides a more credible compliance pathway than is available to many developers, although no Highridge deployment has yet been announced.
TIMING IS MORE IMPORTANT THAN THE DIRECT COMPLIANCE COST
The principal economic damage from the order would arise through delay rather than through water monitoring, public meetings or community-benefit spending. AI infrastructure returns are highly sensitive to speed because GPUs generate very high revenue when capacity is scarce, hardware generations turn rapidly, and fixed site and power expenditures produce no return before energization. Nebius reported Q2 AI cloud deals with annual contract value of $20M-$25M per MW and an estimated payback period of 1 year and 10 months. Although these figures should not be mechanically multiplied by gross campus power because PUE, utilization and hardware configuration matter, they demonstrate the unusually high opportunity cost of delaying commercially deployable capacity.
A 3-6 month delay to the initial 260 MW would probably have limited impact on 2027 reported revenue because the site is not scheduled to operate until October 2027, but it would reduce the company’s year-end capacity exit rate and shift a greater portion of revenue into 2028. A 6-12 month delay to the 660 MW target would have a more material effect on 2029 revenue, customer allocation and cash generation. The largest valuation sensitivity is the possibility that the final approximately 540 MW is delayed beyond 2030, relocated or never developed.
This is particularly relevant because Nebius’s valuation increasingly depends on the conversion of “contracted power” into connected, equipped and revenue-producing capacity. The order widens the gap between those categories. A signed land and power commitment remains economically valuable, but Pennsylvania now requires additional evidence of local approval, qualifying generation, cost allocation and legally binding compliance before that power can be monetized. Investors should therefore apply a lower probability and longer duration to the Highridge capacity rather than removing the entire 1.2 GW from the model.
The opportunity cost is partly mitigated because GPUs and customer demand can be redirected to other Nebius locations. The company has expanded across multiple US and international markets and introduced an asset-light model under which partners finance the land, facility, power and hardware while Nebius supplies the cloud platform, architecture and go-to-market capability. This provides a strategic release valve if Pennsylvania capacity is delayed. Nevertheless, large power blocks are not perfectly fungible, and replacing a 260 MW or 660 MW campus on a comparable schedule would be difficult.
BALANCE-SHEET AND FINANCING IMPLICATIONS
Nebius has the financial capacity to absorb ordinary GRID compliance costs. It ended Q2 with approximately $8B of cash, expects more than $9B of customer prepayments during 2026, has more than $40B of customer commitments and stated that prepayments on Q2 transactions covered approximately 50%-60% of associated capital expenditures. These resources materially lower the risk that additional transmission contributions, clean-energy contracts, community payments or monitoring requirements become a liquidity problem.
The more significant financing concern is the model Consent Order’s contingent liability. The template establishes a negotiated civil-penalty range of $25,000-$100,000 per MW of rated capacity per day for violations of the energy obligations. Applied mechanically, this would represent $6.5M-$26M per day at 260 MW and $30M-$120M per day at 1.2 GW. These figures should not be treated as expected cash costs. The template expressly permits project-specific modification, and the final terms are likely to be heavily negotiated. Nevertheless, such potential liabilities can affect project finance, debt covenants, insurance, parent guarantees, power-supplier indemnification and the willingness to commit to a fixed energization schedule.
Nebius’s owner-operator structure is both an advantage and a disadvantage. It avoids much of the landlord-tenant friction faced by merchant data center developers and allows Nebius to integrate facility, power and cloud operations. Conversely, the GRID obligations and penalties would sit more directly with the Nebius project entity. The model also requires applicable tenants, owners and operators to be bound to the Consent Order, makes DEP a third-party beneficiary of relevant contracts and requires disclosure of tenant or major-user identities. This could complicate dedicated-capacity contracts with hyperscalers, particularly if a customer controls a large portion of the campus. Ordinary cloud customers may not constitute “tenants,” and the scope will require legal interpretation.
Nebius’s already-committed site and infrastructure spending is less fungible than GPU spending. If permitting is delayed, land, engineering, interconnection and civil-work capital can sit idle while incurring carrying costs. GPUs intended for Highridge can potentially be assigned to other locations before installation, reducing hardware-stranding risk. The principal return risk is therefore lower site-level IRR and delayed monetization rather than a wholesale impairment of GPU assets.
TAX-INCENTIVE RISK COULD BE FINANCIALLY MATERIAL
The executive order directs Pennsylvania’s Department of Revenue to condition new applications for the state’s Computer Data Center Equipment sales-and-use-tax exemption on GRID compliance. Pennsylvania ordinarily imposes a 6% sales tax, and the exemption covers qualifying servers, networking equipment, cooling systems and other data center equipment. Every $1B of otherwise qualifying purchases represents up to approximately $60M of tax exposure. Given the potential equipment scale of a 1.2 GW AI campus, the total benefit could ultimately be measured in hundreds of millions of dollars.
The order does not automatically eliminate the exemption for Nebius. If Highridge executes a compliant Consent Order and obtains the required certification, the project should retain a pathway to the benefit. Nebius’s design and economic commitments suggest compliance is achievable. The larger risk is that legislative or judicial developments alter the exemption itself, but that is a related Pennsylvania policy risk rather than a direct consequence of this order.
AREAS WHERE NEBIUS IS ALREADY WELL ALIGNED
The workforce standards should be readily achievable. Nebius projects approximately 1,000 construction jobs, 100-150 permanent jobs and a multi-billion-dollar investment. GRID requires at least 200 prevailing-wage construction jobs, 50 qualifying permanent jobs and $250M of cumulative investment. The remaining questions are wage levels, Pennsylvania hiring, apprenticeship participation and the legal form of the commitments rather than the absolute scale of employment or investment.
The environmental standards also appear manageable. Highridge is designed around closed-loop and air-cooled systems, a 30-minute battery system, noise mitigation and public community engagement. GRID’s additional requirements for performance certification, Tier 4-equivalent or zero-emission backup systems, water planning and public air-quality monitoring will add cost and process, but are unlikely to be determinative relative to power procurement and permitting.
Nebius’s Aug. 6 public open house, local education proposals and stated community-benefit program also position it better than developers that assembled projects confidentially. Additional meetings and a formal community-benefit agreement will probably be required, but the project has already begun building the stakeholder infrastructure demanded by the order.
INVESTMENT SCENARIOS
In a favorable outcome, DEP confirms that the project qualifies for existing-permittee treatment, the PPL agreement satisfies or is amended to satisfy the large-load cost-allocation rules, local approvals are completed, and the project-specific Consent Order contains reasonable penalties and cure provisions. The 260 MW October 2027 date is preserved or slips only modestly, while the 660 MW and 1 GW milestones remain broadly intact. In this outcome, the order creates incremental cost but also removes competing Pennsylvania capacity, potentially improving long-term utilization and pricing.
In the base outcome, Phase 1 remains viable but is delayed approximately 3-6 months, the expansion to 660 MW is delayed approximately 6-12 months, and the final buildout is pushed beyond the currently indicated schedule. Nebius procures clean-firm energy or makes alternative payments, revises its PPL agreement, and enters a community-benefit agreement. The 2026 outlook remains unchanged, the effect on 2027 revenue is modest, and the larger estimate reductions occur in 2028-2030.
In the adverse outcome, DEP does not treat the existing permit and PPL agreement as covering the entire project, later phases become subject to the full incremental-energy regime, municipal approvals become contentious, and the project-specific Consent Order remains commercially onerous. The first 260 MW is delayed by more than 12 months and a substantial portion of the later 940 MW is deferred, resized or redirected to other states. Nebius can mitigate the lost capacity through alternative sites and asset-light partnerships, but the company would suffer lower owned-capacity growth, weaker capital efficiency and a higher execution-risk discount.
VALUATION TREATMENT
The full 1.2 GW should not be removed from a Nebius valuation model. The project has too much tangible progress, including land control, a PPL agreement, pre-order permitting activity, applicable zoning and active development, for a cancellation assumption to be reasonable. Conversely, the entire 1.2 GW should no longer receive equivalent probability or timing credit.
A reasonable interim framework is to give high probability to the initial 260 MW, medium probability to the next approximately 400 MW and substantially lower probability to the final approximately 540 MW until Nebius confirms existing-permittee eligibility and provides an updated regulatory schedule. The immediate model adjustment should primarily shift capacity and revenue to later years rather than eliminate demand or reduce 2026 estimates.
The most useful near-term diligence items are formal confirmation that Highridge qualifies for Addendum A, identification of which permits and phases were submitted before August 18, confirmation that the PPL agreement satisfies GRID and PUC requirements, disclosure of the clean-firm procurement strategy, execution of a project-specific Consent Order, completion of local land-development approvals, and reaffirmation or revision of the October 2027 energization target.
FINAL INVESTMENT CONCLUSION
The order is a moderate negative for NBIS’s medium-term capacity conversion and valuation multiple, but a low-impact event for current revenue and 2026 earnings. The central risk is a longer and more expensive path from contracted power to revenue-producing compute. The initial 260 MW appears relatively well protected, while the later expansion phases deserve a larger timing and probability discount.
Nebius is also one of the better-positioned developers to comply. Its dedicated PPL agreement, ability to fund infrastructure, proactive zoning, closed-loop design, large employment commitment, customer prepayments and potential fuel-cell solution materially reduce the probability of project failure. The policy may ultimately strengthen Nebius’s competitive position by eliminating speculative projects that cannot meet similar requirements.
A stock reaction that assumes the entire 1.2 GW campus is lost would be excessive. A reaction that applies no additional execution discount would also be unjustified. The appropriate fundamental treatment is unchanged 2026 estimates, limited 2027 revisions, higher 2028-2030 timing risk, modestly higher project costs and lower probability credit for the final stages of the 1.2 GW buildout.
PENNSYLVANIA DATA CENTER EXECUTIVE ORDER: INVESTMENT COMMITTEE ANALYSIS
EXECUTIVE ASSESSMENT
The Aug. 18, 2026 announcement is materially more consequential than a conventional environmental-policy statement, but materially less absolute than the social-media language implies. Executive Order 2026-05 does not impose a statewide moratorium and does not categorically prohibit AI data centers. It creates a state-controlled gatekeeping regime that uses environmental permitting sequence, legally binding consent orders, municipal land-use approvals, tax-incentive administration, public disclosure and regulatory advocacy to force large data centers into a “committed tenant plus incremental power plus local consent plus enforceable operating obligations” development model. The primary near-term effect should be a reduction in the probability, speed and valuation of speculative Pennsylvania projects rather than a collapse in committed hyperscale construction. The principal strategic winners are projects with identified end users, binding power arrangements, advanced permits, supportive municipalities and well-capitalized sponsors. The principal losers are land aggregators and merchant developers whose valuations depend on confidential site assembly, preliminary utility inquiries, uncommitted power capacity, tax incentives and accelerated permitting.
The most important investment conclusion is that the order should not be interpreted as a broad negative for aggregate US AI infrastructure demand. It is a negative for Pennsylvania-specific development optionality, a potentially significant positive for the scarcity value of already-permitted and deliverable power, and a catalyst for geographic displacement and industry consolidation. Demand that cannot be accommodated in Pennsylvania can migrate to Ohio, West Virginia, Virginia, Maryland or other markets, including locations elsewhere in PJM. Consequently, the order is more likely to change the location, sponsorship, power architecture and timing of capacity than to destroy the underlying demand for AI compute. The transmission mechanism is therefore delay, displacement and concentration rather than fundamental demand destruction.
The order also provides an unusually clear indication that headline data center pipelines are materially overstated. Pennsylvania has received reports of more than 100 proposed facilities, but DEP had permit applications related to only 20 facilities at the effective date, while 14 existing or developing locations held active data center tax-exemption certificates. The administration separately stated that most proposals lacked financing, power access or identified technology tenants, and that only 5 projects had the permits required to begin operating. The discrepancy between announced projects and projects with permitting, power and customer commitments supports a substantial probability haircut to gross utility and developer pipeline figures across the sector.
The hidden economic substance is more severe than the tweet itself. The 33-page model Consent Order and Agreement requires covered projects to match peak demand with incremental capacity, match full annual consumption with incremental energy, document binding and potentially exclusive claims on the supporting resources, bind tenants and future owners to the agreement, accept substantial reporting and environmental obligations, and waive important appeal rights. Violations of the energy obligations can carry a negotiated template penalty ranging from $25,000 to $100,000 per MW of rated capacity per day. At 500 MW, the indicated range would equal $12.5M-$50M per day; at 1 GW, it would equal $25M-$100M per day. The final amount will be project-specific, and enforceability will likely be contested, but the contingent liability is sufficiently large to affect financing, lease documentation, parent guarantees, indemnities and board-level site-selection decisions.
The order is therefore best characterized as a regulatory sorting mechanism. It should eliminate many “paper projects,” raise barriers to entry, improve the relative position of hyperscalers and large infrastructure sponsors, and increase the value of credible power and municipal relationships. It should also raise the Pennsylvania policy-risk premium. In May 2026, the administration described GRID-compliant projects as eligible for Fast Track permitting; less than 3 months later, the executive order removed every data center from Fast Track, including existing participants. That abrupt reversal reduces confidence in future administrative assurances and increases the discount rate applied to Pennsylvania development even for compliant sponsors.
WHAT THE ORDER ACTUALLY DOES
The core permitting regime applies to any data center with peak demand above 25 MW, not merely to facilities marketed as “AI data centers.” At a 90% load factor, 25 MW represents approximately 197 GWh of annual electricity consumption, so the threshold captures hyperscale campuses, large wholesale colocation facilities and many cloud deployments while excluding smaller enterprise and edge facilities. The operative language covers permit or authorization applications submitted after Aug. 18, 2026. It does not expressly cancel previously issued permits or retroactively convert every operating data center into a GRID project.
A covered applicant signing a project-specific Consent Order and Agreement can obtain rolling DEP review. Permit issuance still requires documentation that the project is consistent with the applicable local comprehensive plan and has received all required municipal, zoning, subdivision and land-development approvals. A covered applicant refusing to sign can still submit a project, but DEP cannot begin its review until the local approvals and specified water and wastewater authorizations have been obtained; permits cannot be issued on a rolling basis; and the application is excluded from PAyback and Permit Decision Guarantee protections. The legal document therefore creates a highly disadvantaged non-GRID path rather than literally eliminating every pathway for a non-signatory.
This distinction is important because the governor’s public remarks are broader than the executed text. The remarks described GRID as nonvoluntary and stated that a developer refusing to comply would have “no pathway” to approval. The order itself explicitly specifies how DEP must process applications from developers that have not executed a GRID consent order. The practical result may still be commercially prohibitive because all local and water-related approvals must precede substantive DEP review, but the legal distinction will matter in litigation.
The phrase “approval from the local community” also overstates the formal legal mechanism. The order does not require a public referendum or give every resident an individual veto. It requires consistency with the local comprehensive plan and receipt of all approvals required under applicable municipal law. This meaningfully increases municipal bargaining power and gives local zoning or subdivision denial an additional state-level consequence, but the underlying local decisions remain subject to existing statutory standards and judicial appeal. Pennsylvania law states that Commonwealth agencies shall consider and may rely on comprehensive plans and zoning ordinances when reviewing funding or permitting applications; it does not expressly state that agencies must withhold all state permits whenever a local controversy exists.
Every data center, regardless of the 25 MW threshold, is removed from the PA Permit Fast Track Program and is ineligible for future participation. This is an immediate and relatively durable exercise of executive control over an executive-branch project-management program. Fast Track did not waive underlying environmental standards, but it coordinated agencies and increased schedule visibility. Its removal is economically material because time-to-power and time-to-revenue are critical determinants of AI infrastructure returns. Even a project that ultimately receives every permit can suffer lower IRR, higher interest carry, equipment-obsolescence risk and lost customer demand if regulatory sequencing becomes uncertain.
All agencies under the governor’s jurisdiction are prohibited from entering NDAs related to data center projects. DEP must create a public map showing permitting information for proposed projects known to DEP or DOR. Operating data centers must begin filing annual energy and water reports by July 1, 2027, including parent or major user identity, monthly electricity and natural-gas use, peak usage, water consumption, maximum-day water demand, pollution controls, on-site generation, waste-heat practices and forward consumption projections. These provisions should materially improve investor, utility and municipal visibility into which projects are real.
The NDA prohibition is not universal. It applies to agencies under the governor’s jurisdiction, not automatically to private landowners, private utilities, independent agencies, local governments or private-to-private negotiations. Existing statutory protections for trade secrets and confidential commercial information may also continue to apply. The order therefore reduces secrecy but does not make every commercial term public. Its largest effect will be on developers that previously used confidentiality with state economic-development officials to assemble land, secure permits and market projects before identifying a tenant.
THE CONSENT ORDER IS THE CENTRAL ECONOMIC DOCUMENT
The model Consent Order and Agreement converts policy aspirations into contractual and permit-level obligations. It is structured as a final DEP order entered into voluntarily by the project developer. The developer must agree that the document is legally binding, consent to the incorporation of its requirements into permits, waive challenges to the validity of the agreement, and accept limitations on appeals from later DEP decisions made under it. This structure is designed to address the legal problem that DEP’s environmental statutes do not clearly authorize every workforce, power-procurement or community-benefit condition contained in GRID. By obtaining contractual consent, the administration seeks to make obligations enforceable that might be difficult to impose unilaterally through ordinary rulemaking.
The energy obligation is more demanding than a conventional renewable-energy procurement commitment. A new project must build, bring or buy incremental capacity sufficient to meet its full peak demand and incremental energy sufficient to meet its full annual electricity consumption. The resources generally must be located within the same PJM Locational Deliverability Area, although resources outside the area may qualify if firm transmission or other verifiable deliverability can be demonstrated. For a 500 MW campus operating at a 90% load factor, the annual matching obligation would be approximately 3.94 TWh, in addition to 500 MW of accredited capacity. This requirement directly attacks the industry practice of reserving grid capacity or signing broad portfolio-level clean-energy agreements without securing a project-specific, deliverable supply stack.
Before the final operating permit can be issued, the developer must provide documentation of binding financial agreements that establish exclusive claims to the relevant capacity or energy. Exclusivity is particularly important for wholesale data center developers and hyperscalers that ordinarily procure generation across portfolios rather than assigning specific resources to a single campus. The requirement may force project-level PPAs, capacity contracts, transmission arrangements and credit support considerably earlier in the development process. It also creates a financing circularity: generators want creditworthy anchor-load commitments before construction, while data center sponsors want regulatory certainty before accepting long-duration power obligations.
The developer must pay all costs directly attributable to the project and all costs that would not have been incurred but for its load, including transmission, distribution, network upgrades and dedicated facilities. The conceptual objective is economically defensible: incumbent customers should not subsidize infrastructure required by a new 500 MW or 1 GW load. The implementation will be more complicated because large network investments can simultaneously serve the data center, improve system reliability and benefit other users. The eventual allocation between customer contributions, tariff surcharges and utility rate base will determine whether the policy is merely ratepayer-protective or also reduces utility earnings opportunities.
Clean-firm energy must represent 10% of annual electricity consumption beginning Jan. 1, 2027, 14.5% beginning Jan. 1, 2030 and 32% beginning Jan. 1, 2035. For a 500 MW campus at a 90% load factor, the corresponding annual clean-firm volumes would approximate 394 GWh, 572 GWh and 1.26 TWh. The model defines qualifying clean-firm resources broadly to include incremental nuclear, hydroelectric, geothermal, fuel cells, qualifying hydrogen, solar or wind paired with storage, batteries and long-duration storage. Existing generation generally must have entered service, been uprated or improved after Jan. 1, 2025 to qualify as incremental.
The clean-firm requirement is not an absolute physical procurement mandate. The model permits an alternative compliance payment for any shortfall, with the payment rate linked to the estimated levelized cost of unsubsidized solar generation in the latest US Energy Information Administration outlook. That provision places an economic ceiling on the clean-firm requirement and makes the obligation more manageable for projects unable to secure qualifying resources. The alternative payment applies to the clean-firm tranche, not to the broader obligation to procure full incremental capacity and annual energy. The central bottleneck therefore remains deliverable incremental supply rather than the 10%-32% clean-firm percentage alone.
The agreement materially changes leasing and ownership structures. Every contract with a tenant, owner or operator must bind that party as a successor or assign, and DEP must be made a third-party beneficiary with respect to applicable obligations. A developer must disclose a tenant within 5 business days after executing a commercial agreement and must disclose the relevant common parent shortly after such a relationship is established. These provisions can shift compliance risk from the development SPV into hyperscaler leases, require extensive indemnification and credit negotiations, and make it harder to sell a partially developed campus without DEP involvement.
A sale does not automatically terminate the original developer’s obligations. The model provides that transferring the developer, the site or part of the site does not diminish the obligations unless DEP agrees, in its discretion, to modify or terminate them. The original developer remains exposed to violations caused by successors and assigns absent such relief. This provision reduces the liquidity and option value of powered-land strategies built around entitlement, partial development and resale. It is substantially more burdensome for merchant developers than for hyperscalers intending to own and operate the site throughout its useful life.
The force-majeure clause is optional at DEP’s discretion and expressly excludes higher costs and the developer’s economic inability to comply. A generation delay, capacity-price spike or financing problem may therefore provide limited protection unless it independently qualifies as an uncontrollable event and DEP grants relief. Combined with the per-MW daily penalties, this should make lenders and corporate risk committees reluctant to accept a rigid peak-load commitment without substantial generation redundancy, contractual remedies against power suppliers and ramp flexibility.
Community obligations are also more concrete than the social-media summary suggests. The template contemplates at least 3 additional public meetings, municipal and adjoining-jurisdiction consultation, public comment on noise, viewshed and building design, a local hiring plan, prevailing-wage construction employment, and an offer of a community benefit agreement addressing traffic, noise, lighting, air quality, emergency services, aesthetics and financial contributions. Any executed community benefit obligations can become DEP permit conditions that the developer agrees not to challenge. Municipalities therefore obtain significant negotiating leverage over payments, infrastructure, emergency-response funding and project design, even though they do not receive a literal popular-vote veto.
The workforce thresholds are unlikely to be the primary barrier for a genuine hyperscale campus. GRID requires at least $250M of cumulative investment, 200 prevailing-wage construction jobs, 50 permanent jobs paying at least 125% of Pennsylvania’s average wage by the 4th anniversary, and at least $1.5M of annual site compensation thereafter. Most multi-hundred-MW campuses should exceed the investment and construction thresholds. The 50 permanent-job requirement could be more relevant for highly automated wholesale campuses, but it remains less economically consequential than power procurement, municipal approvals and schedule risk.
Environmental requirements include recognized efficiency certification, Tier 4-equivalent or zero-emission backup systems, restricted generator usage, water planning and at least 3 continuous air-quality monitors with public data. The standards do not impose a universal numerical PUE or WUE ceiling and do not categorically prohibit combustion backup. They instead create technology, monitoring, certification and process obligations that can be satisfied by sophisticated operators but materially raise cost and scrutiny for campuses proposing hundreds of diesel or natural-gas backup units.
PROJECT-STAGE IMPLICATIONS
Operating data centers and projects with issued permits are the least exposed. The order does not expressly revoke existing permits. Operating facilities primarily face reporting obligations beginning in 2027. However, expansions, additional buildings, new generators, water infrastructure or later campus phases can require post-effective-date permits and may therefore bring part of an existing campus within the new regime. A project cannot be treated as fully grandfathered merely because land has been acquired or an initial permit has been issued.
Projects that had submitted a DEP permit application and executed a binding Electric Service Agreement or Transmission Security Agreement by Aug. 18, 2026 receive potentially important accommodation under the model COA. An addendum allows such projects to demonstrate capacity compliance through a binding capacity agreement, the PJM Reliability Backstop Procurement or another mechanism showing that the load will not impose costs on non-cost-causing ratepayers. This creates a valuable bright-line distinction between projects with genuine power commitments and projects holding only preliminary utility positions.
Projects with land, interconnection studies and municipal discussions but no binding tenant or power agreement are materially impaired. They must disclose the eventual end user, secure full incremental energy and capacity, accept local engagement, expose the project to public opposition and potentially bind future tenants to an environmental consent order before generating revenue. The carrying period should lengthen while the probability of monetization falls. Land values derived from projected megawatt capacity rather than executable power and permits should be marked down.
Completely speculative proposals are likely to be extinguished. That result is partly the policy objective rather than an unintended consequence. The order’s economic value to the state is that it can reduce false utility load forecasts, unnecessary transmission planning and local disruption caused by projects that have no anchor tenant, financing or realistic power source. The offsetting cost is that some legitimate early-stage projects may leave Pennsylvania rather than accept public disclosure and open-ended legal obligations before their commercial arrangements are mature.
The most investable asset becomes not raw acreage but acreage with local approvals, credible water access, advanced DEP permits, signed electric-service arrangements, qualifying incremental energy and an identified investment-grade tenant. Regulatory scarcity should widen the valuation gap between “powered shell” capacity and speculative development land. Existing operating colocation capacity can benefit from reduced future supply, while greenfield development yields need to incorporate longer duration and higher execution risk.
Stoggle Capital Management retweeted
$NBIS just secured approval to keep scaling Vineland after the planning board backed its expansion 9 to 1.
The vote clears construction to continue and locks in 300 MW of capacity at the site.
Stoggle Capital Management retweeted
In my 30-year investing career, I’ve never seen the market underestimate a growth curve the way it’s underestimating AI token generation.
Late last year, Dell put out an estimate that inference would run about one quadrillion tokens a month by the end of 2028. Their current estimate for the same date is 57 quadrillion. That’s a roughly 57x change inside a single year!
And Goldman Sachs has since published projections that sit an order of magnitude above Dell's revised number.
Stoggle Capital Management retweeted
Søren Kierkegaard on the Importance of Walking
“Above all, do not lose your desire to walk. Everyday, I walk myself into a state of well-being & walk away from every illness. I have walked myself into my best thoughts, and I know of no thought so burdensome that one cannot walk away from it. But by sitting still, & the more one sits still, the closer one comes to feeling ill. Thus if one just keeps on walking, everything will be all right.”
Insurance is the oldest of the four ways. It is a nine-trillion-dollar global industry. The equation underneath it was invented in 1560 by a broke Italian gambler.
His name was Girolamo Cardano. He wrote a book called Liber de Ludo Aleae. A short manual on how to win at dice. Nobody in finance read it for four hundred years.
Then in 1996 a ninety-year-old man in New York wrote a book that traced every modern risk model back to that manual. He called it Against the Gods. One thesis. Every dollar of premium ever collected on Earth is a footnote to a gambler scribbling in Milan.
His name was Peter Bernstein. He founded the Journal of Portfolio Management in 1974 and ran money at Bernstein-Macaulay before that. Wall Street called him the historian of risk.
In 2008 a small production company filmed him for thirteen minutes. He walked through the entire five-hundred-year arc. Cardano to Pascal to Fermat to Black-Scholes. Then he stopped and said the industry had built glass towers on the back of an idea a broke Italian scribbled to settle a card debt.
He died the following summer. Age ninety.
Reinsurance premiums crossed six hundred billion dollars last year. Every actuary on Earth prices catastrophe risk with the same expected-value framework Cardano invented to shave the house edge in Milan.
The video is thirteen minutes and twenty-two seconds long. Free. Eleven years on YouTube. Twenty-nine thousand people have watched it.
Almost none of them work in insurance.
Stoggle Capital Management retweeted
$PLTR
Palantir CEO Alex Karp when asked today after Q2 earnings about the frontier labs and their valuations:
Stoggle Capital Management retweeted
Archaeologists have officially discovered a massive, completely lost ancient civilization hidden deep beneath the Amazon rainforest using advanced LiDAR laser technology. A sprawling, pre-Columbian network of cities that completely rewrites human history.
Stoggle Capital Management retweeted
AWS’ GPU crunch is giving companies such as Together, Runpod and Nebius an opening to win the next generation of AI startups.
Read more: thein.fo/4wcncOE
Stoggle Capital Management retweeted
Lego is boring.
Enter BYLT - real construction using real practices. From architect drawn blueprints to finished product... on a tiny scale.
Get your kit or order a la carte from the supply yard 👇
Readers added context they thought people might want to know
This entire campaign is AI generated, including the text, photos and video.
This may mislead people into thinking a real physical product has been developed and demonstrated when in fact there is no evidence of this, nor evidence that any real designs even exist.
x.com/quasistable/st…
Stoggle Capital Management retweeted
this Anthropic researcher wrote one of the best articles you can find here on AI research. obviously, Hamming's classic book is highly suggested to learn how to develop a "Research Taste".
Stoggle Capital Management retweeted
A 3D model of the solar system, driven by the sun's gravitation pull.
The solar system does not look like a flat spinning mobile. The sun hold 99.8% of the mass in the solar system and it's gravity keeps every planet , asteroid and comet locked in orbit around it.
Citadel CEO Ken Griffin explained on camera where global capital is repositioning over the next 4 years - "America is open for business again"
the man running a $65B hedge fund publicly broke down the tariff playbook, the crypto repricing, and where the smart money is moving right now
33-min at the NYT DealBook Summit and you'll see how a top GOP megadonor actually positions around a presidency
bookmark & watch - the rare interview where a Wall Street whale speaks plainly about his own bets
Citadel CEO Ken Griffin sat down with the man running Norway's $1.7T sovereign fund - the largest pool of capital on the planet
two of the biggest money figures alive talking openly about the AI bubble, Citadel culture, recruiting, and what's coming next
45-min and you'll hear how the people who actually move global markets actually think
bookmark & watch - this is the only podcast where both guests together move markets just by changing their minds
Stoggle Capital Management retweeted
Aujourd'hui je déconstruis la déconstruction.
La déconstruction est le virus mental le plus efficace jamais conçu contre une civilisation. Il a été fabriqué en France entre 1966 et 1980 par trois hommes : Foucault, Derrida, Deleuze. Il a été exporté aux États-Unis, hybridé avec le puritanisme racial américain, et il est revenu trente ans plus tard sous le nom de wokisme paralyser l'Occident entier. Voici comment il fonctionne, et pourquoi il faut le détruire.
La thèse est simple. Toute vérité n'est qu'un rapport de pouvoir déguisé. Tout texte sacré, toute loi, toute science, toute norme, toute hiérarchie, toute identité, toute institution cache en réalité une domination. Déconstruire, c'est montrer le rapport de force sous le vernis du vrai. C'est arracher le masque. C'est "démasquer".
Formulé comme ça, ça paraît inoffensif. Voire utile. Qui n'aime pas un peu d'esprit critique ? Le piège est là. La déconstruction se présente comme une méthode. Elle est en réalité une ontologie. Elle ne dit pas seulement "interrogeons les normes", elle dit "il n'y a *que* des rapports de pouvoir". La différence est civilisationnelle.
Une société qui interroge ses normes reste debout. Une société qui croit que ses normes ne sont *rien d'autre* que de la domination s'effondre. Parce qu'elle ne peut plus rien défendre. Plus une frontière, plus une loi, plus une science, plus une langue, plus une histoire, plus une biologie, plus une famille. Tout devient suspect. Tout devient négociable. Tout devient "construit donc déconstructible".
C'est la première raison pour laquelle c'est un virus. Il s'auto-réplique. Une fois inoculé, il transforme tout ce qu'il touche en cible. La science est patriarcale, donc déconstruisons-la. Le langage est colonial, donc réinventons-le. La méritocratie est raciste, donc abolissons-la. Le sexe est une construction, donc choisissons-le. Il n'y a plus de roc. Tout est sable.
Deuxième raison. Le virus est *non-falsifiable*. Si vous défendez une norme, c'est que vous êtes l'oppresseur. Si vous niez être oppresseur, c'est la preuve de votre privilège inconscient. Si vous citez des faits, vos faits sont contaminés par le pouvoir qui les a produits. Si vous citez la raison, la raison elle-même est blanche, masculine, occidentale. Il n'y a aucune sortie possible. Le système est conçu pour rendre toute objection irrecevable par définition.
C'est exactement la structure d'une secte. Et c'est exactement ce qui s'est installé dans les universités, les RH, les médias, les administrations, les conseils d'administration depuis vingt ans.
Troisième raison. Le virus s'auto-réfute mais ne s'auto-détruit pas. Si toute vérité est pouvoir, alors la phrase "toute vérité est pouvoir" est elle-même du pouvoir, donc sans valeur. Logiquement, la déconstruction se mord la queue dès la première phrase. Mais elle s'en moque. Parce qu'elle n'a jamais cherché la cohérence. Elle cherche l'efficacité politique. Et son efficacité politique est immense. Elle désarme ses ennemis et arme ses militants. Elle paralyse le défenseur et libère l'attaquant. C'est une arme asymétrique parfaite.
Quatrième raison. Le virus produit des humains diminués. Une génération entière a appris à déconstruire et n'a jamais appris à construire. Elle sait soupçonner, jamais admirer. Elle voit le pouvoir partout et la beauté nulle part. Elle peut produire mille pages sur le caractère opprimant de Shakespeare et zéro ligne qui vaille la peine d'être lue dans cent ans. Elle a confondu l'intelligence critique avec la pose critique. Elle est stérile par construction. Un esprit nourri à la déconstruction est un esprit qui ne sait plus rien édifier.
Cinquième raison, la plus grave. Une civilisation se tient debout sur trois piliers. La croyance qu'une vérité est accessible à la raison. La croyance qu'un bien se distingue d'un mal. La croyance qu'un héritage mérite d'être transmis. La déconstruction a méthodiquement dynamité les trois. Pas par méchanceté. Par jeu intellectuel, par fascination du soupçon, par haine de la bourgeoisie qui avait nourri ses prophètes. Mais le résultat est là. Une civilisation qui ne croit plus en sa vérité, ni en son bien, ni en son héritage ne se défend pas. Elle s'excuse en attendant la fin.
Voilà ce qu'on a fait. Voilà ce qu'il faut nommer.
La bonne nouvelle, c'est qu'un virus mental ne survit que tant qu'on lui cède l'autorité du discours. Il meurt dès qu'on cesse de jouer son jeu. Dès qu'on réaffirme tranquillement qu'il existe une vérité, un beau, un bien, un héritage. Dès qu'on cesse de demander la permission aux déconstructeurs pour bâtir. Dès qu'on refait. Dès qu'on transmet. Dès qu'on crée.
Les bâtisseurs ont toujours le dernier mot sur les commentateurs. Toujours. Parce qu'à la fin il reste ce qui est construit, et rien de ce qui a été déconstruit.
Alors aujourd'hui je déconstruis la déconstruction. Et demain je construis.
Je veux présenter mes excuses, au nom des Français, pour avoir enfanté la French Theory (qui a enfanté la pire des merdes idéologiques : le wokisme).
Nous avons donné au monde Descartes, Pascal, Tocqueville. Et puis, dans les ruines intellectuelles de l'après-68, nous avons donné Foucault, Derrida, Deleuze. Trois hommes brillants qui ont fabriqué, dans l'élégance de notre langue, l'arme idéologique qui paralyse aujourd'hui l'Occident.
Il faut comprendre ce qu'ils ont fait. Foucault a enseigné que la vérité n'existe pas, qu'il n'y a que des rapports de pouvoir déguisés en savoir. Que la science, la raison, la justice, l'institution médicale, l'école, la prison, la sexualité, tout n'est qu'une mise en scène de la domination. Derrida a enseigné que les textes n'ont pas de sens stable, que tout signifiant glisse, que toute lecture est une trahison, que l'auteur est mort et que le lecteur règne. Deleuze a enseigné qu'il fallait préférer le rhizome à l'arbre, le nomade au sédentaire, le désir à la loi, le devenir à l'être, la différence à l'identité.
Pris isolément, ce sont des thèses discutables. Combinées, exportées, vulgarisées, elles forment un système. Et ce système est un poison.
Car voici ce qui s'est passé. Ces textes, illisibles en France, ont traversé l'Atlantique. Les départements de Yale, de Berkeley, de Columbia les ont absorbés dans les années 80. Ils y ont trouvé un terreau qui n'existait pas chez nous : le puritanisme américain, sa culpabilité raciale, son obsession identitaire. La French Theory s'est mariée à ce substrat, et l'enfant de ce mariage s'appelle le wokisme.
Judith Butler lit Foucault et invente le genre performatif. Edward Said lit Foucault et invente le post-colonialisme académique. Kimberlé Crenshaw hérite du cadre et invente l'intersectionnalité. À chaque étape, la matrice est française : il n'y a pas de vérité, il n'y a que du pouvoir, donc toute hiérarchie est suspecte, toute institution est oppressive, toute norme est violence, toute identité est construite donc négociable, toute majorité est coupable.
Voilà comment trois philosophes parisiens, qui n'ont probablement jamais imaginé leurs conséquences pratiques, ont fourni le logiciel d'exploitation à une génération entière d'activistes, de bureaucrates universitaires, de DRH, de journalistes, de législateurs. Voilà comment on a obtenu une civilisation qui ne sait plus dire si une femme est une femme, si sa propre histoire mérite d'être défendue, si le mérite existe, si la vérité se distingue de l'opinion.
C'est de la merde pour une raison simple, et il faut la dire calmement. Une civilisation se tient debout sur trois piliers : la croyance qu'il existe une vérité accessible à la raison, la croyance qu'il existe un bien distinct du mal, la croyance qu'il existe un héritage à transmettre. La French Theory a entrepris de dynamiter les trois. Pas par méchanceté. Par jeu intellectuel, par fascination du soupçon, par haine de la bourgeoisie qui les avait nourris. Mais le résultat est là. Une génération entière a appris à déconstruire et n'a jamais appris à construire. Une génération entière sait soupçonner et ne sait plus admirer. Une génération entière voit le pouvoir partout et la beauté nulle part.
Je m'excuse parce que nous, Français, avons une responsabilité particulière. C'est notre langue, nos universités, nos éditeurs, notre prestige qui ont donné à ce nihilisme son emballage chic. Sans la légitimité de la Sorbonne et de Vincennes, ces idées n'auraient jamais traversé l'océan. Nous avons exporté le doute comme d'autres exportent des armes.
Ce qui se construit maintenant, en silicon valley, dans les labos d'IA, dans les startups, dans les ateliers, dans tous les lieux où des gens fabriquent encore des choses au lieu de les déconstruire, c'est la réponse. Une civilisation se reconstruit par les bâtisseurs, pas par les commentateurs. Par ceux qui croient que la vérité existe et qu'elle vaut qu'on s'y consacre. Par ceux qui assument une hiérarchie du beau, du vrai, du bon, et qui n'ont pas honte de la transmettre.
Alors pardon. Et au travail.
Stoggle Capital Management retweeted
This is it.
Everything learned spending millions on longevity.
From: Your Immortal Unc and Auntie.
To: Our Immortal nieces and nephews.
0. Sleep is the world's most powerful drug.
1. Be in your bed for 8 hours
2. Same bedtime every night, any time before midnight
3. Don’t eat right before bed
4. Calm foods for dinner
5. No screens 1 hour before bed
6. Avoid added sugar (be aware it’s in everything)
7. Avoid all things in an American convenience store
8. Avoid fried foods
9. Shoes off at the door
10. Eat whole foods, particularly veggies fruits nuts legumes berries
11. Walk a little after meals or air squats
12. Get your heart rate high routinely
13. Lift heavy things
14. Stretch daily
15. Water pik, floss, brush, tongue scrape, morning and night
16. Make an effort to drink water
17. Get sunlight when you wake up (UV is low)
18. Protect skin in midday sun
19. Stand up straight
20. See at least one friend once a week
21. Avoid plastic where you can (in all things)
22. Circulate air in rooms
23. When stressed, breathe, learn to calm your body
24. Go to the dentist
25. Avoid sitting for long times
26. Protect your hearing, the world is too loud
27. Alcohol is bad for you
28. Finish coffee before noon
29. Avoid bright lights after sunset
30. If obese, look into a GLP
31. Sleep in a cold room
32. Texting while driving is dangerous
33. Turn off all notifications
34. Limit social media use
35. Don’t smoke anything
36. If you struggle to sleep, read a physical book before bed
37. 1 hour before bed have a calm wind down routine: bath, read, light walk, listen to music
38. The body is a clock and loves routine. Have a daily morning and evening schedule.
39. Avoid long distance travel where you can
40. Baby steps first: incorporate new things slowly
41. Do less… most things don’t work.
Bonus points if you get your blood checked.
Start here, it will change your life.
Stoggle Capital Management retweeted
“Leading” Glass Substrate players that were name dropped if you’re curious:
• $LPK — TGV Equipment
• $GLW — Glass Materials
• $ASGLY (5201 T)— Glass Materials
• $NIDGY (5214 T) — Glass Materials
• $LRCX — Etching Systems
• $DSCSY (6146 T)— Dicing Equipment
• $SMHSF — Bonding Systems
• $ONTO — Inspection Tools
• $KLAC — Inspection Tools
Fun to see the stuff I’ve called out early in the year like LPK at ~$150m MC get mentioned as a critical player by Trendforce and others.
Nebius founder and CEO Arkady Volozh joined @Accel's Spotlight On podcast to discuss our approach to building for the AI era, including full-stack platform strategy, our partnership with NVIDIA, contract with Meta, capacity planning at scale, and the expansion of our inference platform.
Listen to the full episode: youtube.com/watch?v=w2BvO1Ul…
Stoggle Capital Management retweeted
“Reality in Layers.” The Stratified Cosmos.
I created this diagram, stimulated by storyality.wordpress.com/201…





































