JC (@JC_Webb) header
JC (@JC_Webb) profile picture

Blasian Futurist. Building in AI, data infrastructure & biotech. Founding Head of Growth @ https://teapaw.org/t.co/WeSlgoF2hR. SI Main Street Investments. Senior Advisor @ Naveh.

Joined February 2009
Photo by JC (@JC_Webb)Photo by JC (@JC_Webb)Photo by JC (@JC_Webb)Photo by JC (@JC_Webb)Photo by JC (@JC_Webb)Photo by JC (@JC_Webb)
JUST IN: Goldman Sachs estimates memory will account for roughly 40% of total hyperscaler capex in 2028
34
68
17
1,026
86,230
Replying to @elonmusk @XFreeze
The rental price for large, coherent blocks of compute configured for high-bandwidth training is increasing, sometimes very significantly, but the price for small amounts of compute (below ~5k GPUs) is decreasing. Overall, the average rental price per GPU for SpaceX compute is rising.
296
575
216
8,188
1,109,036
Texas 345kV substations, connected by 345 kV transmission lines, mapped as a transit-style diagram for #30DayMapChallenge Day 25: Is This a Map? I really put my agent team to work on this one. I wanted to create a transit-diagram visualization for Day 25 as I've always liked them, but this isn't something I've created before. So this ended up as a really interesting exercise in AI-driven development, which I'll share as a window into how I work these days. Here's how I did it: - I used a couple lead agents working locally on my computer (Fable 5.2 as lead dev, Astra 6.2 as lead reviewer / QC agent) who deploy subagents as needed - We re-used archived HIFLD transmission line and substation data from some of my other posts - The data doesn't include topology so the agents built it by matching each line's ends to the nearest substation using sf in R. - We couldn't reasonably show the whole network so I had the agents draw the network we'd show with ggplot2 and iterate through it to select the "hubs" for the diagram - I let Fable/Astra exercise judgment here - We then did a verification pass. To make sure every link on the diagram is real, I had the agents write R code to make sure that two stations are joined only if the source has a chain of 345 kV lines between them that doesn't pass through another station on the diagram. This caught some errors! - I then had Fable build the diagram. It's a "hand-rolled" (figuratively) SVG written straight from R, with hover text in JavaScript. The output HTML page is only 41 KB in size. - Astra then did a blind QC check - it rebuilt the network from the raw files on its own and checked all 66 links to verify them. Of course, this diagram is not to scale, is based on archived data, and leaves out most of the Texas grid - so the utility of a graphic like this is going to be in the eye of the beholder. This was a fun one to put together though and it really reflects how I like to work these days. The agents are writing very sophisticated R code (hand-rolling the SVG myself would have taken forever) but they're using tools (sf, tidyverse, etc.) that I trust and have used for years. Check out the diagram: walker-data.com/map-challeng… And all of this month's maps: walker-data.com/map-challeng…
7
6
1
75
5,047
The American Renaissance, mapped. I sourced every US project of about $1 billion and up: 154 sites in 36 states, from chip fabs and artificial intelligence data centers to launch sites, steel mills and shipyards. $2.45 trillion announced, $1.29 trillion already firm. 1/9
270
939
325
5,263
932,368
For all those people who keep predicting we're overbuilding chips / we aren't seeing jevon's paradox etc. Things are just getting started.
Replying to @fluxxrider
The prompt, by the way: make a presentation on the future of AI and basically the intelligence explosion. You can go full no anchor bias, like things are going to get crazy because they are. I want this presentation to be the most elaborately, insanely amazing presentation you've ever seen, with all sorts of graphics, transitions, whatever you want. I believe you can make it amazing because you have taste and you have the ability. Good luck, Claude. Opus 5.6 on xhigh (stealth tested on 5.5). I gave it **no creative direction** other than this. sorry this is it, AGI 2027 pack it up
105
330
113
2,672
520,084
JC retweeted
Replying to @chanduuu_cs
Energy. Compute is energy. Data needs energy to generate and move. Humans are slow, fragile, energy-limited bags of meat. Once pure intellect is solved, the hard limit is how much power you can actually deliver to turn solutions into physical reality. Thermodynamics does not negotiate.
1,788
1,615
1,227
15,220
6,049,850
I don't think many people realize how much behind-the-meter data center capacity is likely to come online in the coming years. Today's numbers look relatively small. 3.8 GW operating and 6.2 GW under construction, according to our tracker at Cleanview. But the pipeline is much bigger. There's about 125 GW of planned BTM capacity. People are right to be skeptical that all of this comes online. But there's about 82 GW in the pipeline that looks pretty legitimate and likely. These projects have equipment, named tenants, experience, and/or hyperscaler backing etc. Depending on how you cut the data, 20-30% of planned data center capacity is expected to come from BTM capacity. Some of that is from temporary turbines. But a ton of it is planned to operate for 10+ years. Amazon's GW Ranch is 7.65 GW of nameplate gas capacity and has no plans to interconnect. There's been a group of people who have been skeptical of these projects from the start and have convinced their audiences and followers they'll never be built. I don't pretend to be able to predict the future. But if you think BTM data centers will be inconsequential, you should update your priors and consider listening to a few new podcasts.
36
40
15
278
47,861
BREAKING: The United States now has 5,159 data centers, more than the next 9 countries with the most data centers combined. This includes operational facilities as well as projects that are planned, under construction, or land-banked. The US also accounts for 38.5% of the 13,384 facilities listed worldwide. The UK and Germany rank next, with 608 and 583, respectively. At the same time, China, France, and India have 488, 402, and 360 data centers, respectively. Among US states, Virginia leads with 728 data centers, followed by Texas and Georgia with 605 and 308, respectively. America is at the forefront of the global AI infrastructure expansion.
428
1,228
272
8,393
688,808
I’m getting DMs like this almost daily at this point.
169
124
11
3,650
105,538
there’s a disconnect in Silicon Valley where top researchers believe the data market will grow by 100X, but most employees and investors haven’t realized this
79
44
38
1,119
195,976
A waterfall of data, and only the rare drops are kept 💧✨ That's how FSD learns the tricky moments 🚗 Cheering from Okinawa 🇯🇵❤️
1
2
174
Replying to @Scobleizer
Tesla has Niagara Falls amounts of data. So much, that we will keep much less than a millionth of it. Unless the data is of a super weird, long tail event, it’s irrelevant.
252
394
50
8,537
261,450
Replying to @fchollet @garrytan
Getting this amount of compute turned on, cooled and working reliably is incredibly hard. The cash shortage is also going to be nuts next year. Even cumulative industry delays of a few months between paying for compute and getting it reliable enough to generate revenue will mean hundreds of billions of incremental dollars just for working capital. Where will that come from?
1,687
1,747
1,041
20,384
4,577,700
Replying to @JC_Webb @bgurley
Data efficiency could become just as important as chip performance in scaling AI.
1
1
14
From inception to $4.5B exit in 12 months…BRUH
19
54
3
1,260
71,359
After careful consideration I’ve decided I’m quite bullish on civilization KARDASHEV II HERE WE COME!
339
1,105
107
13,124
1,131,220
A 100MW datacenter in China now costs under $300M to build, excluding IT equipment, about a fifth of the US cost. China's build cost has fallen about 25% since 2021. (4/6)
11
71
52
562
297,312
The Hyperscaler takeover of Neoclouds begins *GOOGLE BUYS CRUSOE’S WYOMING DATA CENTER SITE
128
453
111
6,304
709,584
Tesla will be winding down production of the Cybertruck at Gigafactory Texas around the middle of next year to make room for increased Cybercab production
8,473
5,641
2,731
89,362
10,196,226
Defense funds realizing they have to pivot back to climate tech
114
1,751
178
31,789
562,042